Premier Mounts PP-FCTA User manual

INSTALLATION INSTRUCTIONS
EUROPE
Swallow House,
Shilton Industrial Estate,
Shilton, Coventry, England CV79JY
Phone: +44 (0) 2476 614700
Fax: +44 (0) 2476 614710
NORTH AMERICA
3130 East Miraloma Avenue
Anaheim, CA 92806 USA
USA and Canada
Phone: 1.800.368.9700
Fax: 1.800.832.4888
Other Locations
Phone: (001).714.632.7100
Fax: (001).714.632.1044
9530-302-001-08
PP-FCTA
Suspended Ceiling Adapter

Page 2 Visit the Premier Mounts website at http://www.mounts.com Installation Instructions
Contact Premier Mounts with any questions:
(800) 368-9700
Contents
PP-FCTA
Warning Statements
Weight Limit
Maximum Projector Weight: 50 lbs.
THE CEILING STRUCTURE MUST BE CAPABLE OF
SUPPORTING AT LEAST FIVE TIMES THE WEIGHT OF
THE PROJECTOR. IF NOT, THE CEILING STRUCTURE
MUST BE REINFORCED.
PRIOR TO THE INSTALLATION OF THIS PRODUCT, THE INSTALLATION INSTRUCTIONS MUST BE READ AND
COMPLETELY UNDERSTOOD. KEEP THESE INSTALLATION INSTRUCTIONS IN AN EASILY ACCESSIBLE LOCATION
FOR FUTURE REFERENCE.
PROPER INSTALLATION PROCEDURE BY A QUALIFIED SERVICE TECHNICIAN MUST BE FOLLOWED, AS OUTLINED
IN THESE INSTALLATION INSTRUCTIONS. FAILURE TO DO SO COULD RESULT IN PROPERTY DAMAGE, SERIOUS
PERSONAL INJURY, OR EVEN DEATH.
SAFETY MEASURES MUST BE PRACTICED AT ALL TIMES DURING THE ASSEMBLY OF THIS PRODUCT. USE
PROPER SAFETY EQUIPMENT AND TOOLS FOR THE ASSEMBLY PROCEDURE TO PREVENT PERSONAL INJURY.
PREMIER MOUNTS DOES NOT WARRANT AGAINST DAMAGE CAUSED BY THE USE OF ANY PREMIER MOUNTS
PRODUCT FOR PURPOSES OTHER THAN THOSE FOR WHICH IT WAS DESIGNED OR DAMAGE CAUSED BY
UNAUTHORIZED ATTACHMENTS OR MODIFICATIONS, AND IS NOT RESPONSIBLE FOR ANY DAMAGES, CLAIMS,
DEMANDS, SUITS, ACTIONS OR CAUSES OF ACTION OF WHATEVER KIND RESULTING FROM, ARISING OUT OF OR
IN ANY MANNER RELATING TO ANY SUCH USE, ATTACHMENTS OR MODIFICATIONS.
At least two qualied people should perform the assembly procedure. Personal injury and/or property damage can result
from dropping or mishandling the projector.
This product is intended for indoor use only. Use of this product outdoors could lead to product failure and/or serious
personal injury.
Do not install near sources of high heat. Do not install on a structure that is prone to vibration, movement or chance of
impact.
Weight Limit. .................................................................................................................................................................... 2
Warning Statements. ....................................................................................................................................................... 2
Installation Tools. ............................................................................................................................................................. 3
Parts List.......................................................................................................................................................................... 3
Features. ......................................................................................................................................................................... 4
PP-FCTA Installation. ...................................................................................................................................................... 5
Camera Screw Installation (optional). ....................................................................................................................... 6
Mounting the PP-FCTA. ............................................................................................................................................ 7
Securing the Ceiling Plate. ........................................................................................................................................ 8
Electrical Box Cut-out Removal. ............................................................................................................................... 8
Ceiling Attachment. ................................................................................................................................................... 9
Securing the 1 ½˝ NPT Pipe to the PP-FCTA. ........................................................................................................ 10
Securing the Camera (optional). ..............................................................................................................................11
Technical Specications. ................................................................................................................................................11
Disclaimer. ..................................................................................................................................................................... 12

