
© stilum GmbH, Gewerbegebiet Larsheck, 56271 Kleinmaischeid • Tel. +49 (0) 2689 92790-0 • All rights and product modications reserved.
Mounting instructions for springrider „papilio3“
Item No. 51 3016 401
State: 15.06.2016 p. 2
Diagram 2: Side view with dimension details „papilio3“
Play level
Floor anchor
Concrete foundation
1. Select the play equipment location in consideration of the required safety area
(see Diagram 3: Ø 5300mm).
2. The impact area of a playground equipment with an enforced movement is not
allowed to overlap the impact area of other equipment.
Regarding to DIN 1176 - 4.2.8.2.5, impact absorbing surfaces have to be put
under the whole impact area of every equipment with an enforced movement.
3. Carry out excavation work for the foundation anchor as shown in Diagram 2.
After excavation, compress the foundation oor.
Note: The springrider is built in on the play level. Pay attention to items
marked „game level“ of play equipment!
4. Concrete foundation acc. the specied dimensions (LxBxH 1000 x 1000 x 500
mm) build with centrally mounted, horizontal reinforcement. It shed the sup-
plied anchor bolts with the foundation that the upper angle frame is horizontal
and ush with the foundation surface.
5. During the setting time of 10-14 days, depending on weather conditions and
foundation size, lock the play equipment.
6. After the setting period clean the surface of the foundation, place the pre-
mounted play equipment onto it and screw the base plate of the play equip-
ment onto the foundation anchor.
Reinforcement plan: Concrete foundation with rein-
forcement
Main foundation: BSt 500S
Ever 4 stirrups Ø 8 mm lengthwise and cross
Concrete cover h´= 3 cm
Concrete quality class B25
500
1000
440
516
910
Fundamentplan
Beton
Concrete
Erde/Grund
Ground
Füllmaterial
Filling
0061-00-00
papilio3
Rev.:
Projekt:
BESTELL-NR:
ZG-NR:
BENENNUNG:
OHNE SCHRIFTLICHE ZUSTIMMUNG DER CONRADI + KAISER GMBH DARF DIESE TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT
NOCH DRITTEN MITGETEILT ODER ZUGÄNGLICH GEMACHT WERDEN NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VERWENDET
WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
FREIG:
GEPR:
GEZ:
DATUM: NAME:
WERKSTOFF
MAßSTAB:
OBERFLAECHEN NACH
DIN ISO 1302 REIHE 2
ZUL. ABWEICHUNG
DIN 2768 - mH
+0,3
-0,3
WERKSTUECKKANTEN
NACH DIN 6784
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
A3
04.02.2016
Abmaße:
Fertigung:
Behnke
x
Gewicht:
500
1000
440
516
910
Fundamentplan
Beton
Concrete
Erde/Grund
Ground
Füllmaterial
Filling
0061-00-00
papilio3
Rev.:
Projekt:
BESTELL-NR:
ZG-NR:
BENENNUNG:
OHNE SCHRIFTLICHE ZUSTIMMUNG DER CONRADI + KAISER GMBH DARF DIESE TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT
NOCH DRITTEN MITGETEILT ODER ZUGÄNGLICH GEMACHT WERDEN NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VERWENDET
WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
FREIG:
GEPR:
GEZ:
DATUM: NAME:
WERKSTOFF
MAßSTAB:
OBERFLAECHEN NACH
DIN ISO 1302 REIHE 2
ZUL. ABWEICHUNG
DIN 2768 - mH
+0,3
-0,3
WERKSTUECKKANTEN
NACH DIN 6784
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
A3
04.02.2016
Abmaße:
Fertigung:
Behnke
x
Gewicht: