TAURUS-AU
Zero Clearance
Installation Manual
380mm
790mm
500mm
Zero Clearance Casing Dimensions
1170mm
1050mm
1100mm
790mm
380mm
130mm
560mm
100mm
1300mm
1230mm
1470mm
300mm
100mm 100mm
Timber framing guide
Front Elevation
Frame Opening of 1300mm wide x 1470mm high x 550mm deep
Floor Protection Requirements
The unit must be installed on a 6mm thick compressed board, minimum oor protection
required below the unit is 550mm deep x 1240mm wide x 6mm thick. The oor protection
must also project out in front of the unit 300mm x 1230mm wide with the unit positioned
centered on the oor protection right and left and 50mm forward from the back edge.
Minimum 9mm CFC
sheeting or similar
non-combustible material
Timber framing guide
Side Elevation
50mm rear wall clearance required from combustible materials
300mm clearance above & 100mm either side replace to combustible materials
Please Note - Light coloured wall paints may discolour over time due to heat
darker colours are recommended if the replace wall is to be a painted nish
Fix wall cladding to header
and studs above the unit
do not x or glue wall
sheeting to replace
300mm clearance
required from unit to header
No combustible materials
permitted in this area
Minimum 6mm CFC
sheeting or similar
50mm Clearance 300mm Projection
Fix wall sheeting off
to timber studs & header
No xings on this area
allow wall sheeting to oat
for thermal expansion
Self tappers & Selleys 401 RTV or similar
can be used to secure wall cladding
to the lower unit casing / framework
Return trim to
cover cut edge
Prefered location
for sheeting joint
Avoid joing sheets
in upper corners
Timber framing guide
Wall nishing
Wall Cladding to be minimum 9mm CFC sheeting or similar non-combustible material
300mm clearance above & 100mm either side replace to combustible materials
Please Note - Light coloured painted wall nishes may discolour due to heat
darker colours recommended if a painted nished is required
Zero Clearance Casing
Assembly
Included items
Base:
Long Rails (1100mm) x 4
Medium Rails (500mm) x 4
Short Rails (375mm) x 4
Casing:
Top Panel x 1
B
Bottom Panel x 1
Side Panels x 2
Rear Panel x 1
Center Support Bracing x 1
Rear Stand-off Bracket x 1
Firebox Support Brackets x 2
Zero Clearance Casing
Assembly
Constructing the base stand
Step 1.
Take 2 of the short rails (375mm) and 2 of the medium rails (500mm) align
the holes and secure with self tapping screws to create an end frame. The
medium length rails face the outside with the short rails being xed to the
back of the medium rails.
Once you have completed the rst end frame, repeat the above steps to
complete the nal end panel.
Zero Clearance Casing
Assembly
Constructing the base stand
Step 2.
In order to complete the base, join the long rails (1100mm) to each corner of
the nished end frames, align the screw holes and x with self tapping screws.
Once you have completed the top two rails, turn the frame over and repeat
the process for the lower long rails to complete the base.
Zero Clearance Casing
Assembly
Building on from base
Step 3.
Locate the base panel and secure the center support as well as both heater
support rails to the base panel using self tapping screws. Secure base panel to
base frame using self tapping screws
locate and secure the side panels to the base panels with self tapping screws
ensuring the side panels are inside the base panel folds.
Zero Clearance Casing
Assembly
Building the casing
Step 4.
Slide the back panel into place, the back panel will sit inside the base panel
fold and on the outside of the side panels. Once in place, secure loosly until
the top panel has been tted to allow for adjustment.
Secure rear wall spacer to the back panel in the pre-drilled holes
Zero Clearance Casing
Assembly
Building the casing
Step 5.
Position top panel in place and align holes as required, tighten back panel
screws then remove the top panel to be tted off at a later stage once the
rebox has been positioned inside the casing.
Step 6.
There are several tabs located on the lower rails which secure the base to the
casing to provide dditional support, Fold tabs up 180 degrees and secure to
the casing with self tapping screws.
Zero Clearance Casing
Assembly
Inserting the rebox
Step 5.
Position the zero clearance assembly inside the wall cavity, once the casing is
positioned check level and ensuring positioning is ush with the wall framing.
Secure to the lower rails to the oor using appropriate xing methods for the
ooring material. Before preparing to insert rebox into the zero clearance
casing, please ensure both heat exchange vents are capped as pictured below.
Step 6.
Position the rebox inside the zero clearance casing, due to the weight of
the rebox (220kg), mechanical lifting aids are highly recommended. Leaving
the top panel off allows for the use of mechanical lifting aids to help position
the rebox inside the casing / wall cavity. Applying grease or similar to the
lower support brackets will aid in sliding the rebox into the casing.
Ensure both outlets are capped
Zero Clearance Casing
Assembly
Flue assembly
Step 7.
Once the rebox is positioned inside the zero clearance casing, t the top panel
on the casing and secure with self tapping screws.
Step 8.
The ue requires stand-off brackets which are included with the kit, position
the standoff brackets as pictured below. The brackets are secured to the 10”
ue pipe using self tapping screws or rivets. The 8” ue pipe and brackets
pass through the casing and rest on the top of the rebox, The brackets will
stand the 8” ue pipe off the top of the rebox.
Secure here with
self tapping screws
Zero Clearance Casing
Assembly
Flue assembly
Step 9.
Position the 10” ue pipe over both the 8” ue pipe and brackets. The 10” ue
pipe will rest on the second tier of stand-off brackets as pictured below. The
10” ue can be secured to the brackets using self tapping screws or rivets.
Zero Clearance Casing
Assembly
Flue assembly
Second step in bracket
stands off 10” ue pipe
Use heat resistant sealant
to seal 8” ue pipe to casing
Step 10.
Once the 10” and 8” ues are secured together using self-tapping screws or
rivets, position the ue pipes on top of the zero clearance casing and lower
into position. The brackets will locate the ue correctly, the rst step of the
bracket will stand the ue off from the rebox. Using a suitable heat resistant
sealant, seal the 8” ue pipe to the zero clearance casing as marked below in
blu
blue. The second step on the ue bracket will stand the 10” ue pipe off the
zero clearance casing as shown below.
Zero Clearance Casing
Assembly
Finishing the install
Step 11.
Once the ue has been positioned and sealed to the top of the zero clearance
casing, lower the 6” Stainless ue pipe down inside the 8” ue pipe and seat
fully on the top of the replace ue spigot. Continue to run the three layers of
ue in accordance with AS/NZS 2918.2018.
Step 12.
Clad the replace wall using a suitable non-combustible rated cladding
material and enjoy your new VisionLINE Taurus replace.
Please Note - Fireplace pictured with optional heat transfer kit

