Presidio Reliant Series User manual

Bottom Rail
2" x 3-1/2"
Webbed February 2010
PRESIDIO®
PRESIDIO®
Reliant
®Guardrail Series
Reliant
®Guardrail Series
Top Rail
2" x 3-1/2"
Hollow
* 4" Post Cap
Top Rail Aluminum
Insert
1-1/2" Square 1-1/2" Colonial
Foot
Block
Bottom Rail
*Accessories items may be purchased separately.
2" x 3-1/2"
Guardrail Bracket
2" x 3-1/2"
Guardrail
Bracket
*4" x 4"
PVC Post
* 4" Post Skirt
Foot Block
Aluminum
Insert
Balusters
Guardrail Kit Instructions
TOOLS REQUIRED: Tape Measure - Screw Gun - Screw/Drill Bit
Chop Saw/Hack Saw - Square - Level
GUARDRAIL KIT CONTENTS
Components 4' Kit 6' Kit 8' Kit
Top Rail - 2" x 3-1/2" Hollow with pre-routed
holes (Top rail routed on one side of rail) (1) (1) (1)
Bottom Rail - 2" x 3-1/2" Webbed with pre-routed
holes (Bottom rail routed on both sides of rail) (1) (1) (1)
Aluminum Insert - for top rail (1) (1) (1)
2" x 3-1/2" Guardrail Brackets - with nylon post
brackets, covers and fasteners (4) (4) (4)
Balusters - 1-1/2" Square or 1-1/2" Colonial
(one style per selected kit) (9) (14) (18)
Foot Block - notched on one end (1) (1) (1)
PRESIDIO®
Step 1 - Prepare and install posts and decking. Prepare the posts and mounting surfaces to which the rail section will be attached. A
typical installation uses a 4" x 4" vinyl post sleeved over either a 4" x 4" treated wood post, or an LMT Blu-Mount with aluminum or
PVC guides. When using PRESIDIO
®
PVC Decking, the 4" x 4" treated wood post should extend 38-1/2" above the wood joist framed
structure for 36" high railing systems, and 44-1/2" above the wood joist framed structure for 42" high railing systems. Cut and fasten
the posts to the wood framing or if you are installing your PRESIDIO
®
guardrail system on a concrete surface, install LMT Blu Mounts
following the supplied Blu Mount installation instructions. Install decking boards over or around post supports. (Please refer to the
decking installation instruction manual for the correct installation procedures of the deck boards.) Sleeve the post supports with a 4"
vinyl post. (This sleeve should measure 38" above the finished deck surface for 36" railing heights or 44" for 42" railing heights.) The
installed post sleeves must be plumb for correct installation of the rail section. If vinyl post skirts are being used at the base of the
posts, slide the post skirts into position so that they come to rest around the base of the 4" x 4" sleeved post.
Step 3 - Measure and cut the bottom rail. The bottom rail is identified by having routed holes on each side of the rail. One side for
the insertion of the balusters and the other for the foot block. Measure the distance between the base plates of opposing nylon post
brackets. If cutting of the bottom rail is necessary, cut an equal amount off both ends of the rail so to maintain uniform baluster spacing
between the posts. Insert the foot block into the bottom of rail so the notched end of the picket is inside the rail. Loosely position the
2" x 3-1/2" bracket covers on opposing ends of the bottom rail.
Step 4 - Secure the bottom rail.Attach the bottom rail to the nylon post brackets by using the (4) #10 x 1" pan-head screws. The
bottom rail will be 2" off the deck surface with the foot block resting on the deck surface and the rail inserted correctly into the nylon
post brackets. Fasten two screws into each side of the nylon post bracket using the top and bottom slots of the nylon post brackets.
Once secured, snap the 2" x 3-1/2" straight bracket covers positioned in Step 3 onto the nylon post brackets.
17
8
"
383
8
"
for 42"
Guardrails
Step 2 - Secure post mounting brackets.Attach the nylon post brackets to the sleeved posts by using the (4) #10 x 1-1/2" pan-head
screws for the 4" x 4" treated wood post, or the (4) #10 x 1" pan-head screws for the LMT Blu-Mount with aluminum or PVC guides.
Measure and secure the bottom nylon post bracket 1-7/8" from the installed deck surface. Similarly secure the top nylon post brackets
to the installed posts 38-3/8" from the deck surface for a 42" railing heights or 32-3/8" for 36" railing heights.
Reliant
®Guardrail Series Assembly Instructions
Reliant
®Guardrail Series Assembly Instructions
17
8
"
323
8
"
for 36"
Guardrails
PRESIDIO®
Step 5 - Insert the balusters. Having secured the bottom rail into place, insert the balusters into the bottom rail. If the 1-1/2" colonial
balusters are being used make sure the balusters are inserted so the baluster tapers are uniformly installed.
Step 6 - Measure and cut the top rail. If cutting of the top rail is necessary cut an equal amount off both ends of the rail to maintain a
uniform baluster spacing between the posts. The rail kits are provided with an aluminum insert and must be used. Cut the aluminum
insert to the appropriate length of the measured top rail. Insert the aluminum into the top rail and loosely position the 2" x 3-1/2"
bracket covers on opposing ends of the top rail.
Step 7 - Secure the top rail. Position the top rail over the exposed ends of the balusters so that it is positioned on the resting flange of
the installed nylon post brackets. Attach the top rail to the nylon post brackets by using the (4) #10 x 1" pan-head screws. Fasten two
screws into each side of the nylon post bracket using the top and bottom slots of the nylon post brackets. Snap the 2" x 3-1/2" bracket
covers positioned in Step 6 onto the nylon post brackets.
1-1/2" Square 1-1/2" Colonial
PRESIDIO®
Step 8 - Finish the section. Secure the 4" x 4" post caps onto the post tops by applying PVC adhesive to the internal surfaces of the
post caps. Set the caps onto the post tops. Wipe off any excess adhesive.
Please direct product inquires to:
Customer Service Department
Westech Building Products
P.O. Box 567
Mount Vernon, IN 47620
U.S.A
Tel. (812) 985-3628
Fax. (812) 985-2925
[email protected]

