Power Apex Instruction sheet

__________________________________________________
WARNING
UNPACKING SAFELY
Please follow these instructions to unpack your garden building safely
•Two people minimum to unpack
•Place the pallet on firm level ground
•Cut the plastic banding
•Remove each panel by removing screws one column at a time as indicated below
•Be careful of loose components inside the pack when removing panels
•Check all the components against the checklist prior to install
_______________________________________________________________________________________
BASE KIT AND FIXING PACK
Apex
Instruction Manual
Please note –if you have ordered a base kit it’s unlikely you will be able to see the base kit from the
outside of the pack - it will be inside your panels. The fixings are also inside the pack.

Before You Start
Most accidents are the result of negligence and carelessness, usually caused by the failure of the operator to
follow simple but necessary safety precautions.
Do not install the garden building before carefully reading this manual.
Visit www.Powersheds.com to check the base size for your shed and any other dimensions you may need.
Health & Safety
Every effort has been made during the manufacturing process to eliminate splinters on the timber.
You are strongly advised to wear gloves when working with or handling timber.
We also strongly advise you to wear safety glasses when installing the felt to protect your eyes.
2 persons recommended
Power Sheds Ltd cannot be held responsible for any damage or injury sustained due to incorrect unloading,
unpacking, or assembly of any of our products.
Tools Required
(not supplied)
Drill Spirit level Hammer Stanley knife Stepladder Saw Silicone
Our Treatment
Wear gloves when handling freshly treated wood.
Avoid breathing dust when cutting treated or untreated wood. Dispose of off-cuts responsibly –do not burn.
Contains: IPBC (3-iodo-2-propynyl-N-butyl carbamate) and propiconazole.
May produce an allergic reaction (EUH208). Causes serious eye irritation (H319) Wash skin thoroughly after
handling (P264) Wear protective gloves/protective clothing/eye protection/face protection (P280)
IF IN EYES: Rinse continuously with water for several minutes.
Remove contact lenses, if present and easy to do and continue rinsing. (P305 + P351 + P338)
If eye irritation persists: Seek medical advice/attention (P337+P313)
Page 3

Watch the build a base video:
www.powersheds.com/faqs/how-do-you-assemble-the-power-sheds-base-kit/
Timber
As timber is a natural product, it is prone to changes in appearance, including but not limited to movement, warping
and splitting, particularly in extreme weather conditions. There may be the occasional split, knot or similar visual
imperfections in the timber.
Whilst every effort is made to hand pick timber without visible knotholes or splits there may be occasions where
timber is selected in good faith that contains what appears to be a solid knot. Over the course of time/during
movement of the product, it may be that these small knot holes are then dislodged from the timber leaving a small
knot or crack.
Unfortunately, we cannot be held responsible for this maturing of the product and can only offer our best advice as
to how to deal with this situation in the unlikely event that it should occur. Our advice would be to apply some wood
filler to the area affected or in extreme circumstances to change the board over.
None of this should affect the structural integrity of the product.
Firm & Level Base
All our garden sheds require a firm and level base.
When thinking about where the garden building and base is going to be constructed:
•Ensure that there will be access to all sides for maintenance work and annual treatment.
•Remember not to place the base too close to any walls or fences, as there may be a slight
overhang on the roof which may come into contact with the wall or fence.
•Ensure the base is level and is built on firm ground, to prevent distortion.
•Refer to PowerSheds.com for base dimensions.
•Consider when placing the base next to trees or large bushes as this could cause problems
from overhanging branches. If these are likely to grow and come into contact with the
building in the future this could cause the felt to rip.
The base is slightly smaller than the external measurement of the building, i.e. The cladding should overhang the
base, creating a run for water.
It is recommended that the floor is at least 25mm above the surrounding ground level to avoid flooding.
If you have not chosen to purchase our Power Base, then other suitable bases would include a concrete base
(75mm of concrete on top of 75mm of hardcore) or a paving slab base (slabs laid on top of 50mm of sharp sand).
Power Base Kit
If you have ordered a Power Base Kit the instructions can be found in the small base kit fixing pack.
Please scan the QR code to watch our base kit installation video -
Page 4

