manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Sealey
  6. •
  7. Rack & Stand
  8. •
  9. Sealey AP6548 User manual

Sealey AP6548 User manual

Other Sealey Rack & Stand manuals

Sealey MS081FS User manual

Sealey

Sealey MS081FS User manual

Sealey MK79 User manual

Sealey

Sealey MK79 User manual

Sealey MPS3 User manual

Sealey

Sealey MPS3 User manual

Sealey AS2000F.V2 User manual

Sealey

Sealey AS2000F.V2 User manual

Sealey AS20 User manual

Sealey

Sealey AS20 User manual

Sealey ES750.V2 User manual

Sealey

Sealey ES750.V2 User manual

Sealey STR004 User manual

Sealey

Sealey STR004 User manual

Sealey ES900F User manual

Sealey

Sealey ES900F User manual

Sealey MES03 User manual

Sealey

Sealey MES03 User manual

Sealey AS10 User manual

Sealey

Sealey AS10 User manual

Sealey STR004.V3 User manual

Sealey

Sealey STR004.V3 User manual

Sealey STR007 User manual

Sealey

Sealey STR007 User manual

Sealey BS104 User manual

Sealey

Sealey BS104 User manual

Sealey AS2000HS User manual

Sealey

Sealey AS2000HS User manual

Sealey RE55.V6 User manual

Sealey

Sealey RE55.V6 User manual

Sealey APTT User manual

Sealey

Sealey APTT User manual

Sealey RS16 User manual

Sealey

Sealey RS16 User manual

Sealey LC800ST User manual

Sealey

Sealey LC800ST User manual

Sealey ASH2000.V2 User manual

Sealey

Sealey ASH2000.V2 User manual

Sealey SSCL1 V2 User manual

Sealey

Sealey SSCL1 V2 User manual

Sealey PTSR5 User manual

Sealey

Sealey PTSR5 User manual

Sealey STR600 User manual

Sealey

Sealey STR600 User manual

Sealey MES02 User manual

Sealey

Sealey MES02 User manual

Sealey LR680.V2 User manual

Sealey

Sealey LR680.V2 User manual

Popular Rack & Stand manuals by other brands

Dynex DX-MP3MT Quick setup guide

Dynex

Dynex DX-MP3MT Quick setup guide

Konig & Meyer 24185 manual

Konig & Meyer

Konig & Meyer 24185 manual

ECG LD 326501 instruction manual

ECG

ECG LD 326501 instruction manual

Philips SB7S19S/00 quick start guide

Philips

Philips SB7S19S/00 quick start guide

Woodline KIT-250 lb instructions

Woodline

Woodline KIT-250 lb instructions

ricoo S1222 installation instructions

ricoo

ricoo S1222 installation instructions

Kanto P301 user manual

Kanto

Kanto P301 user manual

VidaBox VB MNT FFS2 installation guide

VidaBox

VidaBox VB MNT FFS2 installation guide

PROEL PLWIN60C user manual

PROEL

PROEL PLWIN60C user manual

AllMounts PLB-43S instruction manual

AllMounts

AllMounts PLB-43S instruction manual

VMP VH-001 instruction sheet

VMP

VMP VH-001 instruction sheet

Nederman SYSTEM 920/400 instruction manual

Nederman

Nederman SYSTEM 920/400 instruction manual

Glasdon ORBIS POST MOUNTING KIT installation guide

Glasdon

Glasdon ORBIS POST MOUNTING KIT installation guide

Songmics LGR105 manual

Songmics

Songmics LGR105 manual

Grape GM401 user manual

Grape

Grape GM401 user manual

FourStarGroup 11225296 manual

FourStarGroup

FourStarGroup 11225296 manual

CHIEF FLR100 installation instructions

CHIEF

CHIEF FLR100 installation instructions

FEC XDCAM EX PMW-EX30 manual

FEC

FEC XDCAM EX PMW-EX30 manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.

