Red Jacket Accu-Flo Maxxum Big-Flo User manual

— 1 —
W
IRING INSTRUCTIONS - 208-230 VOLT SINGLE PHASE PUMPS
The motor control box must be located away from the fueling area in a nonhazardous location.
1. Connect the single phase 208-230 V power supply from the distribution panel to terminals L1 and L2 in the motor
control box. Each control box should be wired through a separate fused disconnect switch or circuit breaker
(including neutral, when used).
2. Using properly color coded wires, connect wires from the red, black, orange and two blue terminals on motor
control box terminal strip to the corresponding color coded wires in the junction box of the proper submerged
pump.
3. Connect wires from terminal Blue-1 and terminal 3 in motor control box to dispenser control switches (if
dispensers are used) and “on-off” switch at loading rack.
The “on-off” control station must be of explosion-proof construction. Where loading racks and dispensers are
served by the same submerged pump, the 2-wire switches must be connected in parallel so the submerged
pump can be controlled from any dispenser or any loading rack.
4. The pumps are equipped with a no-liquid, over-temperature switch in the motor and an overload switch in the
motor control box which will cut out if the motor is overloaded. If the pump fails to operate, or stops, when there
is sufficient product in the storage tank, check the manual overload reset switch in the control box cover. Wait 10
minutes for the overload protector to cool off and then press the reset button.
If the reset button will not stay in position this indicates an overloaded motor, or a
short to ground. This condition must be corrected. If the reset button stays in but
the motor will not pump or continue to run, the tank is dry.
5. If an external pilot light is desired to indicate when the submerged pump is operating, wire as shown in figure A.
Should this light continue to burn when all switches at dispensers and loading racks are off, this indicates that
one of the dispenser switches is out of adjustment. On installations with no external pilot light, the submerged
pump should be checked to make sure it is not operating when all switches are turned off.
CAUTION
MAXXUM
The following defined terms are used throughout this literature to bring attention to the presence of hazards of various risk levels, or to important information concerning the life of the product.
indicates presence of a hazard which
will
cause
severe
personal
injury, death or substantial property damage if ignored.
indicates presence of a hazard which
can
cause
severe
personal
injury, death or substantial property damage if ignored.
DANGER
WARNING
indicates presence of a hazard which
will
or
can
cause
minor
personal
injury, death or substantial property damage if ignored.
indicates special instructions on installations, operation, or maintenance
which are important but not related to personal injury hazards.
CAUTION
NOTICE
Installation Instructions
M
AXXUM BIG-FLO
The electrical and wiring information in this supplement supersedes the information
found in the enclosed manual. For all other installation information refer to the
enclosed manual.
NOTICE

—2 —
W
IRING INSTRUCTIONS —208-230 VOLT, 400 VOLT OR 575 VOLT THREE PHASE PUMP
On some installations “phase converters”are used to obtain a three phase power
supply from a single phase power source. The use of phase converters may cause
an imbalance between the three phases and cause damage to the motor. For this
reason, warranty coverage will not be extended on units installed with phase
converters.
Power supply and equipment rating must match.
1. Installations where the magnetic starter is located away from the loading rack in a nonhazardous location.
Installations with the magnetic starter in a hazardous location require explosion
proof starters. The wiring is the same as for general purpose enclosures.
a. Connect the three phase power supply from the master panel to terminals L1, L2 and L3 in the magnetic
starter.
b. Using properly color coded wires, connect a black wire from terminal T1 in the magnetic starter to the black
motor lead, in the junction box of the proper submerged pump. Connect an orange wire from starter
terminal T2 to the orange motor lead and red wire from terminal T3 to the red motor lead. Power supply and
equipment rating must match. See figure B or figure D.
c. The 279-327-5 magnetic starter is shipped with the coil wired to accept 208-240 volts, 60 HZ. It may be
rewired to accept 110-120 Volts.
208-230 VOLT CONTROL BOX
Control box 1-1/2 HP, 208-230 Volt, 9.5 Amp.
Use Cutler Hammer heater 10177H-30A.
Rated 13.3 Amps, 140% rated motor amps.
Control box 2 HP, 208-230 Volt, 12 Amp.
Use Cutler Hammer heater 10177H-33A.
Rated 16.8 Amps, 140% rated motor amps.
CAUTION
FIGURE A
NOTICE
NOTICE
WARNING
WARNING

—3 —
To connect 110-120 Volts to the coil, rewire the coil per the wiring diagram label on the side of the contactor.
Next, connect a wire from terminal V of the coil to neutral. See figure C.
The 279-230-5 magnetic starter is shipped with the coil wired to accept 575 Volts, 60 HZ. It can not be
rewired.
The 279-231-5 magnetic starter is shipped with the coil wired to accept 190/240 Volts 50/60 Hz. It may be
rewired to accept 380/460 Volts 50/60 Hz.
d. There are two remaining blue wires in the submerged pump junction box. These are wired according to the
type of dispenser used.
Installations using mechanical dispensers must be connected for two-wire control. Connect either blue wire
to terminal L3 in the Magnetic Starter. Connect the other blue wire to one side of the “on-off” controls. The
“on-off” controls must be of explosion proof construction. Connect a Black wire from the other side of the
“on-off” control to terminal 3 in the magentic starter. See figure B.
Installations using electronic dispensers must be connected for one-wire control. Connect either blue wire to
terminal 3 in the Magnetic Starter. Connect the other blue wire to the “hot” feed from the dispenser. The
coil in the magnetic starter must be rewired for 115 volt and connected as shown in figure C.
Installations using loading racks only, may be connected for two-wire or three-wire control.
For two-wire control, connect either blue wire to terminal L3 in the magnetic starter. Connect the other
blue wire to one side of the “on-off” controls. The “on-off” controls must be of explosion proof
construction. Connect a Black wire from the other side of the “on-off” control to terminal 3 in the
magentic starter. See figure B.
For three wire control, connect either blue wire to terminal L3 in the Magnetic Starter. Connect the
other blue wire to one side of the “on-off” switch. The “on-off” switch must be of explosion proof
construction. Connect a Black wire from the other side of the “on-off” switch to terminal V in the
magentic starter. Connect a red wire from terminal 2 in the magnetic starter to the “on-off” switch. See
figure D.
3-wire control requires the use of an auxiliary contact in the magnetic starter. This
auxiliary contact is not standard equipment in the starters supplied by Red Jacket,
and must be ordered as an option. Use Furnas auxiliary field kit 49D2125001 or
equivalent.
e. Install proper overload heaters into magnetic starter.
Three phase pump/motor units must have proper overload and quick trip heaters
installed in the control box.
NOTICE
WARNING
PHegatloVZHxoBlortnoC).qeR3(sretaeHdaolrevO
2032/802065-132-972
ro
5-723-972
1-270-6301-810-160
3032/802061-670-6301-810-160
5032/802061-080-6301-810-160
5575065-032-9721-001-6301-810-160
3514/083055-132-9721-070-6301-810-160
5514/083055-132-9721-470-6301-810-160

