
Contents
2Installation and maintenance instructions ecoTEC plus 937 0020031552_06
Contents
1 Notes on the documentation................................4
1.1 Documents also having validity..............................4
1.2 Storing documents.....................................................4
1.3 Symbols used...............................................................4
1.4 Validity of the manual...............................................4
1.5 Identification plates ...................................................4
1.6 CE label .........................................................................4
1.7 Benchmark ...................................................................5
1.8 Gas Council Number ..................................................5
2 Unit description, data and dimensions .............5
2.1 General notes ..............................................................5
2.2 Technical data .............................................................6
2.3 Dimensions...................................................................7
2.4 Structure and functional elements........................9
2.5 Functional description............................................. 10
3 Safety ...........................................................................11
3.1 Safety and warning information.............................11
3.1.1 Classification of warnings ........................................11
3.1.2 Structure of warnings ...............................................11
3.2 Intended use ................................................................11
3.3 General safety instructions.....................................12
3.4 General requirements...............................................13
3.4.1 Preliminary remarks .................................................13
3.4.2 Related documents ...................................................13
4 General requirements.............................................14
4.1 Scope of supply and accessories...........................14
4.2 Installation location...................................................14
4.3 Gas supply ...................................................................15
4.4 Flue pipe.......................................................................15
4.4.1 100 mm standard flue duct.....................................15
4.4.2 Optional 125 mm flue pipe.......................................16
4.5 Flue termination ........................................................16
4.6 Air supply.....................................................................17
4.7 Electrical connection ................................................17
4.8 System requirements ...............................................18
4.8.1 Water circulation system.........................................18
4.8.2 Filling and preparation of the heating system...18
4.8.3 Pressure relief valve.................................................19
4.8.4 Pressure gauge ..........................................................19
4.8.5 Heating circuit expansion vessel...........................19
4.8.6 Shift load storage tank expansion vessel.......... 20
4.9 Details for the pumps............................................. 20
4.9.1 Circulation pump ..................................................... 20
4.9.2 Shift load storage tank circulation pump.......... 20
4.10 System-Bypass......................................................... 20
4.11 Venting....................................................................... 20
4.12 Condensate siphon.................................................. 20
5 Sequence of operations during installation....21
5.1 Transporting the appliance.....................................21
5.2 Required minimum gaps/assembly clearances 23
5.2.1 Selecting the location for the shift load
storage tank and combination boiler ..................23
5.3 Unpacking the equipment ......................................23
5.4 Using the installation template............................ 24
5.5 Flue exit...................................................................... 24
5.6 Installation of the flue gas system...................... 24
5.7 Fitting the appliance hanging bracket ................25
5.8 Mounting the combination boiler .........................25
5.9 Removing the front case........................................26
5.10 General instructions concerning the heating
system .........................................................................26
5.11 Gas connection..........................................................26
5.12 Connecting the hot and cold water .....................27
5.13 Connecting piping between the stratified
storage tank and the combi-heater.................... 28
5.14 Connecting the heating supply and return
lines..............................................................................29
5.15 Installing the condensate drain line.................... 30
5.16 Connecting the drain pipe to the pressure
relief valve...................................................................31
5.17 Connecting the drain hose to the pressure
relief valve of the stratified storage tank...........31
5.18 Connecting the exhaust gas system to the
combi-heater...............................................................31
5.19 Electrical connection ...............................................32
5.19.1 General requirements..............................................32
5.19.2 Establishing the electrical connection for the
stratified storage tank ............................................32
5.19.3 Establishing the power supply ..............................33
5.19.4 Connection diagrams................................................................34
5.20 Control units ..............................................................37
5.20.1 Vaillant control units and accessories................37
5.20.2 External electrical controllers...............................37
5.20.3 Details for the connection of an external
timer to the terminal strip .....................................37
5.20.4 Optional plug-in timers by Vaillant ..................... 38
5.21 Thermostatic radiator valves ............................... 38
5.22 Frost prevention ...................................................... 38
5.23 Heating pump ........................................................... 38
5.24 Anti-cyclic "Economiser" control system.......... 38
5.25 Automatic pump spin control............................... 38
6 Commissioning, Part I...........................................39
6.1 Preparatory checks of the electrical system ....39
6.2 Gas supply ..................................................................39
6.3 Cold water supply.....................................................39
6.4 Filling and bleeding the heating system.............39
6.4.1 Checking the fill pressure in the heating
system .........................................................................39
6.4.2 Filling device for ecoTEC plus 937......................40
6.4.3 Filling the heating system for the first time..... 40