Other visionLINE Indoor Fireplace manuals

visionLINE VL-45B User manual

visionLINE

visionLINE VL-45B User manual

visionLINE TAURUS - AU Installation instructions

visionLINE

visionLINE TAURUS - AU Installation instructions

visionLINE VL-VESTA-50 User manual

visionLINE

visionLINE VL-VESTA-50 User manual

visionLINE Circle Installation instructions

visionLINE

visionLINE Circle Installation instructions

visionLINE TAURUS-AU Installation instructions

visionLINE

visionLINE TAURUS-AU Installation instructions

visionLINE BG-36B User manual

visionLINE

visionLINE BG-36B User manual

visionLINE VL-24 User manual

visionLINE

visionLINE VL-24 User manual

Popular Indoor Fireplace manuals by other brands

Monessen Hearth Vent Free Firebox GCUF36C-F Product specifications

Monessen Hearth

Monessen Hearth Vent Free Firebox GCUF36C-F Product specifications

Febo Flame 17IN-42-118 user manual

Febo Flame

Febo Flame 17IN-42-118 user manual

WANDERS Smart 60 User guide and installation manual

WANDERS

WANDERS Smart 60 User guide and installation manual

Desa CWC42C installation instructions

Desa

Desa CWC42C installation instructions

Enviro C-11275 owner's manual

Enviro

Enviro C-11275 owner's manual

Nibe Contura C690G manual

Nibe

Nibe Contura C690G manual

Dimplex IN-STUD V1525BT Practical user's guide

Dimplex

Dimplex IN-STUD V1525BT Practical user's guide

Lennox RHAP54N installation instructions

Lennox

Lennox RHAP54N installation instructions

Enviro Berkeley-IPI owner's manual

Enviro

Enviro Berkeley-IPI owner's manual

Hanover CAM14FSFP-1BLK instructions

Hanover

Hanover CAM14FSFP-1BLK instructions

Nordpeis N-36A Exclusive user manual

Nordpeis

Nordpeis N-36A Exclusive user manual

Superior SLBV 35 Care and operation instructions

Superior

Superior SLBV 35 Care and operation instructions

Element4 Lucius 140 Room Divider installation manual

Element4

Element4 Lucius 140 Room Divider installation manual

Vermont Castings Intrepid II 1308 owner's guide

Vermont Castings

Vermont Castings Intrepid II 1308 owner's guide

Bayside Furnishings EF22-33B operating manual

Bayside Furnishings

Bayside Furnishings EF22-33B operating manual

Napoleon PARK AVENUE GD82NT Installation and operation instructions

Napoleon

Napoleon PARK AVENUE GD82NT Installation and operation instructions

Escea EF5000 installation guide

Escea

Escea EF5000 installation guide

livin flame Berlijn Assembly instructions and operating manual

livin flame

livin flame Berlijn Assembly instructions and operating manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.