Installation Instructions Visit the Premier Mounts website at http://www.mounts.com Page 3
PP-FCTA
Parts List
Installation Tools
The following tools may be required depending upon your particular installation. They are not included.
Make sure your Premier Mounts product has the following hardware and components before beginning installation. If
there are parts missing and/or damaged, stop the installation and call Premier Mounts at (800) 368-9700.
Main Ceiling Plate
(Qty 1)
PP-FCTA Mount Hardware
Pencil Protective Eyewear Phillips Tip ScrewdriverHand Held Drill
Ladder
14-Gauge x 25’ Galvanized Wire
(Qty 4 Strands)
¼˝ x 3˝ Eye Lag Screws
(Qty 4)
M6 x 2.4” Concrete Anchors
(Qty 4)
¼”-20 Wing Nuts
(Qty 5)
Lower Adapter Plate
(Qty 1)
Upper Adapter Plate
(Qty 1)
¼”-20 Turnbuckles
(Qty 4)
Hole SawHammer1/4” Concrete Drill Bit1/8˝ Drill Bit
¼”-20 x 2 ¾” Pan
Phillip Head Screw
(Qty 1)
Escutcheon Ring
(Qty 1)
M5 x 16mm Combo Screws
(Qty 5)

Page 4 Visit the Premier Mounts website at http://www.mounts.com Installation Instructions
PP-FCTA
Features
Adjustability
Up to 9˝ of lateral shift
Mounting Coupler
Use a set screw to hold any
1 ½” NPT pipe to the mounting
coupler
Electrical Access
Knockouts for electrical or signal
junction boxes
The suspended ceiling adapter makes it easy to install and fine-tune the position of your overhead
projector and organize its electrical wiring above the ceiling.
Camera Screw Hole
Use a 1/4”-20 screw to mount a
camera alongside the projector

Installation Instructions Visit the Premier Mounts website at http://www.mounts.com Page 5
PP-FCTA
Read these instructions before installing your Premier Mounts product.
Make sure you have all the parts and tools you need to safely complete the installation.
Some of the steps in this installation may require two people to prevent personal injury and/or damage to the projector.
Read all the warnings in the manual and always use proper safety equipment.
PP-FCTA Installation
Introduction
Ceiling Plate Assembly
Place the lower adapter plate with the threaded studs
facing up through the adjustable slide slots of the
main ceiling plate.
The threaded studs will align with the adjustable
slide on the main ceiling plate.
® Once the two pieces are together, align the mounting
holes on the upper adapter plate with the threaded
studs of the lower adapter plate.
¯ Place the three units together and loosely attach four
(4) ¼”-20 wing nuts onto the threaded studs (see
inset below).
Threaded Studs
Lower Adapter Plate
Adjustable Slide Slots
Main Ceiling Plate
¼”-20 Wing nuts
Upper Adapter Plate
Are you adding a camera to the ceiling adapter?
If Yes, proceed to the “Camera Screw Installation
(optional)” section on page 6.
If No, proceed to the “Mounting the PP-FCTA”
section on page 7.

Page 6 Visit the Premier Mounts website at http://www.mounts.com Installation Instructions
PP-FCTA
Make sure the camera supports one (1) 1/4”-20
screw.
Determine which screw hole on the upper adapter
plate you will use to attach the camera.
® Insert one (1) 1/4”-20 x 2 3/4” pan Phillips head screw
through one (1) wing nut and the desired screw hole.
The screw should go through both the upper and
lower adapter plates. It will later be used to mount
the camera (see page 11).
Camera Screw Installation (optional)
Do not overtighten the mounting screw.
Proceed to the ″Mounting the PP-FCTA″ section.
1/4”-20 x 2 3/4” pan
Phillips head screw
Wing nut
1/4”-20 threaded insert on
camera (see page 11)
1/4”-20 optional holes

