manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Sonnax Industries
  6. •
  7. Control Unit
  8. •
  9. Sonnax Industries 5R55N User manual

Sonnax Industries 5R55N User manual

56947J-05K
1 Valve
1 Plug
2 Springs
1 Dowel Pin
F-56947J-TL2
1 Reamer
1 Reamer Jig
1 Guide Pin
Note: The modulator sleeve and inner
modulator valve must be inspected for
probable bore wear.
Instruction
Data Sheet 5R55N/W/S
PART NUMBERS 56947J-05K, F-56947J-TL2
Oversized TCC Control Valve Kit
©2006 Sonnax® Industries, Inc. 56947J-05K Rev:-, 56947J-05K(in) 09-18-06
800-843-2600 • 802-463-9722 • F: 802-463-4059 • www.sonnax.com • [email protected] 1
R
E
Q
U
I
R
E
D
T
O
O
L
R
E
Q
U
I
R
E
D
T
O
O
L
INSPECTION:
On the 5R55W/S, place a small amount of oil into the TCC/PWM solenoid port. Follow with low air pressure. There should be little
or no leakage past the valve spool and out the TCC modulator port. Excessive leakage indicates wear.
NOTES OR CAUTIONS:
Reduced converter slip depends on proper line rise: Inspect the pressure regulator bore and PCA modulator bore.
REAMING INSTRUCTIONS:
Prep and Set-Up
1. Remove all components from the bore.
2. Clean the bore thoroughly.
3. To align the line modulator valve bore in the fixture, follow the VB-FIX instructions.
4. From tool kit F-56947J-TL2, use jig F-56947J-RJ and guide pin F-56947J-GP, then ream with reamer F-56947J-RM3.
NOTE: Extra attention should be paid to aligning and securing the valve body to the fixture on this bore. A very smooth action to insert and
remove the guide pin after final securing is a must to provide easy, on-center reaming of the bore.
5R55W/S Valve Body
Black Spring for
5R55W/S Valve Body
Oversized
TCC
Control
Valve
Dowel Pin
for 5R55W/S Valve Body
End
Plug
Reamer Jig
Guide Pin
Reamer
End
Plug
Clip
White Spring
for 5R55N
Valve Body
Oversized
TCC Control
Valve
5R55N
Valve Body
Spring
Fluid Cooler Bypass Valve
Thermo Valve
End Plug
Clip
Clip
5R55N/W/S
PART NUMBERS 56947J-05K, F-56947J-TL2
Oversized TCC Control
Valve Kit
©2006 Sonnax® Industries, Inc. 56947J-05K Rev:-, 56947J-05K(in) 09-18-06
800-843-2600 • 802-463-9722 • F: 802-463-4059 • www.sonnax.com • [email protected] 2
5. Soak the bore and reamer with cutting fluid (Mobilmet S-122, Lubegard Bio-Tap, Tap Magic™, etc.). For best results, provide a
continuous flow of water-soluble cutting fluid during the reaming process.
6. Gently insert the reamer through the jig and into the bore until the cutting tip contacts the first bore to be reamed.
7. Select the correct sized socket to fit the square shank of the reamer, and attach it to a wobble/swivel socket drive.
Reaming
NOTE: Once valve body alignment has been established on the VB-FIX, do not disturb or loosen the valve body setting or guide setting in any
way until the reaming process is complete. Be sure to use plenty of continuously supplied cutting fluid while reaming these bores.
1. The reamer should be turned by hand using a speed handle or by a low rpm, high torque air drill regulated to a maximum of 200 rpm.
2. The reaming action should be clockwise in a smooth and continuous motion, at 60-200 rpm. The reamer should actually pull itself
through the bore, so little or no forward force should be applied.
3. Continue reaming until the reamer bottoms in the bore. The approximate reaming time is 2 minutes.
Finish and Clean-Up
1. Using low air pressure, blow the chips free before removing the reamer.
2. To remove the reamer, turn clockwise while slowly pulling outward on the reamer.
3. Remove any remaining debris from the bore with low air pressure and clean in a solvent tank.
4. Examine the bore after cleaning for surface finish, debris, and burrs. Flashing and burrs on the exit side of casting bores can be care-
fully removed with a small piece of Scotchbrite™ on the end of a long wire.
5. Clean the reamer after each use and store in its protective tube.
Cautions and Suggestions
Turning the reamer backward will dull it prematurely.
Pushing on the reamer will result in poor surface finish and inadequate and sporadic material removal.
Never use a crescent wrench, ratchet or pliers to turn the reamer.
A dull reamer will cut a smaller hole.
INSTALLATION:
5R55N:
1. Remove and discard the OEM end plug, valve and spring. Keep the retaining clip.
2. Ream the bore according to the instructions.
3. Place the replacement white spring (10.5 coils, .240 O.D.) into the oversized valve spring pocket. Push the assembly into the bore,
spring side first.
4. Insert the replacement two-directional end plug just far enough to reinstall the OEM retaining clip.
5R55W/S:
1. Remove and discard the OEM end plug, valve and spring. Keep the retaining clip and all thermal bypass control components.
2. Ream the bore according to the instructions.
3. Press the enclosed .062" diameter x .31" long steel pin into the balance feed hole in the valve, as shown. Use of an arbor press is the
suggested method instead of hammering the pin in. Always verify the valve strokes well in the bore after pressing this pin.
4. Insert the replacement black spring (11.5 coils, .250 O.D) into the oversized valve spring pocket. Push the assembly into the bore,
spring side outward.
5. Insert the replacement, two-directional end plug just far enough to reinstall the OEM retaining clip. Reference the illustration for
proper retainer port.
6. Reinstall the thermal bypass control components as indicated.