Component Checklist
4x4
Floor
2x4
Floor
4x6
Floor
2x6
Floor
4ft
Blank
Panel
4ft
Window Panel
(Or additional blank
panels if
windowless)
2ft
Blank
Panel
Door
Panel
(Single or
Double)
4x4 Apex
Roof
Panel
(For 4ft wide)
2x4 Apex
Roof Panel
(For 4ft wide)
4x6 Apex
Roof Panel
(For 6ft wide)
2x6 Apex
Roof Panel
(For 6ft wide)
4ft Apex
Gable Top
6ft Apex
Gable Top
4x4 1 0 0 0 2 1 0 1 2 0 0 0 2 0
6x4 1 1 0 0 2 1 2 1 2 2 0 0 2 0
8x4 2 0 0 0 3 2 0 1 4 0 0 0 2 0
10x4 2 1 0 0 3 2 2 1 4 2 0 0 2 0
12x4 3 0 0 0 4 3 0 1 6 0 0 0 2 0
14x4 3 1 0 0 4 3 2 1 6 2 0 0 2 0
16x4 4 0 0 0 5 4 0 1 8 0 0 0 2 0
18x4 4 1 0 0 5 4 2 1 8 2 0 0 2 0
20x4 5 0 0 0 6 5 0 1 10 0 0 0 2 0
4x6 0 0 1 0 2 1 2 1 0 0 2 0 0 2
6x6 0 0 1 1 2 1 4 1 0 0 2 2 0 2
8x6 0 0 2 0 3 2 2 1 0 0 4 0 0 2
10x6 0 0 2 1 3 2 4 1 0 0 4 2 0 2
12x6 0 0 3 0 4 3 2 1 0 0 6 0 0 2
14x6 0 0 3 1 4 3 4 1 0 0 6 2 0 2
16x6 0 0 4 0 5 4 2 1 0 0 8 0 0 2
18x6 0 0 4 1 5 4 4 1 0 0 8 2 0 2
20x6 0 0 5 0 6 5 2 1 0 0 10 0 0 2
Page 5

1790x56
x44mm
Heavy Duty
Bearer
1190x56
x44mm
Heavy Duty
Bearer
4ft Truss 6ft Truss
Bargeboard
(For 4ft)
Bargeboard
(For 6ft)
1801
x58mm
Cover Lat
Diamond
Finial
Felt Fixing Pack
4x4 0 2 0 0 4 0 4 2 8ft Piece @ 1m wide 1
6x4 0 2 1 0 4 0 6 2 12ft Piece @ 1m wide 1
8x4 0 2 1 0 4 0 6 2 16ft Piece @ 1m wide 1
10x4 0 2 2 0 4 0 8 2 20ft Piece @ 1m wide 1
12x4 0 2 2 0 4 0 8 2 24ft Piece @ 1m wide 1
14x4 0 2 3 0 4 0 10 2(2x) 14ft Piece @1m wide 1
16x4 0 2 3 0 4 0 10 2(2x) 16ft Piece @ 1m wide 1
18x4 0 2 4 0 4 0 12 2(2x) 18ft Piece @ 1m wide 1
20x4 0 2 4 0 4 0 12 2(2x) 20ft Piece @ 1m wide 1
4x6 2 0 0 0 0 4 6 2
8ft Piece @ 1m wide
4ft Piece @ 0.5m wide
1
6x6 2 0 0 1 0 4 8 2
12ft Piece @ 1m wide
6ft Piece @ 0.5m wide
1
8x6 2 0 0 1 0 4 8 2
16ft Piece @ 1m wide
8ft Piece @ 0.5m wide
1
10x6 2 0 0 2 0 4 10 2
20ft Piece @ 1m wide
10ft Piece @ 0.5m wide
1
12x6 2 0 0 2 0 4 10 2
24ft Piece @ 1m wide
12ft Piece @ 0.5m wide
1
14x6 2 0 0 3 0 4 12 2
(2x) 14ft Piece @ 1m wide
14ft Piece @ 0.5m wide
1
16x6 2 0 0 3 0 4 12 2
(2x) 16ft Piece @ 1m wide
14ft Piece @ 0.5m wide
1
18x6 2 0 0 4 0 4 14 2
(2x) 18ft Piece @ 1m wide
18ft Piece @ 0.5m wide
1
20x6 2 0 0 4 0 4 14 2
(2x) 20ft Piece @ 1m wide
20ft Piece @ 0.5m wide
1
Page 6

