Southern States EV-2 Installation and operating manual

EV-2 VERTICAL BREAK DISCONNECT SWITCH
INSTALLATION REFERENCE GUIDE
1
This guide is intended to be used as a recommended sequence of work steps but does not
supersede the instruction manual (IB-101-EV2) or assembly drawings. For assistance, contact the
Southern States Service Division (available 24/7) at 770-946-4565.
MOUNT PHASES PER ENGINEERING DRAWINGS
3
6
PIERCE VERTICAL BEARING
SET-SCREW COMPLETELY
NOTE: This will be the only piercing
until step 13. Ensure the full weight of the
vertical pipe is supported by the vertical
bearing and maintain the gap required
between the coupling and gear operator.
Then pierce collar. Also, conrm auxiliary
arm assembly is correctly mounted per the
operating mechanism drawing.
INSTALL ADJUSTABLE ARM &
DRIVE PHASE CLEVISES
Typical Mounting
Bolt Locations
Refer to operating mechanism drawing for pole orientation and mounting
Vertical Bearing Set Screw
(Pierce Bolt)
Drive Phase Clevis
Adjustable Arm
Refer To Instruction Book Section: Installation & Adjustment Procedures Refer To Instruction Book Section: Installation & Adjustment Procedures
Refer To Instruction Book Section: Installation & Adjustment Procedures
REVIEW BILL OF LADING (BOL)
A. Check the materials received against the packing list
B. Report any shortages or damaged equipment to Southern States
2REVIEW BILL OF MATERIAL (BOM)
A. Inventory all parts against the BOM found on the op-mech sheet inside
the drawing package
B. Report any missing or damaged parts to Southern States
TERMINOLOGY OVERVIEW
A: Live Parts
B: Insulator
C: Base
D: Jaw
E: Blade
F: Counterbalance
G: Contact Fingers
H: Switch Operating Arm
I: Bearing
J: Arcing Horns
A
B
C
C. A typical shipment will include:
- 3 phase switch (base, insulators, & live parts)
- Operating mechanism box
- Operating pipe
MOUNT VERTICAL BEARING,
PIPE, & OPERATOR
4
1/4” to
3/8” gap
Vertical Bearing Support
Vertical Pipe
Operator
Refer To Instruction Book Section: Installation & Adjustment Procedures
5
7CONNECT & TIGHTEN DRIVE PIPE BETWEEN
ADJUSTABLE ARM & AUXILIARY ARM OF DRIVE
PHASE WITH APPROPRIATE CLEVISES
Refer To Instruction Book Section: Installation & Adjustment Procedures
NOTE:
DO NOT PIERCE UNTIL STEP 13
8MATCH-MARK CLEVIS
CONNECTIONS, ADJ. ARM,
& OPERATOR COUPLING TO
MONITOR SLIPPAGE
Refer To Instruction Book Section: Installation & Adjustment Procedures
Drive Pipe
D
E
F G
H
I
J
Mounting Bolt
Locations
Vertical
Bearing
Support
Special Handling Required -
A qualied rigger and lift plan are
required due to possible off center,
high, center of gravity. Lift by switch
base only.
WARNING
SLING ATTACHMENT
Publication No. QSG101-EV-2 R0 12172020
SECURE
BLADE WITH
TIES DURING
LIFTING
Because the phase is top heavy, the
base must be bolted to the structure
before removing lifting straps to
prevent tipping.
CAUTION
Note: All material is marked with JO number
Vertical Pipe
TEST-OPERATE PHASES TO SEE IF ADJUSTMENTS ARE NEEDED. VERIFY ALL CRITERIA BELOW ARE MET.
C.
Blade must enter center of jaw
G.
Reach rod on op-mech should be toggled (snapped in) when it reaches the
full closed position (toggle in full open position also preferred if possible)
11
IF ADJUSTMENTS ARE STILL NEEDED, REFER TO STEPS
BELOW BASED ON THE SWITCH AND OPERATOR POSITION: 10 INSTALL INTERPHASE PIPE CONNECTING DRIVE PHASE WITH
OTHER TWO PHASES - SECURE WITH CLEVIS BOLTS & ADJUST
12 ENSURE REMAINING TWO PHASES FULLY CLOSE AND OPEN
PER STEP 11 GUIDELINES 13 FINAL CHECK & ASSEMBLY
B. Test operate to ensure specication is met.
D. Pierce all set-screws.
E. If motor operator is being used, ensure limit switches are set.
F. Ensure all accessories from the op-mech package are
installed (ground shunt, VM-1 swing handle, etc.).
A. Install any and all switch accessories (whips, interrupters,
MACI ®, arcing horns, etc.) per their assembly drawings.
All three phases should now be in adjustment. If a phase blade angle adjustment is needed,
you can loosen the stop bolt / jam nut to adjust the open angle.
Contact SSLLC if further adjustment issues occur.
F.
Blade angle must be at least 90Oin the full
open position if horizontally mounted
(70O for vertical and underhung mounting)
9
Loosen Bolts/Adjust Pipe & Arm
Once the interphase pipe is installed, test operate. If step 11
criteria are not met, loosen interphase clevis and adjust by
1/4” increments as needed. Ensure the switch is fully closed
by pushing on the lever arm, then re-tighten the clevises.
Refer To Instruction Book Section: Installation & Adjustment Procedures
Refer To Instruction Book Section: Installation & Adjustment Procedures
Refer To Instruction Book Section: Installation & Adjustment Procedures
A.
Blade contacts should be
centered front to back
B.
Contact ngers must be
centered on the blade tip in
the full closed position
D.
Contact bar must be within
“+” or “-” 5 degrees from at in
the full closed position
E.
Blade must fully rest on the
blade stop inside the jaw in the
full closed position
NOTE: FOR ARCING HORN ADJUSTMENTS, REFER TO INSTRUCTION MANUAL
IF Operator Reaches Full Open Position & Switch Is Not Fully Opened:
• Check for slippage
• Return switch to almost closed but not toggled
• Match-mark adjustable arm and pipe clevis
• Lengthen both the adjustable arm radius & pipe clevis by 1/4” increments
until full switch opening and operator rotation is achieved
IF Switch Is Fully Opened Before Operator Reaches Full Open Position:
• Check for slippage
• Return switch to almost closed but not toggled
• Match-mark adjustable arm and pipe clevis
• Shorten both the adjustable arm radius & pipe clevis by 1/4” increments
until full switch opening and operator rotation is achieved
Refer To Instruction Book Section: Installation & Adjustment Procedures
C. Land conductors to terminal pads and retest switch. Readjust
switch if necessary.
Refer To Instruction Book Section: Installation & Adjustment Procedures