Installation Instructions Visit the Premier Mounts website at http://www.mounts.com Page 7
PP-FCTA
Pre-set four (4) M5 x 16mm combo screws on the
ceiling plate assembly (two on each end of the plate).
The M5 x 16 mm screws may be attached on the
inner or outer lip of the main ceiling plate.
® Determine the ceiling tile you will use to attach the
ceiling adapter.
¯ Use a pencil to measure and mark 3˝ from each
edge of the t-bar frames to the inside of the tile (see
diagram).
° Determine the mounting hole position inside the
marked square of the tile and mark it with a pencil.
If you are attaching a camera, mark an additional
hole for the 1/4”-20 screw next to the mounting
coupler.
± Remove any of the 24˝ x 24˝ or 24˝ x 48˝ tiles that are
surrounding the marked tile.
² Cut the mounting hole (and camera screw hole).
³ Place the ceiling plate on the t-bar rails so that the
mounting coupler can slide to align with the ceiling
mounting hole.
Mounting the PP-FCTA
Proceed to the ″Securing the Ceiling Plate″ section on
page 8.
M5 x 16mm Screws
Upper Adapter Plate
Ceiling Plate Assembly
Mounting Hole
T-Bar Frame
Ceiling Tile
3˝
3˝
3˝
3˝
1/4”-20 optional holes

Page 8 Visit the Premier Mounts website at http://www.mounts.com Installation Instructions
PP-FCTA
Once the ceiling plate assembly is resting on the t-bar
frame rails, use a screwdriver to tighten the four (4)
M5 x 16mm combo screws.
® Slide and center the upper plate assembly over the
hole that was cut in the tile.
¯ Tighten all four (4) wing nuts.
Cut the tile where the electrical box is going to be
secured.
® Using (commercially available) hardware depending
on electrical installation environment, install the
electrical box and secure it to the ceiling plate
assembly.
¯ Make all electrical connections at this time.
Securing the Ceiling Plate
Do not overtighten the mounting screws.
M5 x 16mm Combo Screw
Tiles
T-Bar Frame Rails
Electrical Box Cut-out Removal
Electrical installation should be completed by a certied
electrician.
Proceed to the ″Electrical Box Cut-out Removal″ section
below.
Upper Adapter Plate
Upper Plate Assembly
Electrical Box
Cut-out
Electrical Box
(Commercially
Available)
Proceed to the ″Attaching the Turnbuckles″ section.
PP-FCTA

Installation Instructions Visit the Premier Mounts website at http://www.mounts.com Page 9
PP-FCTA PP-FCTA
Ceiling Attachment
Solid Surface
Wood Stud
Determine a suitable structure capable of supporting
the intended weight to drill the mounting holes.
Set the holes so that wires from the main ceiling
plate will angle 15 degrees outward (see Fig. 1).
® Use a 1/8˝ drill bit to drill the mounting holes.
® Secure the four (4) ¼˝ eye lag screws to the wood
stud in the ceiling.
° Loop a wire through an eye lag screw (see Figure 2).
± Twist the wire at least ve (5) times around itself to
secure it.
² Run the other end of the wire through the turnbuckle.
³ Twist the wire at least ve (5) times around itself to
secure it.
´ Repeat steps 4-7 for the remaining three mounting
points.
The nal loop on the wire has to be tightly bent
and secured to prevent it from untwisting. Twist
the turnbuckles to ne-tune adjust.
Recheck all hardware and installation for proper
tightness and security.
Determine a suitable structure capable of supporting
the intended weight to drill the mounting holes.
Set the holes so that wires from the main ceiling
plate will angle 15 degrees outward (see Fig. 1).
® Use a ¼˝ concrete drill bit to drill the mounting holes.
¯ Place the concrete anchors into the drilled hole and
gently tap into place using a rubber mallet or hammer.
° Loop a wire through a concrete anchor bolt (see
Figure 2).
± Twist the wire at least ve (5) times around itself to
secure it.
² Run the other end of the wire through the turnbuckle.
³ Twist the wire at least ve (5) times around itself to
secure it.
´ Repeat steps 4-7 for the remaining three mounting
points.
The nal loop on the wire has to be tightly bent
and secured to prevent it from untwisting. Twist
the turnbuckles to ne-tune adjust.
Recheck all hardware and installation for proper
tightness and security.
Wood Stud Ceiling
Concrete Ceiling
Eye Lag Screw
Concrete Anchor
Proceed to the ″Securing the 1 ½˝ NPT to the
PP-FCTA″ on page 11.
Proceed to the ″Securing the 1 ½˝ NPT to the
PP-FCTA″ on page 11.
Hook the four (4) turnbuckles into the four corners of the main
ceiling plate. Then choose one of the three ceiling attachment
15°
Figure 1
Figure 2
15°
Figure 1
Figure 2