The Fixing Pack
Your fixing pack will include:
•25mm screws
•35mm screws
•50mm screws
•70mm screws
•Clout nails (for the felt)
•Door handle
•Turn buttons
If you have ordered a Power Base, you will also receive 80mm and 100mm screws.
On the rare occasion that not enough screws are provided please contact us to make us aware so we can send
more out to yourself. Please be aware we are unable to reimburse if you purchase your own.
On the rare occasion that not enough screws are provided please contact us to make us aware so we can send
more out to yourself. Please be aware we are unable to reimburse if you purchase your own.
Pre-Assembly
1. Safely unpack your components and check that you have all the parts required.
Please use the table in the two previous pages to view which components are required for the size you have
ordered.
2. Carefully remove the pallet and any untreated packing timber.
See the aftercare section on ways to recycle these items or alternatively you can discard them.
3. Remove any transport blocks from the bottom of the blank and window panels. These are there to offer
further protection to the bottom board of the panel.
USEFUL TIP!
Re-treat the underside of the floor before assembly for additional protection and maximum longevity.
Drilling
In the instructions we will talk about screwing panels together.
We recommend that this is done with a drill as will minimise the chance that the timber will split.
We suggest that you pre-drill the timber with a 3mm drill bit before inserting the screws.
Page 7

Floor
1. Lay down your floor panel(s) onto your firm and level base into the desired position of your shed. Be
sure to consider any overhangs on the shed when deciding the correct position as per the instructions
regarding bases in the ‘before you start’ section. You will also need to ensure you leave sufficient
space around the building to be able to fix the cover lats, apply the felt and give the building it's
annual treatment.
NOTE: Do not confuse floor panels with roof panels.
Floor panels will have more pieces of framing attached.
2. Turn the floor sections upside down so that the floor bearers are facing up and the floor boards are
running in line with each other. Join the floor panels together using the 50mm screws provided, using
around three screws per join.
3. At this stage, screw the two ‘heavy duty bearers’, which are two pieces of framing joined together, to
each gable end (the end where the triangular ‘gable tops’ will go later – especially important on 4x4
and 6x6 sheds where the bearers could accidentally be put on the wrong side).
4. Join the bearers by screwing through the floor joists first so the screw goes as far into the bearer as
possible.
a. For 4ft wide Power sheds (4x4, 6x4, 8x4, 10x4, 12x4, 14x4, 16x4, 18x4, 20x4) use the
1190mm heavy duty bearer provided.
b. For 5ft wide Power Sheds (7x5) use the 1490mm heavy duty bearers provided.
c. For 6ft wide Power sheds (4x6, 6x6, 8x6, 10x6, 12x6, 14x6, 16x6, 18x6, 20x6) use the
1790mm heavy duty bearer provided.
5. Once screwed together, turn the floor the correct way up.
Note –The method of turning the floor over is suitable for sheds up to 12ft long.
If the shed is over 12ft long, then you may struggle to turn the whole floor over.
For floors over 12ft long this method should be followed but to do it in two halves.
USEFUL TIP! –If you have purchased a Power Base you can screw the floor to the timber
Power base below for maximum strength and security.
(image showing two heavy duty bearers being attached to each end of the floor)
Reminder
Ensure bearers are added
to the floor!
Page 8

Door
1. Your building will either come with a single door or a double door depending on what you selected when
ordering. Double doors are already hung on the door panel. However, for a single door you will need to
hang the door. The key is screwed to the back of the door on the underside of the framing.
For a single door you can choose which way round to hang it –left hand or right hand.
Note –If you choose a left-hand hinged door then the lock must be unscrewed and positioned the
correct way round as it will be upside down
2. For a single door, lay the door panel on the floor and line up the door onto the framing so that it is
square. The door should be positioned centrally, with an even gap on both sides.
Make sure the lock is on the inside of the shed when the door is closed. Secure the hinges in place
using the 25mm screws provided.
3. Choose two places on the door to secure your two turn buttons –one towards the top, one towards the
bottom. For double doors a turn button will already be secured. Be careful not to screw this too tightly
or it will not turn.
(Example image - The style of door may vary depending on the building you have ordered)
Important!
Make sure the door is unlocked before the next stage or once you have assembled the side walls you will
not be able to get in your shed.
Page 9