This manual suits for next models

4

Popular Control Unit manuals by other brands

Gerber GH-305 Installation

Gerber

Gerber GH-305 Installation

Nordson Encore HD Customer product manual

Nordson

Nordson Encore HD Customer product manual

VAT 64246-UEHC-0001 Installation, operating,  & maintenance instructions

VAT

VAT 64246-UEHC-0001 Installation, operating, & maintenance instructions

Pepperl+Fuchs WCS-ECG410 manual

Pepperl+Fuchs

Pepperl+Fuchs WCS-ECG410 manual

Moons' MSSTAC5-2V Quick setup guide

Moons'

Moons' MSSTAC5-2V Quick setup guide

HMS IXXAT Safe T100 Safety Manual–Original Instructions

HMS

HMS IXXAT Safe T100 Safety Manual–Original Instructions

GSD WXT26M2101B quick start guide

GSD

GSD WXT26M2101B quick start guide

Almex SG1 operating manual

Almex

Almex SG1 operating manual

Trenz Electronic TEBT0782 Schematics

Trenz Electronic

Trenz Electronic TEBT0782 Schematics

TFT Ball Intake Valve manual

TFT

TFT Ball Intake Valve manual

GSD WXT26M2601B quick start guide

GSD

GSD WXT26M2601B quick start guide

GEM 656 Installation, operating and maintenance instructions

GEM

GEM 656 Installation, operating and maintenance instructions

DIEL ME 100 V3 Installation and instruction manual

DIEL

DIEL ME 100 V3 Installation and instruction manual

Quectel LTE-A Series Hardware design

Quectel

Quectel LTE-A Series Hardware design

Pickering PXI 40-785 user manual

Pickering

Pickering PXI 40-785 user manual

Automationdirect.com Productivity 2000 P2-08TD2S manual

Automationdirect.com

Automationdirect.com Productivity 2000 P2-08TD2S manual

Beninca LOGICA manual

Beninca

Beninca LOGICA manual

Ring Engineering AM-1b user manual

Ring Engineering

Ring Engineering AM-1b user manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.