Other manuals for EV-2

1

Other Southern States Switch manuals

Southern States ES-1 Service manual

Southern States

Southern States ES-1 Service manual

Southern States CVB-2 Service manual

Southern States

Southern States CVB-2 Service manual

Southern States CBL-T Service manual

Southern States

Southern States CBL-T Service manual

Southern States EV-2H Service manual

Southern States

Southern States EV-2H Service manual

Southern States COLE L Service manual

Southern States

Southern States COLE L Service manual

Southern States EV-2 Service manual

Southern States

Southern States EV-2 Service manual

Southern States SSB-T Service manual

Southern States

Southern States SSB-T Service manual

Southern States EV-1 Service manual

Southern States

Southern States EV-1 Service manual

Southern States RDA Service manual

Southern States

Southern States RDA Service manual

Southern States EC-2 Service manual

Southern States

Southern States EC-2 Service manual

Southern States EC-1 Service manual

Southern States

Southern States EC-1 Service manual

Southern States RDA-1V Service manual

Southern States

Southern States RDA-1V Service manual

Southern States EV-H Service manual

Southern States

Southern States EV-H Service manual

Southern States CSH Service manual

Southern States

Southern States CSH Service manual

Southern States ESD63 Service manual

Southern States

Southern States ESD63 Service manual

Southern States WAG User manual

Southern States

Southern States WAG User manual

Southern States EC-2V Service manual

Southern States

Southern States EC-2V Service manual

Southern States RDA-1V Service manual

Southern States

Southern States RDA-1V Service manual

Popular Switch manuals by other brands

D-Link DES-3010PA - Switch Web user guide

D-Link

D-Link DES-3010PA - Switch Web user guide

Endress+Hauser Liquipoint FTW 31 manual

Endress+Hauser

Endress+Hauser Liquipoint FTW 31 manual

Comtrend Corporation ES-7201PoE user manual

Comtrend Corporation

Comtrend Corporation ES-7201PoE user manual

Leonton PG2-1802-SFP Series user manual

Leonton

Leonton PG2-1802-SFP Series user manual

NETGEAR GSM7248 - ProSafe Switch operating instructions

NETGEAR

NETGEAR GSM7248 - ProSafe Switch operating instructions

MiLAN MIL-S800 user guide

MiLAN

MiLAN MIL-S800 user guide

Cisco SR224R datasheet

Cisco

Cisco SR224R datasheet

Renkforce RF-UH-A10 operating instructions

Renkforce

Renkforce RF-UH-A10 operating instructions

Cisco 2960-48TC - Catalyst Switch datasheet

Cisco

Cisco 2960-48TC - Catalyst Switch datasheet

J-Tech Digital JTECH-VWM90 user manual

J-Tech Digital

J-Tech Digital JTECH-VWM90 user manual

Festo SMT-8M-A-...-24V-E Series Translation of the original instructions

Festo

Festo SMT-8M-A-...-24V-E Series Translation of the original instructions

Pulsar ISFG64 manual

Pulsar

Pulsar ISFG64 manual

Allied Telesis Switchblade AT-x908 datasheet

Allied Telesis

Allied Telesis Switchblade AT-x908 datasheet

QSFPTEK S5300-48T4X quick start guide

QSFPTEK

QSFPTEK S5300-48T4X quick start guide

D-Link DGS-1216T - Switch Quick installation guid

D-Link

D-Link DGS-1216T - Switch Quick installation guid

SMC Networks TigerSwitch SMC8028L2 Specifications

SMC Networks

SMC Networks TigerSwitch SMC8028L2 Specifications

Blackmagicdesigngi Videohub Master Control Installation and operation manual

Blackmagicdesigngi

Blackmagicdesigngi Videohub Master Control Installation and operation manual

Juniper EX Series user guide

Juniper

Juniper EX Series user guide

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.