manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Utility Solutions
  6. •
  7. Industrial Electrical
  8. •
  9. Utility Solutions BREAK-SAFE USBS-15-1-PS Installation instructions

Utility Solutions BREAK-SAFE USBS-15-1-PS Installation instructions

Other manuals for BREAK-SAFE USBS-15-1-PS

4

This manual suits for next models

5

Popular Industrial Electrical manuals by other brands

Murata GRM0335C1E3R9BA01 Series Reference sheet

Murata

Murata GRM0335C1E3R9BA01 Series Reference sheet

ARCAIR N6000 Automatic System Safety and operating instructions

ARCAIR

ARCAIR N6000 Automatic System Safety and operating instructions

Murata GRM31CR61E106MA12 Series Reference sheet

Murata

Murata GRM31CR61E106MA12 Series Reference sheet

Murata GQM2195C2A9R1CB01 Series Reference sheet

Murata

Murata GQM2195C2A9R1CB01 Series Reference sheet

MFJ MFJ-918 quick start guide

MFJ

MFJ MFJ-918 quick start guide

Abtech HVJB Series Installation, operation & maintenance instructions

Abtech

Abtech HVJB Series Installation, operation & maintenance instructions

Murata GRM0335C1H8R1DA01 Series Reference sheet

Murata

Murata GRM0335C1H8R1DA01 Series Reference sheet

SAF-HOLLAND CBX 5415.5 Installation and operation manual

SAF-HOLLAND

SAF-HOLLAND CBX 5415.5 Installation and operation manual

Eaton Ulusoy HMH24-04 user manual

Eaton

Eaton Ulusoy HMH24-04 user manual

Murata GJM0335C1E4R4BB01 Series Reference sheet

Murata

Murata GJM0335C1E4R4BB01 Series Reference sheet

Newlong NP-7H NSTRUCTION MANUAL/PARTS LIST

Newlong

Newlong NP-7H NSTRUCTION MANUAL/PARTS LIST

Stahl 8575/12 operating instructions

Stahl

Stahl 8575/12 operating instructions

SI Pegasus installation instructions

SI

SI Pegasus installation instructions

Murata GRM1555C1H2R7CA01 Seies Reference sheet

Murata

Murata GRM1555C1H2R7CA01 Seies Reference sheet

Murata GRM0225C1E6R4BA03 Series Reference sheet

Murata

Murata GRM0225C1E6R4BA03 Series Reference sheet

Cooper Power Systems VXE15 Installation and operation instructions

Cooper Power Systems

Cooper Power Systems VXE15 Installation and operation instructions

S&C Vista SD manual

S&C

S&C Vista SD manual

Murata GRM0335C2A7R3CA01 Series Reference sheet

Murata

Murata GRM0335C2A7R3CA01 Series Reference sheet

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.

Phone (828)323-8914
Fax (828)323-8410
Email [email protected]
Web www.utilitysolutionsinc.com
101 33rd Street Drive SE · Hickory, NC 28602
B-01032
USBS
Field Inspection (11-9-15)
Copyright © 2015 Utility Solutions, Inc.
FIELD INSPECTION PROCEDURE
BREAK-SAFE
®
Load Break & Pick-up Tool
USBS-15-1-PS
USBS-15-2-PS
USBS-27-1-PS
USBS-27-2-PS
USBS-46-1-PS
USBS-46-2-PS
Follow the steps below before EACH use of the BREAK-SAFE®.This procedure does NOT replace or
eliminate the periodic maintenance that is recommended every 2 years.
Visually inspect the tool. If any of the following are found,
remove the tool from the eld and perform service:
• Soot or Dirt buildup on
components
• Damage to contacts
• Cracks of 1/4” or more on
outer tube
• Damaged Load Break Ring.
Ring should rotate freely
(shaft should NOT rotate)
• Damaged or discolored
Yellow Tube
• Damaged Conductor Hook
or Duckbill
• Loose Conductor Bar
• Damaged Safety Lock
• Out of Date Maintenance
Decal (service should be
performed within 2 years of
date shown)
1.
A) With the tool in the CLOSED position, use a voltmeter, conrm
continuity exists between the Conductor Bar and the Conductor
Hook.
B) Conrm continuity exists while pulling the Load Break Ring
toward the open position. Continuity should exist until the load
break mechanism is engaged and the tool locks in the open
position.
C) Conrm NO continuity exists between the Conductor Bar and
the Conductor Hook when the tool is in the fully opened positioned.
3.
! !
WARNING
Carefully read and fully understand the manual prior to
operating, maintaining or testing this device. Improper
operation, handling or maintenance of this device can result
in death, grievous personal injury and or equipment damage.
Exert a steady downward movement
on the Load Pick-up Trigger (D). The
Load Break Ring Assembly should
retract forcefully into the Clear Tube
Assembly. The tool should operate
rmly and smoothly.
With the tool in the Lock Close
position, conrm the Brass
Contacts are fully seated (E). The
Brass Contacts will t inside one
another so the ngers of the top
Brass Contact are touching the lip
of the lower Brass Contact.
The Brass Contacts should remain seated with the tool in
the CLOSED position (F). Push the Load Break Ring up and
into the tool to ensure the Brass Contacts are fully seated. The
tool will require service and should NOT be used if the Brass
Contacts cannot be fully seated.
VISUAL INSPECTION
CONTINUITY
RESET TOOL
0.25
A
Ω
---
C
Ω
0.25
B
The BREAK-SAFE® will only reset when the Brass
Contacts are fully seated.
Fully Seated
E
The Brass Contacts do not carry the load during Load
Break operation. The current path will exist inside the
tool until the load break mechanism is triggered.
2.
D
Brass Contacts
F
PATENT NO. 6,078,008 Other Patents Pending
Phone (828)323-8914
Fax (828)323-8410
Email [email protected]
Web www.utilitysolutionsinc.com
101 33rd Street Drive SE · Hickory, NC 28602
B-01032
USBS
Field Inspection (11-9-15)
Copyright © 2015 Utility Solutions, Inc.
UNLOCKED
LOCK
CLOSE
LOCK
OPEN
CLOSE
OPEN
FIELD INSPECTION PROCEDURE
BREAK-SAFE®Load Break & Pick-up Tool
! !
DANGER
eSafetyLockdoesnotRESETthetool.RefertoInspectionProcedureonreversesideand
theOperationManualforcompleteinstructionsonproperlyresettingtheBREAK-SAFE™.
LOCKED
Conductor
Hook
Load Pick-up Trigger
(located under Lock)
Conductor Bar
Load Break Ring
(should rotate freely)
Internal
Yellow Tube
Yellow
Safety
Lock
Brass
Contacts
Floating Head Duckbill Head
! !
WARNING
Always remove the BREAK-SAFE®from the circuit, or remove the jumper attached to
the parking stand, aer each load break operation.
e BREAK-SAFE®is not rated insulation nor is it considered a “visible gap”.