Walls
1. Please ensure you have removed the transport blocks as per the pre-assembly section.
2. Your garden building will come with a number of wall sections. The quantity of these will depend on
the type and size you have ordered. Please see the components table on the previous pages to
confirm which panels you should have for your shed.
3. Lay out the wall panels in the configuration you want for your garden building.
The blank panels, door panel and window panels can go in any position.
We give you the ‘power’ to choose how you want your shed!
Note –Trusses (discussed later) will be positioned in line with the joins in the wall panels, so ensure
these joins match on opposite sides (this is important if your shed comes with 4ft and 2ft wall panels).
4. Start with the 4ft panel (or 3ft panel for a 7x5) that will be part of your gable end and position this on
top of one of the heavy-duty bearers which you attached in the previous section. Ensure the side of
the panel is flush with the side of the floor.
5. If your Power shed is 5ft or 6ft wide (4x6, 6x6, 7x5, 8x6, 10x6, 12x6, 14x6, 16x6, 18x6, 20x6) then you
will need to position one of the 2ft blank panels next to the 4ft (or 3ft for the 7x5) wall panel you have
chosen to complete the gable end.
6. Secure these panels together from the inside using the 50mm screws provided. Use three screws per
join.
Important!
When securing panels together ensure they line up at the top (so the building is square) and that only
the ends of the cladding are shown, which will later be covered with cover lats).
7. Place another wall panel at a right angle to the gable end wall panels for the side walls and again
secure using the 50mm screws provided. See the image below as an example -
Page 10

8. Continue doing this to place all remaining wall panels in position.
9. When you have secured all the wall panels (door panel, 2ft, 3ft and 4ft blank panels, window panels) you
then need to secure these to the floor using 70mm screws provided.
10. Screw into the floor with 2x screws for every wall panel ensuring the screws are driven through the framing
at the bottom of the side/gable walls, through the floorboards and into the floor joists.
11. Please see the Aftercare section of this booklet for more information regarding sealing your window.
USEFUL TIP!
You can work out the position of the floor joists from the location of the existing nails in the floor. If
the upright framing or corner brace is in the way you would need to nail down into the floor joists at
an angle.
If you are securing these panels against a wall (which gives you little access to nail the cover strips on,
explained later) you can pre-assemble a side and move the whole side into position (with the cover
lats already nailed on)
Page 11

Gable Tops
1. Line up the gable tops with the panels at the gable ends (the ends where you attached the ‘heavy duty
bearers’).
2. Secure them to the wall panels with 50mm screws from the inside, screwing upwards through the
framing.
Trusses
1. The trusses should be attached to the side wall panels with 40mm galvanised nails. The trusses will
line up with the joins in the side wall panels. Ensure the end of the truss goes to the outer edge of the
framing on the side walls and not the cladding (so the roof will sit right).
2. Nail down through the truss into the top of the side walls.
Please note: You will not receive a truss for a 4x4 or 4x6 shed.
Page 12

Roof
1. Depending on the size building you have ordered, your roof panels will be 600mm, 1190mm or
1302mm long -
4x4
4x6
(2x) 1302mm long roof panels
6x4
6x6
(2x) 1302mm long roof panels, (2x) 600m long roof panels
8x4
8x6
(4x) 1302mm long roof panels
7x5
(2x) 1302mm long roof panels and (2x) 890mm long roof panels
10x4
10x6
(4x) 1302mm long roof panels, (2x) 600m long roof panels
12x4
12x6
(4x) 1302mm long roof panels, (2x) 1190m long roof panels
14x4
14x6
(4x) 1302mm long roof panels, (2x) 1190m long roof panels, (2x) 600mm
long roof panels
16x4
16x6
(4x) 1302mm long roof panels, (4x) 1190m long roof panels
18x4
18x6
(4x) 1302mm long roof panels, (4x) 1190m long roof panels, (2x) 600mm
long roof panels
20x4
20x6
(4x) 1302mm long roof panels, (6x) 1190m long roof panels
Note –The roof panels are not handed, it does not matter which way round they go.
The tongue and groove does not need to interlock
2. The 1302mm roof panels will go at each end of the roof with the other roof panels central.
This will ensure the joins in the roof panels line up with the joins in the wall and the roof trusses and
the slightly longer 1302mm roof panels will mean there is an overhang at each end (except on the 4x4,
4x6, 6x4, 7x5 and 6x6 Power Apex where there is no roof overhang).
The only time the roof panels won’t line up with the truss and join inside walls is if you have
positioned a 2ft side wall panel at one end (and also on a 6x4, 6x6 and 7x5) –in these occurrences, the
truss will line up with the join in the side walls panels, but the join in the roof panels will be slightly
offset to the truss.
3. There are batons to help join the roof panels together. If you start by joining the batons to the roof
panels with 50mm screws as per the diagram below, and then place the roof panels in position (the
roof panels are universal so can go on either side).
Page 13

