PSS GARED FGP 200 Manual

FOOTBALL/SOCCER COMBO GOAL
Models: FGP 200
Installation, Operation and Maintenan e Instru tions
Please read all instru tions before attempting installation or operation of these units
SAVE THESE INSTRUCTIONS FOR FUTURE USE
P
UBLICATION
N
O
.
651753916 revB 09-21-20

FGP 200
1
Table of Contents
Section Page No.
Introduction 1
Specifications 2
Cautions and Warnings 3
Parts Checklist 4
Assembly and Setup
Maintenance 10
Introduction
Thank you for your purchase of model FGP 200 Combo Football/Soccer Goal. To ensure that
our equipment will provide years of use to you, we are including this installation, operation, and
maintenance guide. This guide will provide information on the proper assembly and installation
methods, operating procedures, and preventative maintenance of your portable backstop.
Please note that a Bill of Materials is being included with this guide. Please check that all of the
parts called out on the Bill of Materials are present prior to beginning assembly and setup.
Please do not substitute for factory parts. Please contact the manufacturer and allow them to
determine if substitute parts are acceptable.
It is recommended that an individual who has been properly trained perform assembly and set up
of the backstop. No one under the age of 18 should attempt assembly or set up of the unit, unless
properly supervised.
To prevent normal wear and tear from shortening the life of the unit, preventative maintenance
inspections and repairs should be performed at least once per year. If the units are subject to
high or unusual usage, inspections should be scheduled to occur more frequently. If items are
found to be nonconforming, replacements can be ordered from one of our authorized dealers.
When contacting your dealer, please have information regarding the dealer/installer who sold the
unit, the name of the project, and any applicable warranty information.

FGP 200
2
Specifications

FGP 200
3
Read and understand the following warnings to prevent possible personal injury and potential
damage to the equipment during assembly, setup, and operation.
Before proceeding with assembly, read all instru tions and assembly pro edures. Make sure
all parts have been received and are not damaged.

FGP 200
4
Parts Checklist
Verify all parts listed on packing list are present prior to installation.
The following parts have been packed separately
If parts are needed please refer to the part number at time of replacement order is made.
ITEM
QTY
PART NUMBER
DESCRIPTION
1
4
101653829
VINYL END CAP, 4" SQUARE W ITE
2
4
501-5-18-40
BOLT, CARRIAGE 5/16-18 UNC X 2.5
3
16
502-6-16-12Z
EX BOLT, 3/8-16 UNC X 0.75
4
8
502-6-16-40
EX BOLT, 3/8-16 UNC X 2.5
5
6
502-8-13-16
EX BOLT, 1/2-13 UNC X 1
6
4
502-8-13-48
EX BOLT, 1/2-13 UNC X 3
7
12
502-8-13-80
EX BOLT, 1/2-13 UNC X 5
8
4
509-5-18-38SS
EX SOCKET BUTTON EAD 5/16-18 X 2.375
9
4
545-5-18SS
NUT, NYLON LOCK 5/16"-18 SS
10
4
545-5-18Z
EX NUT, NYLON LOCK 5/16-18
11
8
545-6-16Z
EX NUT, NYLON LOCK 3/8-16
12
22
548-8-13
EX NUT, SERRATED FLANGE 1/2-13
13
4
561-5
FLAT WAS ER 5/16
14
8
561-5SS
FLAT WAS ER 5/16 SS
15
16
562-6
SPLIT LOCK WAS ER 3/8
16
8
651652570
J-STAKE ANC OR
17
4
651653590
CLAMP (2- ALVES), 1.66 X 1.66 TEE
18
8
651653682
BRACKET, BACKSTAY ATTAC MENT
19
4
656202400
BACKSTAY, BENT 8' (1.66 OD)
20
4
656202401
BACKSTAY, STRT 8' (1.66 ODX87"L)
21
2
656202402
B'STAY BAR 24'W GOAL 1.66ODX289.8"L
22
4
656253880
GROUND SLEEVE ASSEMBLY, 4" SQUARE
23
4
656253894
CAP WLDMNT, 4" GROUND SLEEVE
24
4
656253903
ORIZONTAL MAST, COMBO GOAL
25
4
656253909
MAIN POST COMBO GOAL 4" SQ
26
4
656253912
UPRIG T TUBE, COMBO GOAL POST
29
1 pr*
SN824-4W
NET, SOCCER-4MM W ITE 8X24 GOAL
30
4
656202389
VELCRO STRAP, 1 X 16.5" (PKG OF 12)
31
2
656202418
VELCRO STRAP, 1 X 24" (PKG OF 12)
32
1
651753916
MANUAL, FGP200 SOCCER/FTBALL INSTALL
*Net sold separately. 1 pair required.
Contact dealer or manufacturer for assistance with replacement of any parts missing or damaged.

