Introduction
© robatherm 1
Pos: 7.1 /Überschri ften/_Einleitung @ 0\ mod_1256570106184_2008. doc @ 2009 @ 1
Pos: 7.2 /Überschri ften/__Allgemeines @ 0\ mod_1256636424157_2 008.doc @ 2033 @ 2
General
Pos: 7.3 /Sicher heitshinweise/!Allge meines_Achtung @ 0\mod_12 56570744025_2008. doc @ 2013 @
Attention
These installation, commissioning and maintenance instructions must be read and
observed by all people who carry out work on the unit. For components which are not
described, the individual instructions are to be observed (request if required).
robatherm will not be held liable for damage or faults which result from non-observance of
these instructions.
The manufacturer’s warranty and the certificate of installation/conformity do not apply for
unofficial or unapproved conversions and changes to the appliance.
Pos: 7.4 /Einleitun g/Bestimmungsgemäße Ver wendung @ 0\mod_12565711 95178_2008.doc @ 2014 @ 4
Use for Intended Purpose
The unit supplied by robatherm must only be used for air handling. This includes filtering,
heating, cooling, humidifying, dehumidifying and transporting of air. robatherm expressly
forbids any other use.
Pos: 7.5 /Sicher heitshinweise/!Allge meines_ATEX @ 0\mod_1256 571433810_2008.doc @ 2015 @
Units with the „Ex“-mark (subsequently described as ATEX-units) are to be used in
accordance with the unit identification on the nameplate and on the technical data sheet in
accordance with the ATEX directive. Be sure to observe any restrictions on use.
ATEX units must not be used near:
High frequency sources (e.g. transmitters)
Strong light sources (e.g. lasers)
Ionising radiation sources (e.g. X-ray tubes)
Ultrasound sources (e.g. ultrasound echo testing equipment)
Pos: 7.6 /Einleitun g/Technikzentrale @ 0\ mod_1256574615063_2008. doc @ 2016 @ 4
Mechanical Equipment Room
The requirements of mechanical equipment rooms must be observed in accordance with the
VDI 2050 for operations and maintenance. This also includes sufficient maintenance space,
ventilation as well as compliance with the temperature and humidity requirements.
In front of heating and cooling coils, it is recommended to allow an obstacle-free area, at
least as wide as the AHU’s depth for maintaining those coils.
Pos: 7.7 /Einleitun g/Transport und Lagerung @ 0\mod_1256574654560 _2008.doc @ 2017 @ 4
Transport and Storage
All units and components must be transported and stored in such a way that damage,
adverse effects through weather factors, condensation (ensure sufficient rear ventilation
within the packaging) or contamination are avoided. When storing for over 3 months, loosen
belt drives and turn rotating components such as e.g. on ventilators, motors, pumps, HRS
rotors on a monthly basis.
Pos: 7.8 /Einleitun g/Montage_allgemei ner Hinweis @ 0\mod_12565747 00385_2008.doc @ 2018 @ 4
Installation
If units are supplied in separate sections, these shall be assembled in accordance with these
assembly instructions and professionally connected to the ductwork. All protective devices
shall be applied.
The person responsible for assembly on site and changing non-runable components to
complete ready to operate units is also responsible for issuing the certificate of conformity
and the CE marking.
Pos: 7.9 /Einleitun g/Vor_Inbetriebnah me@ 0\mod_125657474522 5_2008.doc @ 2019 @ 4
Before Commissioning
The unit can only be taken into operation if it has been assembled in accordance with these
instructions. All protective devices must be effective. A lockable service switch must be
installed near the fan unit access door.