Assembly of Building -
PLEASE READ INSTRUCTIONS PRIOR TO ASSEMBLY
2 Lay the notched framework on a flat surface.
Slide in the three identical steps as far as
they will go into each notched section of both
frames. Screw each step into place using 2x
60mm screw, one at each side.
B - Assemble Railings
1 Place two rebated sections on a firm level
surface. Place on the rebated section two of
the slats – one at either end of the rebate. Drill
and screw into place using 2 x 25mm screws
per slat, one at either end.
Construct railings (using 3mm drill bit)
3 Fit the top step into place, to do this make
sure the shape of the step meets correctly
with the shape inside the top of the notched
framework. Screw the step into place using
2 x 60mm screws, one at each side.
1 Lay the 2 pieces 1790 mm long vertically on a
firm, level base with the 45mm side on the
floor. Place 2 of the 1700 mm pieces
horizontally INSIDE these to form a square.
Construct platform (using 6mm drill bit)
2 Evenly space out 4 slats, drill and secure in
place using 2 x 25 mm screws per slat, one
at either end. Repeat.
3 Place one piece of 435mm framework
behind the edge of the slats, one at either
end. Drill and screw using 3 x 25mm screws
per framework piece through the slat into the
framework. Repeat for other railings.
2 Drill and screw the outside frame together
using 2 x 80 mm screws at each corner.
Through the 1790 mm pieces into the 1700
pieces.
3 Determine which edge will be the front of
your building. From the inside of the front
framework measure 710mm back. Mark and
place 1700mm framework across. Drill and
screw into place using 2x 80mm screw per
side.
4 Place 3 pieces 710mm framework in the gap.
The two outer pieces should measure 390
mm from inside edge to inside edge. The two
inner spaces should measure 395mm from
inside edge to inside edge. Must be
measured accurately. This part will be the
front and where decking will be placed. Drill
and screw the 710 pieces into place 2 x
80mm screws per side.
6 Place a leg piece at each corner - inside the
frame. Drill, screw and fix each leg in to
place using 4 x 80 mm screws – 2 at each
side for each leg. Ensure leg is upright.
7 Place one leg support piece against a leg
and resting against the inside of the frame.
Drill and screw into position using 2 x 80 mm
screws into leg. Repeat for the other side of
the leg. Ensure the legs are always 90° to
the frame. At other end of the leg supports
drill and screw using 2 x 80 mm screws to
inside of frame. Repeat for other legs.
8 Turn the frame over. At least two people will
be required.
9 Place the floor of the building at the back of
the frame. The floor should fit flush at the
back and both sides to the outside edges of
the frame and to the last 1700 mm piece.
Drill and screw into position using 6 x 80
mm screws, 1 in each corner and 1 in the
centre of the front and back.
5 Measure back 184mm from the 1700mm
framework secured in C3. Mark and Place
another 1700mm piece of framework in.
From that piece measure back 338mm and
place the last 1700mm framework in. Drill
and screw both pieces, 2 x 80mm screws in
each side.
1 Drill through the centre of each notched area
on both posts where a ‘step’ will be screwed
into place.
1 Place the first piece of decking flush to the
front of the floor and edges of the platform.
Evenly space the 2 remaining pieces into
the remaining space. Drill and screw into
place using a total of 40 x 50 mm screws, 2
at the point where each slats rests on the
frame.
C - Assemble Platform
D - Fit Decking
E - Door AssemblyA - Assemble Ladder
Construct ladder (using 6mm drill bit)
7Fitting the door to front panel. Place the
door into the aperture. Ensure there is an
equal gap between the edges of the door
and the aperture. Screw into position using
3 x 25mm screws per hinge.
1. At the top and bottom of the hinge side of the
door, the corner of the weather proof
overhang needs to be removed. To do this:
determine which side of the door the hinge
will be fitted to allow either right or left
opening. Place the door on a flat, level
surface, face down. Measure 10 mm along
each side of each corner. Draw a diagonal
line connecting the two marks. Cut this
triangular section off using a saw. Repeat.
2. Place the continous hinge along the length of
the door making sure that the hinge does not
protrude at either top or bottom. Fit the small
inner part of the hinge to the door using 6 x
25 mm screws in total.
3 Place ring handle on the outside of the door,
inline with centre door framework. Mark the
holes.
4 Join the holes with a marker to find the centre.
Drill through centre.
5 Place the wooden handle on the inside of the
door and screw from the outside, using the
hole just drilled and 1x 45mm flat head screw.
6 Fix the ring handle, using 4 x 25mm black
screws, to the front of the door covering the
screw head.
1700mm
710mm
184mm
338mm
395mm 395mm 390mm
390mm