Page 10 Visit the Premier Mounts website at http://www.mounts.com Installation Instructions
1-½˝ Pipe
M5 x 16mm Screw
PP-FCTA
Loop the wire around the truss (see Figure 1).
Hang the wires from the trusses so that they will
angle 15 degrees outward from the main ceiling
plate (see Fig. 2).
® Twist the wire at least ve (5) times around itself to
secure it.
¯ Run the other end of the wire through the turnbuckle.
° Twist the wire at least ve (5) times around itself to
secure it.
± Repeat steps 1-4 for the remaining three mounting
points.
The nal loop on the wire has to be tightly bent
and secured to prevent it from untwisting. Twist
the turnbuckles to ne-tune adjust.
Recheck all hardware and installation for proper
tightness and security.
Truss Ceiling
Securing the 1 ½˝ NPT Pipe to the PP-FCTA
Secure the 1 ½″ NPT pipe to the mounting coupler
and tighten the pipe.
® Secure the pipe using one (1) M5 x 16mm combo
screw to the plate.
The M5 x 16mm combo screw must be used to
stabilize the 1 ½″ NPT pipe.
¯ Attach the escutcheon ring to the 1 ½″ NPT pipe
beneath the ceiling tile.
Proceed to the ″Securing the 1 ½˝ NPT Pipe to the PP-FCTA″
section below.
Ceiling Attachment (cont’d)
Are you adding a camera to the ceiling adapter?
If Yes, proceed to the “Securing the Camera
(optional)” section on page 11.
If No, you have completed the ceiling adapter
installation.
15°
Figure 2
Ceiling Truss
Figure 1

Installation Instructions Visit the Premier Mounts website at http://www.mounts.com Page 11
PP-FCTA
Technical Specications
All measurements are in inches.
.81
24.75
1.18
8.43
3.25
8.43
6.50 .75
1.00
(1.00)
23.36
1.18 1.18
4.02
24.75
14.87
11.37
4.5
4.21
PP-FCTA
Securing the Camera (optional)
Attach the camera to the bottom of the 1/4”-20 pan
Phillips head screw.
The screw should be extending down through the
ceiling tile next to the mounting hole.
® Use the screw’s wing nut to tighten the camera
against the tile.
Figure 2
Figure 1

