Supplied By www.heating spares.co Tel. 0161 620 6677
17
12. S t th corr ct full load burner pressure by m ans
of th pr ssur r gulator on th gas multibloc gas
valv (s Fig. 10, pos. 1).
Warning: Wh n th r quir d burn r pr ssur can
not b r ach d b caus of low inl t pr ssur , nsu-
r that th pr ssur r gulator r mains within it’s
op rating rang .
Now do th following:
• S t th burn r pr ssur to th high st possibl
valu (but not ov r th r quir d full load burn r
pr ssur ).
• Turn th pr ssur r gulator anticlockwis until th
burn r pr ssur is aff ct d.
• Th burn r pr ssur is now limit d, this will pr -
v nt th boil r from b ing ov r gass d should th
inl t gas pr ssur incr as .
13. S t th corr ct part load burner pressure:
• Turn th high/low th rmostat to it’s minimum s t-
ting (35°C). Wh n th flow t mp ratur is ov r
35°C, th boil r will burn at part load.
• S t th part load burn r pr ssur by turning th
adjustm nt ring (Fig. 10, pos. 2).
• To ch ck th th high fir s tting: Turn th
high/low th rmostat to 85°C and ch ck th full
load burn r pr ssur (if n c ssary r -adjust).
Th sp d of op ning of th main gas valv can
also b adjust d to nsur a smooth light up. S t-
ting th hydraulic brak on th main gas valv as
follows:
• R mov th s tting cap (Fig. 10, pos.3) and turn it
upsid down on th hydraulic brak .
• Turn it clockwis to slow down, anticlockwis to
sp d up.
• Ch ck both burn r pr ssur s again and if n c s-
sary r -adjust.
14. Adjustm nt of th gas pressure switch LD (optional):
• Switch th boil r to full load.
• Conn ct a pr ssur gaug to m asuring point LD.
• Turn th adjustm nt disc of th pr ssur switch to
it’s minimum s tting.
• Now clos th main gas cock slowly until th inl t
pr ssur drops to th valu d tail d in th docu-
m ntation suppli d with th gas pr ssur switch.
• Slowly turn th adjustm nt disc of th pr ssur
switch until th pr ssur control op rat s.
• Th control box shuts down th gas supply and
will r start.
15. Adjustm nt of th gas pressure switch HD (optional):
• Switch th boil r to full load.
• Conn ct a pr ssur gaug to manifold.
• S t th pr ssur switch to th valu d tail d in
th docum ntation suppli d with th gas pr ssur
switch.
• Ch ck wh th r th gas pr ssur switch HD com s
to action at th s t valu by incr asing (Fig. 10,
pos.1) th full load burn r pr ssur to that valu .
Th boil r will lock out.
• R s t by pr ssing th r s t button on th gas
pr ssur switch HD. Th boil r will r sum op ra-
tion.
• S t th corr ct full load burn r pr ssur again
according §10.2.12.
16. Valve leakage control (optional)
• R mov plug Pa during boil r start up (s §10.2.
9).Th plug Pa is locat d opposit th valv l a-
kag control on th multibloc.Th boil r will lock
out.
• R s t by pr ssing th r s t button on th valv
l akag control.Th boil r will r sum normal op -
ration.
17. Ch ck th thermostats for th corr ct op ration s t-
ting.
18. Ch ck th flame control on the control box
• Start th boil r with disconn ct d ionisation prob ,
aft r th ignition phas th pilot gas valv must
clos . Th boil r will lock out.
• R s t by pr ssing th r s t button on th control
box.
• Th n disconn ct th ionisation prob during op ra-
tion, th pilot gas valv must clos imm diat ly.
Th boil r will lock out.
• R s t by pr ssing th r s t button on th control
box.
19. Water level control:
• Ch ck th wat r l v l.
• Ch ck th op ration of th wat r l v l control by
disconn cting th l ctrod . Th boil r should go
to lock out
• Cr at a shortcut b tw n th l ctrod and
arth. Th boil r should go to lock out
• R s t by pr ssing th r s t button on th instru-
m nt pan l. Th boil r will r sum op ration
20. Ch ck th down draft thermostat by pr ssing th
bim tallic strip on th th rmostat. Th boil r will shut
down for 3 minut s. Aft r that th boil r will r sum
op ration.
21. S nd th initial commissioning r port CE to Broag.