Content
1. Operating instructions for users and contractors 2
2. Installation instructions for the installer 4
Customer service and warranty | Environment and recycling 10
1. Operating instructions for Users and Technicians
!Stiebel Eltron hot water heaters should only be installed by
licensed installers. These are not do-it yourself appliances.
Please hand this Operating and Installation Manual and hand over to
the home or buildings owner when the installation is completed.
1.1 Start-up
The solar collectors, the boiler, the tank, and the pumping/control
station form a complete system.
Hot water is generated throughout the year by the solar collectors.
The entire heater and hot water system must be filled with water and
have adaquate air ventilation. Please, refer to the solar collector’s and
the boiler’s installation instructions.
1.2 Maintenance and Cleaning
Routine care and maintenance extends the life expectancy and
operating safety of the hot water storage unit.
The outer casing should be cleaned with a slightly damp cloth and
commercially available neutral cleaning agent, this should be done on a
regular basis
T&P valve
The proper function of the T&P valve is required to prevent damage to
the hot water storage unit. The T&P valve needs to be open during cold-
water addition. The water has to flow from the relief line at full stream.
!The discharging water can be hot.
» Regularly vent the safety valve on the safety assembly until a full
water jet is discharged.
» Close the safety valve when the check is complete.
» Check the T&P valve for tightness.
Decalcification
With hard tap water, a deposit of scale will form on the inside of the
storage unit. Based on professional experience, it is necessary to decal-
cify with commercially available solvents at timely intervals. Follow the
manufacturers instructions for solvent use. The hot water storage unit
needs to be emptied. The inspection cover must be removed and sedi-
ments on the tank bottom must be flushed.
Replacement of the Sacrificial Anode
Depending on the composition of the tap water, an inspection of the
sacrificial anode (Pos. 1, Diagram A) timely intervals is recommended.
The sacrificial anode turns red when the anode has been spent. Please
notify your local contractor who will replace the anode.
With heavy wear, an original equipment replacement anode must be
installed to protect the inner container from corrosion. An inspection
should be performed at least once a year.
1.3 Failures – Causes – Correction
Failures Causes Correction
Inadequate water pressure Shut-off valve is not completely open.. Open Shut-off valve.
Cold or hot water line is obstructed. Clean or exchange pipes
Hot water flow inadequate Boiler temperature is set too low.
Recommended 80 - 85 °C
Set boiler to recommended temperature.
The heat exchanger is calcified. Clean the heat exchanger
Hot water storage tank not being heated Program selection at the heater control is
not properly selected.
Select and set program per instructions.
Outlet quantity Aerator at the extraction point blocked. Unscrew aerator and clean.
Hot water supply too fast exhausted Flow rate too high.
Recommended 10 - 15 l/min
Restrict Spigot valve rate.