Popular Indoor Furnishing manuals by other brands

OSP Home Furnishings HAGNEY HGN783 Assembly instructions

OSP Home Furnishings

OSP Home Furnishings HAGNEY HGN783 Assembly instructions

Costway HY10202 manual

Costway

Costway HY10202 manual

Lee & Plumpton SmartTop Series Assembly instructions

Lee & Plumpton

Lee & Plumpton SmartTop Series Assembly instructions

Furniture of America Enrico CM7068CK Assembly instructions

Furniture of America

Furniture of America Enrico CM7068CK Assembly instructions

JWA MARTOS 68548 Assembly instruction

JWA

JWA MARTOS 68548 Assembly instruction

comfortel Salon mirror joiner 8030 owner's manual

comfortel

comfortel Salon mirror joiner 8030 owner's manual

Costway HW61311 user manual

Costway

Costway HW61311 user manual

Home affaire Nekso 63620206 Assembly instructions

Home affaire

Home affaire Nekso 63620206 Assembly instructions

artograph FUTURA LIGHT 10062 Assembly instructions

artograph

artograph FUTURA LIGHT 10062 Assembly instructions

burgbad Max1 Fitting instructions

burgbad

burgbad Max1 Fitting instructions

Dorel DA1008-1 Assembly guide

Dorel

Dorel DA1008-1 Assembly guide

homechoice Ivana Assembly instructions

homechoice

homechoice Ivana Assembly instructions

Argos Home Chrome Double Tidy Rail HD 171/7639 Assembly instructions

Argos Home

Argos Home Chrome Double Tidy Rail HD 171/7639 Assembly instructions

Forte Kashmir KSMS955S3 Assembling Instruction

Forte

Forte Kashmir KSMS955S3 Assembling Instruction

IKEA CIRKUSTALT Assembly instructions

IKEA

IKEA CIRKUSTALT Assembly instructions

rst brands SL-CAB-5-MGNY Assembly instructions

rst brands

rst brands SL-CAB-5-MGNY Assembly instructions

Little Partners GROW WITH ME CHAIR LP0800 Assembly

Little Partners

Little Partners GROW WITH ME CHAIR LP0800 Assembly

4living COLLECTION 229153 manual

4living COLLECTION

4living COLLECTION 229153 manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.