—4 —
The control box must be grounded
for personal safety. Refer to the
National Electrical Codes and
applicable local codes for proper
grounding procedures.
Rewire coil for proper voltage.
NOTICE
BLUE
The control box must be grounded for
personal safety. Refer to the National
Electrical Codes and applicable local codes
for proper grounding procedures.
NOTE: OBSERVE COLOR CODE L1, L2, L3 PHASE
SEQUENCE FOR PROPER ROTATION OF MOTOR.
TO EXT.
PILOT LIGHT
115V SUPPLY
BLACK
RED
ORANGE
TWO WIRE THREE-PHASE
MOTOR WIRING DIAGRAM
FIGURE B
BLACK TO EXT.
PILOT LIGHT
115V SUPPLY
BLUE
BLUE
RED
ORANGE
BLACK
3-PHASE
POWER SUPPLY
3-PHASE
POWER SUPPLY
SWITCHES AT LOADING
RACKS AND/OR IN DIS-
PENSERS CONNECTED IN
PARALLEL
THERMAL OVERLOAD
THERMAL OVERLOAD
FIGURE C
ONE WIRE THREE-PHASE
MOTOR WIRING DIAGRAM
“HOT” FROM DISPENSER
NOTE: OBSERVE COLOR
CODE L1, L2, L3 PHASE
SEQUENCE FOR PROPER
ROTATION OF MOTOR.
L1
L2 L3
V
W
L2 L3
L1
V
W
2. Motor Rotation
Where it is not convenient to predetermine the power supply phase rotation, proper rotation can be determined by
pump performance. Pump head pressure and capacity will be considerably less than rated when rotating backwards.
Connect the pump motor leads to terminal T1, T2 and T3 of the magnetic starter observing color code shown in Figure
B, C or D. With ample product in the tank and the system purged of air, start the motor and take a pressure gauge
reading of the system pressure with the discharge valves closed; or, open one valve and calculate pumping rate.
Next, reverse power leads at L1 and L2. Repeat either pressure or capacity tests, as described above. If results are
higher than the first test, the rotation of the second test is correct. If the second test gives lower performance than the
first, reconnect the power leads to L1 and L2 (as under test 1) for correct rotation.
Where the power supply has been properly marked L1, L2 and L3 in accordance with accepted phase rotation
standards, it is possible to predetermine the proper rotation of these units. The motor power leads are color coded
black, orange and red, and if connected through the magnetic starter to L1, L2 and L3 respectively, the motor pump
unit will rotate in the correct direction. It is recommended, however, that the performance tests always be made
whether or not the power supply has been properly “phased out”.
NEUTRAL
WARNING WARNING

—5 —
3-wire control requires the use of
an auxiliary contract in the
magnetic contactor. Furnas
auxiliary interlock field kit
49D22125001 or equivalent.
The control box must be grounded
for personal safety. Refer to the
National Electrical Codes and
applicable local codes for proper
grounding procedures.
BLUE
RED
BLUE
BLACK
BLUE
RED
ORANGE
BLACK
NOTE: OBSERVE COLOR CODE L1, L2, L3 PHASE
SEQUENCE FOR PROPER ROTATION OF MOTOR.
TO EXT.
PILOT LIGHT
115V SUPPLY
SWITCH AT LOADING RACK
STOP
START
L1 L2 L3
W
V
WARNING
NOTICE
3-PHASE
POWER SUPPLY
THERMAL OVERLOAD
FIGURE D
THREE WIRE THREE-PHASE

051-325-1 Rev. A 7/99
Table of contents
Other Red Jacket Water Pump manuals
Popular Water Pump manuals by other brands

SELWOOD
SELWOOD H100 OPERATING & SERVICE MANUAL

Dover
Dover PSG Blackmer G Series manual

Hozelock
Hozelock 7816 manual

Pentair
Pentair Myers MSP4 Installation and service manual

Grundfos
Grundfos MAGNA1 C Installation and operating instructions

Champion Power Equipment
Champion Power Equipment C44025 Owner's Manual and Operating Instructions

DAB
DAB GENIX VT Instruction for installation and maintenance

Pfeiffer Vacuum
Pfeiffer Vacuum MVP 030-3 C DC operating instructions

Edwards
Edwards EXT400/200/30H instruction manual

Gasboy
Gasboy AST Series manual

Cirs
Cirs 769 user guide

Antigravity Batteries
Antigravity Batteries MICRO-START TP-1 user manual