4. Start at one end placing a roof panel at each side and screw the roof panels together (internally) using
70mm screws.
5. You can then work down the roof adding and joining roof panels to the baton on the adjoining roof
panels with 50mm screws and joining the roof panels to each other with 70mm screws until all the
roof panels are on. There should be 6x screws joining the roof panels together every 4ft.
6. Ensure the roof panel overhang at each end of the shed is even –there should be an approximately
56mm overhang at each end.
Note –there will be no roof overhang at the gable end on the 4x4 or 4x6 Power Apex.
7. Then, screw the roof panels to the side wall panels with 50mm screws (ensuring you screw down into
every upright piece of framing on the side walls) and screw the roof panels into the gables at each end
with 35mm screws (4x screws for each gable).
8. The roof now needs attaching to the trusses (if there are trusses).
To do this, screw down through the roof panels and into the truss from the outside with 35mm screws
ensuring there are 8 screws per truss (4x on each side).
Page 14

Felt
Health and Safety –Use safety goggles when installing the roofing felt.
1. Roll out the mineral roofing felt along the lower part of one side of the roof.
Allow for sufficient overhang to fold down onto the roof framing (but not the underside of the roof).
Health and Safety –Use Step Ladders to put on the roof felt but do not climb on top of the roof.
Ensure there is a second person to support you when using a ladder.
2. Use clout nails to tack along the top edge of the felt and into the roof boards.
Repeat this process on the other side of the roof.
Take care not to tack into the tongue and groove join between each board as this can
cause leaks.
3. If you have ordered a Power shed which is 6ft wide (4x6, 6x6, 7x5, 8x6, 10x6, 12x6, 14x6, 16x6, 18x6,
20x6) then you will receive an additional piece of felt to then go on the ridge of the roof.
This can be secured to the roof using clout nails.
4. Fold the overhanging felt at the gable ends under the roof boards and tack into place.
Note - The 4x4, 4x6, 6x4, 6x6 and 7x5 Power Apex roof panels will finish flush with the gables and
so the felt will not tuck under.
Page 15

Finishing Touches
1. Using the 40mm galvanised nails, fit the bargeboards, which are 70mm wide, to the roof panels and
secure the diamond finials over the top of the bargeboards.
2. Secure cover lats (which are 58mm wide) at each corner of your Power shed with 40mm nails.
Use at least four per strip.
Extra strips are provided to cover any joins between side wall panels.
3. Secure the door pull to the door with 25mm screws.
4. Peel the protective blue sticker off the Power branding plate above the door.
5. Ensure there are no overhanging branches or debris on the shed as this can lead to water ingress.
Please be aware, this will need to be checked regularly as part of the maintenance of the shed.
Page 16

Aftercare & Maintenance
Seal Your Windows
We recommend windows are sealed externally with the application of silicone, putty or any other ‘watertight’
solution at your own preference.
Important!
Please ensure you thoroughly seal the exterior bottom corners of the windows at the edge of the sill. If you
have a Summerhouse, remember to seal around the door glass as well!
Shed Preserver
All our sheds come with our Power preservative.
It is important that you re-treat your Power shed annually with a high-quality wood preserver.
Feel free to change the colour of the building giving you the ‘power’ to style it your own way.
Take extra care to brush treatment into all wooden components inside and outside.
Please ensure there are no overhanging branches or debris on the shed as this can lead to water ingress.
USEFUL TIP –Looking for some inspiration?
Our Instagram has images of hundreds of Power Sheds which have all been sent to us by customers and is a great
way to look at the different ways you can build and paint your shed!
Check Your Base
Although your base should be level at the time of assembly, some bases can move over time and if you find this
occurs then the building can twist or door may not close properly.
If such occurrences you may need to pack up the base to keep the building level.
Share Your Shed
Here at Power we love to see your sheds!
Send us photos of your finished sheds to our social media channels using the following handles –
@PowerSheds #PowerSheds
Instagram Twitter Facebook
Page 17

Power Shed Shelving Instructions
Power Shed Shelving comes 4ft or 6ft long.
You will receive the following components in each shelving pack:
•(4x) board lengths (at either 4ft or 6ft depending what you ordered).
Please note: These are 70mm wide and are the same material as the bargeboards.
Be careful not to use these during assembly of your Power Shed –These boards are usually taped together.
•(3x) Brackets
•(2x) Batons
•(1x) Fixing pack - containing 70mm screws and 25mm screws.
Please note:
•When screwing the brackets into position, ensure they are fixed to the internal framing of the shed and not
the cladding
•You may have to cut the board lengths down with a saw to fit depending on the shed you have
1. Choose an appropriate location for your shelving and screw the brackets to the internal framing of the shed
with the 70mm screws.
2. Use a spirit level to ensure they are level.
Ensure the shelving bracket is the correct way up as per the diagram following:
Depending on your shed, there may not be an appropriate place to secure your brackets or there may be
framing in an unsuitable position (particularly if the shelf is going on a gable end). We have therefore sent
some additional batons to use if required.
3. After the brackets are attached to the framing of the side walls, you can fix the shelving board lengths into
the brackets which the 25mm screws. There should be two screws per board per bracket. There should be a
small gap between each board length
Page 18