Page 12 Visit the Premier Mounts website at http://www.mounts.com Installation Instructions
PREMIER MOUNTS
LIMITED LIFETIME WARRANTY
What and Who is Covered by this Limited Warranty and for How Long
Premier Mounts warrants this product to be free from defects in material and workmanship for the lifetime of the
original owner of this product. The limited warranty is valid only for the original purchaser of the product.
What Premier Mounts Will Do
At the sole option of Premier Mounts, Premier Mounts will repair or replace any product or product part that is
defective. If Premier Mounts chooses to replace a defective product or part, a replacement product or part will be
shipped to you at no charge, but you must pay any labor costs.
What is Not Covered; Limitations
PREMIER MOUNTS DISCLAIMS ANY LIABILITY FOR DAMAGE TO MOUNTS, ADAPTERS, DISPLAYS,
PROJECTORS, OTHER PROPERTY, OR PERSONAL INJURY RESULTING, IN WHOLE OR IN PART, FROM
IMPROPER INSTALLATION, MODIFICATION, USE OR MISUSE OF ITS PRODUCTS.
PREMIER MOUNTS DISCLAIMS ALL OTHER WARRANTIES, EXPRESS OR IMPLIED, INCLUDING WARRANTIES
OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. PREMIER MOUNTS IS NOT
RESPONSIBLE FOR INCIDENTAL OR CONSEQUENTIAL DAMAGES, INCLUDING BUT NOT LIMITED TO,
INABILITY TO USE ITS PRODUCTS OR LABOR COSTS FOR REMOVING AND REPLACING DEFECTIVE
PRODUCTS OR PARTS. SOME STATES DO NOT ALLOW THE EXCLUSION OR LIMITATION OF INCIDENTAL OR
CONSEQUENTIAL DAMAGES, SO THE ABOVE LIMITATION OR EXCLUSION MAY NOT APPLY TO YOU.
What Customers Must Do for Limited Warranty Service
If you discover a problem that you think may be covered by the warranty you MUST REPORT it in writing to the
address below within thirty (30) days. Proof of purchase (an original sales receipt) from the original consumer
purchaser must accompany all warranty claims. Warranty claims must also include a description of the problem, the
purchaser’s name, address, and telephone number. General inquiries can be addressed to Premier Mounts Customer
Service at
(800) 368-9700. Warranty claims will not be accepted over the phone or by fax.
Premier Mounts
Attn: Warranty Claim
3130 East Miraloma Ave.
Anaheim, CA 92806
How State Law Applies
THIS WARRANTY GIVES YOU SPECIFIC LEGAL RIGHTS, AND YOU MAY ALSO HAVE OTHER RIGHTS WHICH
VARY FROM STATE TO STATE.
©Premier Mounts 2010
Warranty
PP-FCTA
Disclaimer
Premier Mounts intends to make this manual accurate and complete. However, Premier Mounts makes no claim that
the information contained herein covers all details, conditions or variations, nor does it provide for every possible
contingency in connection with the installation or use of this product. The information contained in this document
is subject to change without notice or obligation of any kind. Premier Mounts makes no representation of warranty,
expressed or implied, regarding the information contained herein. Premier Mounts assumes no responsibility for
accuracy, completeness or sufciency of the information contained in this document.

INSTALLATION INSTRUCTIONS
NORTH AMERICA
3130 East Miraloma Avenue
Anaheim, CA 92806 USA
USA and Canada
Phone: 1.800.368.9700
Fax: 1.800.832.4888
Other Locations
Phone: (001).714.632.7100
Fax: (001).714.632.1044
EUROPE
Swallow House,
Shilton Industrial Estate,
Shilton, Coventry, England CV79JY
Phone: +44 (0) 2476 614700
Fax: +44 (0) 2476 614710
SPI-PRO
SpiroLock™ Universal Projector Mount For 1½” NPT
9530-005-073-04