INSTRUCTIONS FOR:
RACKING UNIT WITH 5 SHELVES 600KG
CAPACITY PER SHELF
MODEL: AP6548
Thank you for purchasing a Sealey product. Manufactured to a high standard this product will, if used according to these instructions and
properly maintained, give you years of trouble free performance.
1. SAFETY INSTRUCTIONS
IMPORTANT: PLEASE READ THESE INSTRUCTIONS CAREFULLY. NOTE THE SAFE OPERATIONAL REQUIREMENTS, WARNINGS & CAUTIONS.
USE THE PRODUCT CORRECTLY AND WITH CARE FOR THE PURPOSE FOR WHICH IT IS INTENDED. FAILURE TO DO SO MAY CAUSE
DAMAGE OR PERSONAL INJURY, AND WILL INVALIDATE THE WARRANTY. PLEASE KEEP INSTRUCTIONS SAFE FOR FUTURE USE.
1.1 GENERAL SAFETY
WARNING! Ensure Health & Safety, and local authority regulations
are adhered to when assembling and using these shelves.
Locate shelves in a suitable area where they will not be an obstruction.
Keep the general area clean, uncluttered and ensure there is
adequate lighting.
WARNING! Erect shelves on a level and solid surface such as
concrete.
Keep children and unauthorised persons away from the storage
area.
DO NOT use the shelves for any purpose other than that for
which they are designed.
DO NOT site the shelves out of doors.
DO NOT get the shelves wet or use in damp or wet locations or
areas where there is condensation.
DO NOT clean the shelf suports with any solvents which may
damage the coated surface.
Ensure that the shelves are properly assembled before loading
them with heavy items.
Maximum load for each shelf is 600kg.
Where possible the unit should be fixed to the wall with
suitable fixings
Place heavier items on the lower shelves.
Where possible heavier items should be evenly distributed across
the shelves.
3. CONTENTS
2. INTRODUCTION
Carefully unpack the product and check the contents as detailed
in Fig.3. Should any items be missing or damaged contact your
Sealey dealer.
4. ASSEMBLY
4.1 We recommend that this shelving unit be assembled by two
people. To aid assembly use a rubber mallet or a hammer and a
piece of wood. Do not use a hard faced hammer directly on the
'Z' beams as this will damage their surface finish. Make sure that
all the 'Z' beams are fully interlocked with the angle posts before
using the unit. (The rivets on the 'Z' beams must seat at the
bottom of the keyhole slots ). Do not use any parts that are
damaged and/or distorted as these may assemble incorrectly and
result in an installation that is unsafe and which may cause injury
or damage when the shelves are loaded.
Fig.1
Fully painted steel frame with five MDF shelves. Z Shape beams
offers added strength with 600kg capacity per level, giving a
maximum capacity of 3000kg per rack. Boltless design means no
tools required to assemble. Clips together in minutes. Used as a
single bay full height rack (Fig.1) or split into two separate half
height storage stations (Fig.2).
Height: 1828mm Width: 1216mm Depth: 460
AP6548 ISSUE NO:1 26/06/08
Fig.2
Fig.3
4.2 See Fig.4. Support two upright angle posts (A) in a vertical
position ensuring that the keyhole slots are pointing downwards.
Join them together at the base using a short 'Z' beam (C)
ensuring that the shelf support is facing upwards. Tap the beam
at either end, close to each angle post with a rubber mallet to
ensure that the rivets are seated at the bottom of the keyhole slots.
4.3 See Fig.5. Continue to assemble the complete bottom frame in
the order indicated above in Fig.5 starting with a long 'Z' beam (B).
Ensure that each 'Z' beam is facing upwards. Tap the beam
at either end, close to each angle post with a rubber mallet to
ensure that the rivets are seated at the bottom of the keyhole slots.
4.4 See Fig.6. Now make up an upper end frame by connecting two
angle posts together at the top with a short 'Z' beam (C). Tap the
beam at either end to ensure that the rivets are properly seated.
