P 1
03LBRO1208-V7
12x8 COMBI SUMMERHOUSE V7
2mm Drill bit
x2 Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
All building’s should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
CAUTION
Every eort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
**Protim Aquatan T5 (621)**
Your building has been treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct
application of Aquatan solution and then allowed to dry.
Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels and
garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl
sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
Please retain product label and instructions for future reference
General Instructions
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied)
including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm
bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be aected during various weather conditions.
For the duration of heavy or extended periods of rain, swelling of the wood panels may
occur. Warping of the wood may also occur during excessive dry spells due to an interior
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is
suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
Our buildings are pre treated with a water based treatment**; this only helps to protect
the product during transit and for upto 3 months against mould. To validate your
guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated
with a wood preserver within the rst three months of assembly and thereafter in
accordance with the manufactures recommendations. Care must be taken to ensure
the product is placed on a suitable base.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to
diagrams for the base dimensions, The base should be slightly smaller than the external
measurement of the building, i.e. The cladding should overlap the base, creating a run
o for water. It is also recommended that the oor be at least 25mm above the
surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in
the case of childrens products independently tested to EN71 level, we cannot accept
responsibility for your safety whilst erecting or using this product.
Refer to the instructions pages for you specic product code
P 2
2345
1
6 7 8910
11 12 13 14 15
16 17 18
20
19
21
Door Panel Back Panel
Short Panel
Short Window
Panel
AI-03LBRO1208-V7DP
Internal Panel
AI-03LBRO1208-V7BP
AI-03LBRO1208-V7SP
AI-03LBRO1208-V7SWP
AI-03LBRO1208-V7INP
Floor
Roof
Front Window
Panel
Storage Door
Panel
Side Panel
AI-03LBRO1208-V7F
AI-03LBRO1208-V7R
AI-03LBRO1208-V7FWP
AI-03LBRO1208-V7STD
AI-03LBRO1208-V7SP
QTY x2
QTY x2
Double Boarded Gable Top
Gable Top Right
Gable Top Left
AI-03LBRO1208-V7GTDB
AI-03LBRO1208-V7GTR
AI-03LBRO1208-V7GTL
Storage Gable
Left
Storage Gable
Right
AI-03LBRO1208-V7SGL AI-03LBRO1208-V7SGR
Under Roof Veranda
Small Floor
AI-03LBRO1208-V7UR AI-03LBRO1208-V7V
AI-03LBRO1208-V7SF
QTY x2
Storage Door
Slave Door
Master Door
AI-03LBRO1208-V7MD AI-03LBRO1208-V7SD AI-03LBRO1208-V7SHD
QTY x2
22 30
29
28
27
26
25
24
23
5x Floor Blocks - 28x28x400mm
Cover Trim A - 12x56x1980mm
2x Cover Trim B - 12x56x2000mm
Cover Trim C - 12x56x2011mm
Cover Trim D - 12x56x2040mm
Cover Trim E - 12x56x2070mm
2x Cover Trim F - 12x56x2080mm
2x Front Fascia - 12x134x1903mm
4x Side Fascia - 12x134x1250mm
F2828-400mm
S12134-1557mm
Fixing Kit
Door Stop
32
34
Felt
35
2x Press Lock Base-
28x28x95mm
36
37 38
Press Lock
Chrome Handle
4x Barrel Bolt
Fixing Kit continues on P3
S12134-1903mm
S1256-1980mm
S1256-2000mm
S1256-2011mm
S1256-2040mm
S1256-2070mm
S1256-2080mm
PLY TRIANGLE
F2828-95mm
PI-07-0162
PI-07-0067
PI-07-0162
31
2x Door Trim - 16x60x1698mm
F1660-1698mm (rounded edge)
Panel Framing- 44x44x1910mm
33
F4444-1910mm
17b
Plain Door
AI-03LBRO1208-V7PD
03LBRO1208-V7
Overall Dimensions:
Width =2806mm
Depth = 2510mm
Height = 2146mm
Base Dimensions:
Width = 3688mm
Depth = 2439mm
Please retain product label and instructions for future reference
Before assembly
please make sure you have a
suitable base ready to erect your
building
MADE IN GREAT BRITAIN
P 3
39
2x Door Handles
PI-07-0001
Please retain product label and instructions for future reference
41
42
43
12x Butt Hinge
Key Plate
4x Turn Button
Fixing kit cont..
PI-07-0066
PI-07-0017
PI-07-0034
40
Mortice Lock
PI-07-0017
PI-02-0352
50mm Screw x 132
Felt Tacks x 199
30mm Screw x 168
10mm Screw x 8
30mm Black Screw x 4
70mm Screw x 13
Nail Bag
Pre Assembly
Before assembling remove the transportation
blocks from the bottom of each panel.
Step 1
Place the 2 oor panels (No. 13) onto a rm
and level base , ensuring the
base has suitable drainage & is free from
areas where standing water can collect.
Secure the oors together using the
Floor Blocks (No.22) and 10x30mm
screws per oor.
Once tted, turn the oor assembly the
right way up.
20x30mm Screws
Pre drill
hole
30mm
screw
13
13
22
14
Step 2
Flip the assembled Floor (No. 6) over and Place
the small oor (No. 14) ush against
the assembled oor.
Using 4x50mm screws x the small oor in
place as shown in the diagram.
