Additional pull up bar
Installation guide
Foundations
The stability of your Gym relies on correct installation of the posts.
We recommend a minimum depth of 600mm. Ensure the concrete
is fully hardened before use (2-3 days) and the hole is suitable for
the ground conditions and planned usage. We also recommend
using a small amount of pea shingle at the base of the post to aid
drainage.
Maintenance
All of our materials are maintenance free, the posts are supplied
with a tanalised finish and 10 year life expectancy. It is essential to
check the bolts and fixings on a monthly basis and tighten where
necessary as they can loosen off as the timber goes through the
natural drying process.
Train Safe!
1.Always consult your doctor before undertaking any physical exercise.
2.Injuries to health may result from excessive, incorrect training or using
the equipment in a way that it is not designed for.
3.Remove jewellery, watches or anything else that may catch or snag
before exercising.
4.Always warm up prior to exercising, if you are unsure consult a health
professional for advice.
5.Children should not be allowed to use the equipment without the
strict supervision of adults who are aware of how to exercise correctly.
6.Our products have been designed to carry out exercise and are not
meant as a climbing frame or piece of play equipment. The user is
wholly responsible for any accidents or injuries occurring from usage of
the equipment regardless of proper or improper usage.
7.The Garden Gym ltd disclaims all liability from the mis-use or incorrect
installation of our products.
8.The user must not adapt, amend or remove any part of the
equipment.