at the botton of the keyhole slots. Make up a second upper end
frame using the remaining two angle posts and a short 'Z' beam.
4.5 See Fig.7. Take the 4 post inserts (F) and push them into the top
of the four angle posts of the bottom frame assembly. Now join
the two upper end frames to the bottom frame by mounting each
frame onto the post inserts as shown below.
4.6 See Fig.8. Now stabilise the frame assembly by building a shelf
support halfway up the frame that joins together the upper and
lower parts of the frame. As each 'Z' beam is added ensure that
the top rivets are inserted into the bottom keyholes of the upper
frame and the lower rivets are inserted into the top keyholes of
the bottom frame as shown below. Tap the beams at either end
with a rubber mallet to ensure that the rivets are properly seated
into the keyholes.
AP6548 ISSUE NO:1 26/06/08
Fig.5
Fig.4
Fig.7
Fig.8
Fig.6
4.9 See Fig.11. Insert a post cap (E) into the top of each angle post
'A' as shown below. Lay a shelf 'D' in between the 'Z' beams at
each level created (See lower detail in Fig.11).
4.8 See Fig.10. Build one shelf support in the top half of the frame
and one shelf support in the bottom half of the frame at the
heights required. (The keyholes allow adjustment in 1 1/2"
increments). Ensure that the beams are the right way up with the
shelf support at the top. Tap the beams at either end with a
rubber mallet to ensure that the rivets are properly seated into
the keyholes.
4.7 See Fig.9. Now stabilise the top part of the frame by adding two
long 'Z' beams (B) to make a shelf support at the top of the
frame as shown in Fig.9. Ensure that the beams are the right
way up with the shelf support at the top. Tap the beams at either
end with a rubber mallet to ensure that the rivets are properly
seated into the keyholes.
Fig.11
Fig.9
Fig.10
AP6548 ISSUE NO:1 26/06/08
SPARE PARTS LISTING FOR AP6548
DESCRIPTION PART NO:
LEG AP6548.01
CROSS BEAM (L=457mm) AP6548.02
CROSS BEAM (L=1216mm) AP6548.02A
SHELF (1216 X 460mm) AP6548.03
CAP AP6548.04
PLASTIC CLIP AP6548.05
4.11 See Fig.13. Now start to build the second low level unit by
making up two end frames as shown in Fig.13. One short 'Z'
beam (C) should be fixed at the top of the angle posts and the
other short 'Z' beam (C) should be fixed at the 7th and 8th
keyholes up from the bottom of the angle posts as shown below.
Ensure that each 'Z' beam is facing upwards. Tap the beam
at either end, close to each angle post with a rubber mallet to
ensure that the rivets are seated at the bottom of the keyhole slots.
4.12 See Fig.14. Join the two end frames together using the four
remaining long 'Z' beams as shown above. Ensure that each 'Z'
beam is facing upwards. Tap the beams at either end, close to
each angle post with a rubber mallet to ensure that the rivets are
seated at the bottom of the keyhole slots.
4.13 See Fig.15. Lay the shelves into position between the 'Z' beams
as shown above.
4.14 See Fig.16. Place the two units end to end as shown below and
join them together using the 2 post clips (G). Insert a post cap
(E) into the top of each 'A' post.
Fig.12
Fig.13
Fig.14
Fig.15
Fig.16
01284 757500
01284 703534
sales@sealey.co.uk
Sole UK Distributor
Sealey Group,
Bury St. Edmunds, Suffolk.
www.sealey.co.uk
Web
email
4.10 HALF HEIGHT STORAGE STATION. See Fig.12. Follow steps
4.2 and 4.3 to create a bottom frame with four 'A' posts attached.
Using two long 'Z' beams (B) and two short 'Z' beams (C) build a
shelf support level at the top of the angle posts (A). Tap the
beams at either end, close to each angle post with a rubber
mallet to ensure that the rivets are seated at the bottom of the
keyhole slots. Build another shelf support level at the desired height
within the frame using additional long and short 'Z' beams and
ensure that the rivets are seated at the bottom of the keyhole slots.
AP6548 ISSUE NO:1 26/06/08