
6
5/8" and 3/4" Sockets or Wrenches
15/16" and 1-1/16" sockets or Wrenches
WWW.RYVALHOOPS.COM 1 - 8 0 0 - 7 8 7 - 0 6 5 5
STEP D
a. Position the J-Bolt Template (U1) over the hole so that it is centered,
with the sides of the plate square with the sides of the hole.
b.Push the J-Bolts (U2) into the concrete until the J-Bolt Template is
resting flat against the surface of the concrete.
c. Grasp the tops of the J-Bolts and agitate the Template assembly back
and forth repeatedly to eliminate any air bubbles in the concrete. Lift the
Template slightly above the concrete when agitating . Make sure the
Template is resting on the concrete after agitating. Form the concrete
into a downward slope away from the Pole to allow water runoff.
d. Clean off any concrete that may be on the J-Bolt Template or the exposed
portions of the J-Bolts.
e. Using a carpenter’
s level, make sure the Template is square to and level
with the playing surface.
f. Allow the concrete to cure for a minimum of 5-7 days before installing
the rest of your basketball system. In cold , wet weather or humid
climates, allow additional time for the concrete to cure.
YOU ARE NOW FINISHED WITH THE INITIAL ASSEMBLY STEPS. DO NOT PRO-
CEED WITH THE ASSEMBLY UNTIL THE CONCRETE HAS FULLY CURED . CUR-
ING WILL TAKE A MINIMUM OF 72 HOURS. IN HUMID CLIMATES OR WET
WEATHER, ALLOW ADDITIONAL TIME FOR THE CONCRETE TO CURE.
! !
WARNING
NEVER USE THE SYSTEM WITHOUT FOLLOWING THE CEMENTING INSTRUCTIONS . FAILURE TO
FOLLOW ALL OF THESE INSTRUCTIONS AND WARNINGS COULD LEAD TO SERIOUS PERSONAL INJURY
OR PROPERTY DAMAGE AS LISTED ON PAGE ONE.
U1
U2