Step 1 - Prepare and install posts and decking. Prepare the posts and mounting surfaces to which the rail section will be attached. A
typical installation uses a 4" x 4" vinyl post sleeved over either a 4" x 4" treated wood post, or an LMT Blu-Mount with aluminum or
PVC guides. When using PRESIDIO
®
PVC Decking, the 4" x 4" treated wood post should extend 38-1/2" above the wood joist framed
structure for 36" high railing systems, and 44-1/2" above the wood joist framed structure for 42" high railing systems. Cut and fasten
the posts to the wood framing or if you are installing your PRESIDIO
®
guardrail system on a concrete surface, install LMT Blu Mounts
following the supplied Blu Mount installation instructions. Install decking boards over or around post supports. (Please refer to the
decking installation instruction manual for the correct installation procedures of the deck boards.) Sleeve the post supports with a 4"
vinyl post. (This sleeve should measure 38" above the finished deck surface for 36" railing heights or 44" for 42" railing heights.) The
installed post sleeves must be plumb for correct installation of the rail section. If vinyl post skirts are being used at the base of the
posts, slide the post skirts into position so that they come to rest around the base of the 4" x 4" sleeved post.
Step 3 - Measure and cut the bottom rail. The bottom rail is identified by having routed holes on each side of the rail. One side for
the insertion of the balusters and the other for the foot block. Measure the distance between the base plates of opposing nylon post
brackets. If cutting of the bottom rail is necessary, cut an equal amount off both ends of the rail so to maintain uniform baluster spacing
between the posts. Insert the foot block into the bottom of rail so the notched end of the picket is inside the rail. Loosely position the
2" x 3-1/2" bracket covers on opposing ends of the bottom rail.
Step 4 - Secure the bottom rail.Attach the bottom rail to the nylon post brackets by using the (4) #10 x 1" pan-head screws. The
bottom rail will be 2" off the deck surface with the foot block resting on the deck surface and the rail inserted correctly into the nylon
post brackets. Fasten two screws into each side of the nylon post bracket using the top and bottom slots of the nylon post brackets.
Once secured, snap the 2" x 3-1/2" straight bracket covers positioned in Step 3 onto the nylon post brackets.
17
8
"
383
8
"
for 42"
Guardrails
Step 2 - Secure post mounting brackets.Attach the nylon post brackets to the sleeved posts by using the (4) #10 x 1-1/2" pan-head
screws for the 4" x 4" treated wood post, or the (4) #10 x 1" pan-head screws for the LMT Blu-Mount with aluminum or PVC guides.
Measure and secure the bottom nylon post bracket 1-7/8" from the installed deck surface. Similarly secure the top nylon post brackets
to the installed posts 38-3/8" from the deck surface for a 42" railing heights or 32-3/8" for 36" railing heights.