Page 2 Visit the Premier Mounts website at http://www.mounts.com Installation Instructions
SPI-PRO
Contact Premier Mounts with any questions:
1-800-368-9700
Contents
Warning Statements
Weight Limit. .................................................................................................................................................................... 2
Warning Statements. ....................................................................................................................................................... 2
Installation Tools. ............................................................................................................................................................. 3
Parts List.......................................................................................................................................................................... 3
Features. ......................................................................................................................................................................... 4
Installing the SpiroLock™. ............................................................................................................................................... 5
Wood Stud Installation. ............................................................................................................................................. 6
Solid Ceiling Installation. ........................................................................................................................................... 8
Attaching to a 1-1/2” NPT Pipe. .............................................................................................................................. 10
Attaching the Projector Plate. .........................................................................................................................................11
Selecting the Mounting Hardware. ...........................................................................................................................11
Multiple Mounting Point Installation. ........................................................................................................................11
Single Mounting Point Installation. .......................................................................................................................... 14
Attaching the Projector to the Mount. ............................................................................................................................ 14
Alignment & Fine-Tuning. .............................................................................................................................................. 15
Removing the Projector. ................................................................................................................................................ 16
Installing the Lock-It™ Security Barrel. ......................................................................................................................... 17
Technical Specications. ............................................................................................................................................... 17
Warranty. ....................................................................................................................................................................... 18
Disclaimer. ..................................................................................................................................................................... 18
Weight Limit
Maximum Projector Weight: 45 lbs.
THE CEILING STRUCTURE MUST BE CAPABLE OF
SUPPORTING AT LEAST FIVE TIMES THE WEIGHT OF
THE PROJECTOR. IF NOT, THE CEILING STRUCTURE
MUST BE REINFORCED.
PRIOR TO THE INSTALLATION OF THIS PRODUCT, THE INSTALLATION INSTRUCTIONS MUST BE READ AND
COMPLETELY UNDERSTOOD. KEEP THESE INSTALLATION INSTRUCTIONS IN AN EASILY ACCESSIBLE LOCATION
FOR FUTURE REFERENCE.
PROPER INSTALLATION PROCEDURE BY A QUALIFIED SERVICE TECHNICIAN MUST BE FOLLOWED, AS OUTLINED
IN THESE INSTALLATION INSTRUCTIONS. FAILURE TO DO SO COULD RESULT IN PROPERTY DAMAGE, SERIOUS
PERSONAL INJURY, OR EVEN DEATH.
SAFETY MEASURES MUST BE PRACTICED AT ALL TIMES DURING THE ASSEMBLY OF THIS PRODUCT. USE
PROPER SAFETY EQUIPMENT AND TOOLS FOR THE ASSEMBLY PROCEDURE TO PREVENT PERSONAL INJURY.
PREMIER MOUNTS DOES NOT WARRANT AGAINST DAMAGE CAUSED BY THE USE OF ANY PREMIER MOUNTS
PRODUCT FOR PURPOSES OTHER THAN THOSE FOR WHICH IT WAS DESIGNED OR DAMAGE CAUSED BY
UNAUTHORIZED ATTACHMENTS OR MODIFICATIONS, AND IS NOT RESPONSIBLE FOR ANY DAMAGES, CLAIMS,
DEMANDS, SUITS, ACTIONS OR CAUSES OF ACTION OF WHATEVER KIND RESULTING FROM, ARISING OUT OF OR
IN ANY MANNER RELATING TO ANY SUCH USE, ATTACHMENTS OR MODIFICATIONS.
At least two qualied people should perform the assembly procedure. Personal injury and/or property damage can result
from dropping or mishandling the projector.
If mounting to wall studs or ceiling studs, make sure that the mounting screws are anchored into the center of the wall studs
or ceiling studs. Use of an edge-to-edge stud nder is recommended.
Be aware of the mounting environment. If drilling and/or cutting into the mounting surface, always make sure that there
are no electrical wires in wall. Cutting or drilling into an electrical line may cause serious personal injury.
Make sure there are no water or natural gas lines inside the wall where the mount is to be located. Cutting or drilling into a
water or gas line may cause severe property damage or personal injury.
This product is intended for indoor use only. Use of this product outdoors could lead to product failure and/or serious
personal injury.
Do not install near sources of high heat. Do not install on a structure that is prone to vibration, movement or chance of
impact.