Power Two-Tiered Staging Unit Installation Instructions
Power Shed Staging Units come at either 2ft or 4ft long.
You will receive the following components in each individual staging pack:
•(2x) Shelving Panels (either 2ft or 4ft)
•(2x) Legs (for the front of the panels only)
Please note:
•Depending on where you decide to install the staging units –you may need to cut the panels down. Before
attaching the panels to the framing ensure they are correctly sized.
•Use 70mm screws from the fixing pack to attach the shelving panels to the framing.
•When screwing the shelving into position, ensure they are fixed to the internal framing of the shed and not
the cladding
1. The staging units are designed to fit our Power Potting Shed window panels (however can be attached
to any shed in our range), being fixed against the internal framing of the shed with the 70mm screws.
2. Use a spirit level to ensure they are level. We would recommend to pre-drill the holes for the screws
to ensure the timber does not split.
3. Fix the legs to the shelves, once again using the 70mm screws.
After these are added continue adding each additional staging unit (if necessary) securing batons as
you go.
Returns
Page 19

Returns
If Power is not for you and you’d like to return your shed within 14 days of delivery, then we will collect the item
from you without charging a collection fee. No fuss, no fees!
All we ask is that you do not unpack the shed or take the shed off the pallet. You will be able to see the shed
panels on the pallet if you want to double check the quality of the shed panels.
You need to notify the company you ordered your garden building from to arrange a cancellation or return.
If you have unpacked the shed or taken the shed off the pallet, then you can still return the product to us
providing it is within 14 days of delivery, but you will have to cover the cost of returning the item. This will
either need to be arranging the delivery yourself (to our manufacturing unit in West Yorkshire) or repacking and
securing the goods back onto the pallet and we can arrange a pallet collection for you. The cost of this will depend
on your location and the item bought –please contact us if you would like us to advise the cost of this. In this case
we will not profit from any courier charges but simply pass on the cost we receive to you.
Any delivery surcharges you have paid (such as a quicker delivery, Saturday delivery, or a timed delivery) will not
be refunded.
Once your item has been returned it will be checked to ensure it is complete and in a re-sellable condition. If we
deem that the product is not in a re-sellable condition, we shall deduct a reasonable amount to cover any costs to
use or return them to you.
Where a refund is to be paid, we will usually refund any money received from you using the same method
originally used by you to pay for your purchase.
Contact Us
If you have any queries or issues with your shed then you can:
•Check out our FAQ page on www.PowerSheds.com
•Email us at hello@PowerSheds.com
Please provide photographs of any reported issues*
Any replacement parts can take 1-3 working days.
•Contact us via the telephone –01274 036 577 (Mon-Fri 08:00 - 16:30)
•Write to us at:
Power Sheds Ltd
21 Commondale Way
Euroway Trading Estate
Bradford
BD4 6SF
On the rare occasion that something is missing or damaged, please contact us to make us
aware so we can send out any replacements. Replacement parts will be dispatched within 1-3
working days.
Please be aware we are unable to reimburse you if you purchase your own materials.
We also cannot compensate for subsequential losses such as installation work.
Other manuals for Apex
2
Table of contents
Other Power Garden House manuals
Popular Garden House manuals by other brands

Palmako
Palmako PAY44-4242 installation manual

Forest
Forest TPCSUM88 quick start guide

Palmako
Palmako EL18-5733 installation manual

Mercia Garden Products
Mercia Garden Products 03HEL1010DDFW-V2 General instructions

Heartland
Heartland ADD ONE 12 x 4 Assembly manual

Palmako
Palmako FRG44-4132 instruction manual

Tiger
Tiger Bengal General assembly instructions

Mercia Garden Products
Mercia Garden Products 01RAW1010DDOW-V1 General instructions

Mercia Garden Products
Mercia Garden Products 02DTTWR0605-V1-PEFC General instructions

Palmako
Palmako FR28-7032 installation manual

Palmako
Palmako B44-3535 installation manual

Luoman
Luoman 724 Building instructions