
ITEM QTY PART NUMBER DESCRIPTION
1 1 666U UPRIGHT
2 1 666R 666 OUTRIGGER
3 1 VARIOUS BACKBOARD PER ORDER
4 1 666-1A 666 MOUNTING PLATE
5 2 SR5370 850RB-BB MOUNTING TAB
6 2 660-BR 1.315 DIA BACKBOARD BRACE
7 1 EC0061 6" x 6" PLASTIC END CAP
8 1 UBG-500 ULTIMATE PLAYGROUND BASKETBALL GOAL
9 1 JNY-6HP BRAIDED NYLON BASKETBALL NET 1/2 PR
ITEM QTY PART NUMBER DESCRIPTION
10 2 HB5031 3/8-16 x 1-1/2 CARRIAGE BOLT-ZP
11 6 HS5061 3/4-10 x 8 HEX CAP SCREW-ZP-Gr5
12 3 HS287 3/8-16 x 1-1/4 HEX CAP SCREW-ZP-GrNC
13 12 HW343 3/4 SAE WASHER-ZP-GrNC
14 5 HW334 3/8 LOCK WASHER-ZP-GrNC
15 7 HW2050 3/8 STD WASHER-ZP-GrNC
16 5 HN264 3/8 - 16 Hex Nut - ZP - GrNC
17 2 HN5040 3/8"-16 SLAB BASE TEE NUT, SS
18 6 HN5019 3/4-10 STOVER LOCKNUT ZINC PLATE
2 OF 5
PAGE
MODEL 660/770 SQUARE POST OUTDOOR BASKETBALL
ASSEMBLY INSTRUCTIONS
BEFORE YOU START
A) UNPACK ALL PARTS AND CHECK AGAINST PARTS LIST TO ENSURE THAT ALL PARTS HAVE BEEN INCLUDED
B) INSPECT FOR DAMAGE. REPORT ALL DAMAGES TO TRUCKING COMPANY.
UPRIGHT INSTALLATION
1) CHECK LOCAL BUILDING CODES BEFORE STARTING THE FOOTING, AS BUILDING CODES MAY VARY. LOCAL
BUILDING CODES SHOULD BE ADHEARED TO IF REQUIRENENTS ARE GREATER THAN THOSE OUTLINED HERE.
2) DIG HOLE 36 INCHES SQUARE OR ROUND TO A DEPTH ON 56 INCHES, POUR AN 8 INCH FOOTING AND
ALLOW TO FULLY CURE OR PLACE UPRIGHT ON TWO 8 INCH CONCRETE BLOCKS.
3) INSTALL SQUARE CAP TO TOP OF POST WITH RUBBER MALLET. (BEFORE RAISING ONTO FOOTING)
4) POSITION AND SQUARE THE UPRIGHT ONTO THE FOOTING BASE. POUR THE REMAINDER OF THE FOOTING.
ALLOW THE CONCRETE TO FULLY CURE, PER THE MANUFACTURER'S INSTRUCTIONS, BEFORE ATTACHING
OUTRIGGER AND BACKBOARD.
FINAL ASSEMBLY
5) ATTACH OUTRIGGER TO UPRIGHT USING 3/4"-10 HARDWARE PROVIDED (SEE DETAIL A). IF NEEDED, THE
OUTRIGGER MAY BE LEVELED BY PLACING ALUMINUM FLASHING BEHIND THE MOUNTING PLATE LOCATED
TOWARDS THE BOTTOM.
NOTE THE TOP HOLE OF THE BACKPOARD MOUNTING PLATE SHOULD BE 119 INCHES OFF THE PLAYING
SURFACE.
6)ATTACH THE APPROPRIATE BRACE MOUNTING BRACKET TO THE BACK OF THE BACKBOARD, AS SHOWN IN
DETAIL E. THE BRACKET WILL DEPEND ON THE BACKBOARD ORDERED. THE BRACKETS WILL EITHER BE
INCLUDED WITH THE BACKBOARD OR FOUND IN THE GENERAL KIT. THE SPACING BETWEEN THE RIGHT
ANGLE BRACKETS OF THE RECTANGULAR STEEL BACKBOARD IS APPROXMATLY 36 INCHES.
7) LIFT AND ATTACH THE BACKBOARD TO THE OUTRIGGER USING ONLY THE TOP TWO FASTENERS AND TEE
NUTS SHOWN IN SECTION B-B. WHEN THE BACKBOARD IS INSTALLED THE TEE NUTS SHOULD BE UP AGAINST
THE BACKBOARD AS SHOWN IN SEE DETAIL C. THE USE OF THE TEE NUTS ALLOW FOR EASY REPLACEMENT
OF THE GOAL.
8) INSTALL THE 1 5/16" DIA SUPPORT BRACES TO THE BACKBOARD AND OUTRIGGER AS SHOWN IN DETAILS F
AND G. PLUMB AND LEVEL THE BACKBOARD BEFORE TIGHTENING THE HARDWARE.
9)FINALLY ATTACH THE GOAL WITH THE REMAINING HARDWARE SHOWN IN SECTION B-B,MAKE CERTAIN
THAT A WASHER IS PLACED BETWEEN THE BOARD AND THE GOAL IN THE LOWER TWO HOLES IN ORDER TO
KEEP THE GOAL PERPENDICULAR WITH THE BACKBOARD. NOTE THE ORIENTATION OF THE LOWER TWO
BOLTS. FOR ADDED SAFETY, THE EXPOSED THREADS AND NUTS SHOULD BE PLACED ON THE BACKSIDE OF
THE BACKBOARD, AS SHOWN IN DETAIL D.
TOOLS REQUIRED:
1 1/8" Socket Wrench and Combination Wrench
9/16" Socket Wrench and Combination Wrench
Rubber Mallet