SPI-PRO
Installation Instructions Visit the Premier Mounts website at http://www.mounts.com Page 3
Parts List
Installation Tools
The following tools may be required depending upon your particular installation. They are not included.
Make sure your Premier Mounts product has the following hardware and components before beginning installation. If
there are parts missing and/or damaged, stop the installation and call Premier Mounts at (800) 368-9700.
SpiroLock™ Projector Plate
(Qty 1)
SpiroLock™ For 1½” NPT Hardware
SpiroLock™ Ceiling Plate
(Qty 1)
Mounting Legs
(Qty 4)
#14 x 2˝ Wood Screws
(Qty 2)
M5 Security Allen
Wrench (Qty 1)
M3 x 16mm Security Screw
(Qty 4)
Protective EyewearElectronic Stud Finder Hand Held DrillPencil ⅛˝ Drill Bit (Wood)
Hammer
5/16˝ Masonry Drill BitPhillips Head Screwdriver Ladder
M2.5 x 10mm Security Screw
(Qty 4)
M2.5 x 12mm Security Screw
(Qty 4)
M4 x 10mm Security
Screw (Qty 4)
M4 x 12mm Security Screw
(Qty 4)
M5 x 12mm
Security Screw
(Qty 4)
M3 Flat Washer
(Qty 10)
M6 x 12mm Security Screw
(Qty 8)
¼-20 x 5/16˝ Security Screw
(Qty 1)
Lock-It™ Security
Barrel (Qty 1)
M3 Security Allen
Wrench (Qty 1)
Close Nipple
(Qty 1)
SpiroLock™ Twist Lock Collar
(Qty 1)

SPI-PRO
Page 4 Visit the Premier Mounts website at http://www.mounts.com Installation Instructions
Features
Lock-It™ Security Hardware
Protect your projector from
theft by installing specialized
hardware at critical mounting
points.
Locking Tab and Lock-It™ Screw
Assures that the projector plate
releases only when you want it
released.
Tool-Free Adjustment
Precise yaw, pitch and roll
adjustments without requiring
specialized tools.
Mounting Slots
Allows you to choose from a
variety of mounting options
and projector mounting point
congurations.
Adjustable Leveling Barrels
You can quickly level the mounting legs
without any specialized tools.
Mounting Legs
Combined with the numerous
projector plate mounting slots, the
mounting legs allow for multiple
mount congurations.
Ceiling Plate
Can easily be installed on either a
wood stud or solid ceiling.
Radial Glide® Technology
Up to 6º of smooth
adjustment in any direction.
SpiroLock™ Installation
Torsion spring mechanism
automatically twists and
captures the SpiroLock™
projector plate.
The SpiroLock™ Universal Projector Mount is easy to install. Snap and lock the projector onto
the mount, then rotate and pivot freely for the optimal viewing angle. The Lock-It™ security
screws and leveling barrel add an extra layer of security and theft deterrence.
1-1/2” NPT Coupler
Can attach the mount to a 1-1/2”
standard threaded pipe or one of
Premier Mounts adjustable-height
ceiling adapters.

SPI-PRO
Installation Instructions Visit the Premier Mounts website at http://www.mounts.com Page 5
You may secure the SpiroLock™ mount to a single ceiling stud; a solid surface ceiling, such as concrete; a 1-1/2” NPT
pipe; or a Premier Mounts ceiling adapter.
See the Premier Mounts Website at www.mounts.com for compatible ceiling adapters.
Read these installation instructions thoroughly before attempting to install the Premier Mounts product.
Familiarize yourself with the contents of the package and make sure you have all the parts and tools you need to
safely complete the installation.
Installing the SpiroLock™
How are you installing the SpiroLock™?
If you are using a wood stud, proceed to “Wood
Stud Installation” on page 6.
If you are using a solid surface, such as a concrete
ceiling, proceed to “Solid Ceiling Installation” on
page 8.
If you are using a 1-1/2” NPT pipe or Premier
Mounts ceiling adapter, proceed to “Attaching to a
1-1/2” NPT Pipe” on page 10.
Introduction
Step 1

