
TABLE OF CONTENTS
SECTION 1: Air Handler Safety.............................................. 1
1.1 Description of Operation............................................... 1
1.2 Inspection and Setup ................................................... 1
1.3 Temporary Storage....................................................... 2
1.4 Safety Labels and Their Placement .............................2
1.5 California Proposition 65 ..............................................2
1.6 Label Placement .......................................................... 3
SECTION 2: Installer Responsibility ..................................... 6
2.1 Corrosive Chemicals.................................................... 6
2.2 National Standards and Applicable Codes .................. 6
2.3 Required Equipment .................................................... 6
SECTION 3: Critical Considerations ..................................... 8
3.1 Required Clearances to Combustibles......................... 8
3.2 Hardware ..................................................................... 8
SECTION 4: National Standards and Applicable Codes ..... 9
4.1 Gas Codes................................................................... 9
4.2 Installation Codes ........................................................ 9
4.3 Aircraft Hangars ........................................................... 9
4.4 Parking Structures and Repair Garages ...................... 9
4.5 Electrical ...................................................................... 9
4.6 Venting......................................................................... 9
4.7 High Altitude ................................................................ 9
SECTION 5: Specifications .................................................. 10
SECTION 6: Liftingan Air Handler (Rigging)...................... 27
6.1 Preparing to Lift the Air Handler.................................27
6.2 Lifting a Horizontal Air Handler ..................................28
6.3 Lifting an Vertical Air Handler ....................................29
6.4 Upright Assembly Alignment...................................... 31
SECTION 7: Air Handler Assembly...................................... 32
7. 1 C a ulking the Air Handler............................................. 33
7. 2 C a ulking a Horizontal Air Handler............................... 34
7. 3 C a ulking an Vertical Air Handler................................. 35
7.4 Accessory Connections.............................................. 37
SECTION 8: Roof Curb ......................................................... 41
8.1 Roof Curb Assembly and Installation......................... 41
SECTION 9: Indoor Suspension Mounting-
Horizontal Air Handler .................................... 46
9.1 Suspension Mounting Assembly and Instructions ..... 46
SECTION 10: LegMounting................................................. 48
SECTION 11: Filter Section .................................................. 51
SECTION 12: Inlet Hoods ..................................................... 52
12.1 Inlet Hood Assembly ................................................ 52
SECTION 13: Service Platform............................................. 55
13.1 Service Platform ...................................................... 55
SECTION 14: Discharge accessories .................................. 57
14.1 One-Way, Three-Way and Four-Way Discharge
Head Installation ...................................................... 57
14.2 Splash Plate Installation........................................... 63
SECTION 15: Vibration Isolation.......................................... 64
SECTION 16: CoolingSpecifications .................................. 68
16.1 Evaporative Cooling ................................................. 68
SECTION 17: Duct Considerations...................................... 69
17.1 Inlet Air Duct ............................................................. 69
17.2 Return Air Duct ......................................................... 69
17.3 Supply Air Duct Work ............................................... 69
SECTION 18: Gas Piping...................................................... 70
18.1 Gas Manifolds.......................................................... 70
18.2 Gas Piping and Pressures ....................................... 70
18.3 Gas Piping ................................................................74
18.4 Pressure Test Ports...................................................74
SECTION 19: Electrical......................................................... 75
19.1 Disconnect Fuse Sizing .......................................... 76
19.2 Wiring and Electrical Connections ........................... 76
19.3 Remote Panel .......................................................... 76
19.4 Motor Current Draw................................................. 76
19.5 Control Current Draw............................................... 77
19.6 Safety Systems........................................................ 77
19.7 Interlocks ................................................................. 79
19.8 Control Options........................................................ 79
19.9 Safety Systems........................................................ 81
19.10 Remote Panels ...................................................... 82
19.11 DDC-Ready Controls ............................................. 90
19.12 Intelligent Control Systems .................................... 92
19.13 HVAC Remote Panels and Panel Options ............. 94
19.14 Basic Air Handler Sequence of Operation ............. 96
19.15 Honeywell®RM7890 Flame Safeguard................ 100
SECTION 20: Direct Fired Burner .......................................112
20.1 Direct Fired Burner Ignition.....................................115
20.2 Direct Fired Burner Flame Proving (Flame Rod) ....116
20.3 Honeywell UV Flame Detector ...............................119
20.4 Honeywell UV Flame Detector (Continued)........... 120
SECTION 21: Start-up Procedures .................................... 121
21.1 Installation of Recirculating Air Handler ................. 122
21.2 Mechanical............................................................. 122
21.3 Electrical ................................................................ 123
21.4 Airflow.................................................................... 123
21.5 Gas Piping and Initial Pressure Settings ................ 124
21.6 Safety Shut Off Valve Check .................................. 126
21.7 Temperature Control System Calibration................ 126
SECTION 22: Maintenance................................................. 129
22.1 General.................................................................. 130
22.2 Unit Exterior........................................................... 130
22.3 Blower Section...................................................... 130
22.4 Manifold and Controls............................................ 132
22.5 Burner................................................................... 132
22.6 Optional Equipment............................................... 134
SECTION 23: Replacement Parts ...................................... 135
SECTION 24: Troubleshooting.......................................... 136
24.1 Initial Checks ......................................................... 137
24.2 Motor and Blower ................................................. 137
24.3 Burner................................................................... 138
24.4 Temperature Controls ........................................... 139
24.5 A1014 Amplifier - Field Checklist .......................... 140
SECTION 25: RAPID®4000-Series Start-Up Procedures. 143
SECTION 26: RAPID®4000-Series Start-Up Procedures
Evaporative Cooler ............................................................. 148
SECTION 27: The RAPID®4000-Series Warranty............. 151
© 2018
Rapid Engineering LLC
All rights reserved. No part of this work covered by the copyrights herein may be reproduced
or copied in any form or by any means - graphic, electronic, or mechanical, including
photocopying, recording, taping or information storage and retrieval systems - without the
written permission of Rapid Engineering LLC.
Printed in
the U.S.A.