FGP 200
INSTALLATION INSTRUCTIONS
Tools Required:
Wrench sizes needed
1/2
9/16
3/4
Hammer
Concrete tools

FGP 200
6
Preparation for installation
1. Layout the location for the holes on the field. For the FSG 200 permanent series goals (4” square
posts), the center of the hole must be centered on a line at the back of the end zone.
2. Dig the hole as shown in Figure 1, for the typical installation, Figure 1 shows a dimension for
reference of installation. (See not 3)
3. Approximately, 2 foot has been added to the post length for placement of goal post in concrete.
A 6” base of gravel is recommended and a drain tube used for post drainage. It is highly
recommended that the goal is fully assembled before setting in concrete. The rule restrictions
applied for the goal in either sport, set the exact height and width, with strict numbers.
Adjustments after installation will be difficult, if not impossible.
4. A secondary support system during construction will insure proper settings for goal placement.
Please note the bottom edge of the horizontal mast is to be 96” from ground level; the top
surface is to be 120”. Check for plumb in all directions and placement of bolts should put the
head towards play area whenever possible.

FGP 200
7
Goal Assembly
1. Layout the components for the goal on the
ground in position to be connected
together. Refer to the following pictures
for general layout of parts.
2. Make sure the cross bar sections are
position with the upright tube facing up.
3. Once the components are laid out, begin by
bolting the two crossbar sections, item #24,
together in the middle using ½” hardware.
4. Next, slide the main post, item #2 , up to each
end and bolt the post to the crossbar end using
three ½” bolts.

FGP 200
8
. When the posts are bolted to the crossbars, slide
the upright tube into the square receiver tube on
the crossbar. The outermost receiver tubes are for
high school location and the inner receiver tubes
are for college location.
6. Bolt the upright into the receiver tube at the top of
the crossbar location using one ½” bolt.
7. Bolt backstay bracket, item #18, to post as shown
in detail A (top of post) and detail B (bottom of
post). Note that the posts are tapped to receive
3/8” bolts.
8. Assemble two piece backstay by sliding swedged
end of straight tube, item #20 into formed tube,
item #19, and bolt with /16” hardware as shown in
detail D.
9. Attach backstays to backstay brackets, items #18,
using 3/8” hardware.
High School
Receiver
College
Receiver

FGP 200
9
10. The goal is now ready to stand up and
set into hole and pour the concrete
foundation or insert into sleeves.
Foundation should be 18” diameter and
36” minimum depth. Goal frame will
need to be supported at the proper height
and post position while concrete cures.
11. With unit standing in playing position,
install the backstay ground bar, item
#21, using tee bracket, item #17.
12. Install J-Stake Anchors, item #16.
13. Install soccer net.
a. Use 16. ” ties on horizontal cross
bar frame at approximately 12”
increments.
b. Use 24” ties to attach to vertical
posts at approximately 18”
increments.
14. Install sleeve cap, item #23, when goal has been removed.

FGP 200
10
Maintenan e
1. General inspection of equipment when used should be performed to ensure no catastrophic
failures have occurred during the course of use between yearly inspections.
2. It is recommended that yearly inspections be conducted to determine if any bolts or other
hardware has become worn or loosened.
3. During yearly inspections, check all joints to make sure they are tight and secure. Check
the net for wear, holes, torn rope, etc.
4. Any loose bolts or nuts should be tightened.
. Replace any components that are missing or worn.

Gared Holdings, LLC
Performan e Sports Systems Gared Sports
9200 E. 146
th
Street 9200 E. 146
th
Street
Noblesville, IN 46060 Noblesville, IN 46060
800-848-8034 800-325-2682
www.perfsports. om www.garedsports. om
Table of contents
Other PSS Sport & Outdoor manuals