SPI-PRO
Page 6 Visit the Premier Mounts website at http://www.mounts.com Installation Instructions
Step 1
Step 2
Use an electronic stud nder to locate a ceiling stud
closest to your desired installation location.
® Identify the center of the ceiling stud.
¯ Use a pencil to mark the location of the ceiling stud
center.
The target arrow indicates the direction of the
projector screen relative to the projector mount.
Stud
Center
Remove the SpiroLock™ Ceiling Plate and set it
aside.
® Drill a pilot hole in the center of each mark using a
hand held drill and a 1/8˝ drill bit.
Place the SpiroLock™ Ceiling Plate against the
ceiling. Its mounting holes should align with the center
of the ceiling stud.
® Use a pencil and mark two (2) mounting hole
locations through each of the mounting points (A) in
the SpiroLock™ Ceiling Plate.
Step 3
Pilot Holes
When a screw is driven into a material, such
as wood, it can act as a wedge, generating
outward pressure which can cause many
materials to split. Drilling a small pilot hole
where the screw will be driven causes less
‘wedging’ to take place, thereby reducing the
likelihood of the material being split. It also
reduces the possibility of the screw head
getting sheared off by torque.
AA
Wood Stud Installation

SPI-PRO
Installation Instructions Visit the Premier Mounts website at http://www.mounts.com Page 7
Wood Stud Installation (cont’d)
Step 4
Insert one (1) #14 x 2˝ screw through each of the
mounting holes (A) on the bottom of the SpiroLock™
Ceiling Plate and into the pilot holes.
® Tighten each screw until the SpiroLock™ Ceiling
Plate is secure against the ceiling.
Do not overtighten the #14 x 2˝ screws.
If applicable, drill a hole above the mounting hole for
wiring access. A
A
Step 5
Secure the SpiroLock™ and close nipple onto the
Ceiling Plate.
® Use an M3 Allen wrench to tighten the M6 x 6mm
Lock-It™ screws in the Ceiling Plate and SpiroLock™
twist lock collar.
Do not overtighten the Lock-It™ screws.
¯ Route any cables up through the SpiroLock™ and
into the ceiling structure.
Proceed to “Attaching the Projector Plate” on
page 11.
M6 x 6mm Lock-It™
Screws

SPI-PRO
Page 8 Visit the Premier Mounts website at http://www.mounts.com Installation Instructions
Step 1
Step 2
Place the SpiroLock™ Ceiling Plate into position
against the ceiling.
® Use a pencil and mark four (4) mounting hole
locations through each of the mounting points (B) in
the SpiroLock™ Ceiling Plate.
The target arrow indicates the direction of the
projector screen relative to the projector mount.
Drill a hole at each mark using the appropriate
diameter masonry bit for your wedge anchor.
® Remove the nut and washer from the wedge anchors.
¯ Insert a wedge anchor into each hole.
If necessary, use a hammer to lightly tap each
wedge anchor into place.
Solid Ceiling Installation
BB
B
B
Introduction
You can mount the SpiroLock™ projector mount to any solid surface ceiling which has a minimum 6˝ thickness.
For concrete installation use concrete wedge anchors (¼˝ recommended) to secure the mounting hardware and
a masonry drill bit to drill the pilot holes. Wedge anchors and masonry drill bits are not supplied, but you can
purchase them at your local hardware store.
Example Wedge Anchors and Masonry Bit
Not included
Other manuals for PP-FCTA
2
Table of contents
Other Premier Mounts Adapter manuals

Premier Mounts
Premier Mounts PP-FCMA-QL User manual

Premier Mounts
Premier Mounts PP-FCTA User manual

Premier Mounts
Premier Mounts UFP-280 User manual

Premier Mounts
Premier Mounts Rotary RTM-CL User manual

Premier Mounts
Premier Mounts PSD-S User manual

Premier Mounts
Premier Mounts APP-2446 User manual

Premier Mounts
Premier Mounts APL-2647 User manual

Premier Mounts
Premier Mounts 7170-1009 User manual