4x50mm Screws
Pre drill
hole
50mm
screw
6
6
16 18
18
16 17 17b
16
Step 3a
Assembly of the main door and the
storage door.
Lay each door (No. 16, No. 17, No. 17b
and No. 18) at on a level surface, place a
hinge at the top, middle and bottom of
the door and x each hinge (No. 40) into
place using three 30mm screws, ensure
to pre-drill the holes rst. Position the
hinges as shown in the diagram (only
two doors have been shown in the
illustration) to ensure that they are in the
correct place before attaching the doors
to the door panel.
Place the door panels (No. 1 and No. 6)
at on the ground and the doors within
the aperture. Position the doors equally
within the space and then using 30mm
screws secure the doors in place.
72x30mm Screws
16
17 18
40
Pre drill
hole
30mm
screw
17b
*This building can be built with the shed on the LEFT hand side. Follow the
same steps but be aware to position panels to the opposite side.*
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Please retain product label and instructions for future reference
Step 3b
Fit the mortice lock (No. 42) into
the recess and x in place with the screws
provided. Fit the key plate(No. 39) to the
opposite door using the screws provided.
Fix door handles (No. 38) using 8x30mm
screws.
Fix the Door Cover Strips (No. 31) in
positionas shown then t barrel bolts
(No. 37) to top and bottom of the door
strips as shown in diagram. Use 4x10mm
screws per barrel bolt.
Ensure doors open and close freely.
10x30mm Screws
8x10mm Screws
40
42 The Mortice Lock is Reversible
39
38
Pre drill
hole
30mm
screw
10mm
screw
31
31
Step 6
Fix the side of one Back Panel (No. 5)
against the side of the other Back Panel
(No. 2) with 3x50mm screws as shown in
diagram.
Do not secure the building to the Floor
until the roof is tted.
3x50mm Screws
Pre drill
hole
50mm
screw
5
4
3
P 4
5
4
5
Step 4
Fix the side of the short panel (No. 4)
against the back of the back panel (No. 5)
with 3x50mm screws as shown in diagram.
Do not secure the building to the Floor
until the roof is tted.
3x50mm Screws
Pre drill
hole
50mm
screw
Step 5
Fix the side of the short panel (No. 4)
against the side of the short window panel
(No. 3) with 3x50mm screws as shown in
diagram.
Do not secure the building to the Floor
until the roof is tted.
3x50mm Screws
Pre drill
hole
50mm
screw
P 5
Please retain product label and instructions for future reference
Pre drill
hole
50mm
screw
Step 7
Before xing the internal panel in position,
x the Right Gable Top (No. 20) in place
slotting the groove of the boarding on the
gable into the tongue of the internal panel
(No. 8) as shown with 4x50mm screws.
Once the Gable top is positioned and xed,
x the Panel Framing (No. 32) to the side of
the Internal Panel (No. 8) as shown making
sure it is ush to the panel and framing as
shown with 3x50mm screws.
Do not secure the building to the Floor
until the roof is tted.
7x50mm Screws
32
20
8
Step 8
Fix the side of the Internal panel/Panel
Framing (No. 8/No. 32) against the back of
the Back Panel (No. 5). Allign the panel with
Storage Floor as shown and x externally
from the back with 3x50mm screws.
Do not secure the building to the Floor
until the roof is tted.
3x50mm Screws
Pre drill
hole
50mm
screw
8
20
32
5
Step 9
Fix the Left Gable Top (No. 21) in place
slotting the groove of the boarding on the
gable into the tongue of the side panels
(No. 3,No. 4) as shown with 4x50mm
screws.
4x50mm Screws
21
3
4
Step 10
Place the Door Panel (No. 1) onto a at
surface and x the Front Window
Panel (No. 2) in place as shown.
Make sure the panels are ush to
eachother.
3x70mm Screws
Pre drill
hole
50mm
screw
Pre drill
hole
70mm
screw
12
P 6
Please retain product label and instructions for future reference
Please retain product label and instructions for future reference
Pre drill
hole
70mm
screw
Step 11
Place the Door Panel/ Front Window
Panel (No. 1/No. 2) onto the
assembly between the Short Window Panel
(No. 3) and Internal Panel (No. 8). Fix with
3x70mm screws into the Internal panel and
3 x50mm screws into the Short Window Panel
as shown in diagram internally.
Do not secure the building to the Floor
until the roof is tted.
3x70mm Screws
3x50mm Screws
50mm
screw
Step 13
Fix the Double Boarded Gable Top (No. 19)
in place slotting the groove of the boarding
on the gable into the tongue of the Side
Panels (No. 7) as shown with 4x50mm
screws.
4x50mm Screws
7
5
19
7
Step 12
Fix the side of the Side Panel (No. 7)
against the back of the back panel (No. 5)
with 3x50mm screws as shown in diagram.
Do not secure the building to the Floor
until the roof is tted.
3x50mm Screws
Pre drill
hole
50mm
screw
Step 14
Place the Storage Gable Sides Left/Right
(No. 9/10) against the sides of the Internal
(No. 8) and Side Panel (No. 7) with the
boarding facing outwards as shown.
Fix with 3x50mm screws per
gable side as shown in diagram.
Do not secure the building to
the Floor until the roof is tted.
6x50mm Screws
Pre drill
hole
50mm
screw
Pre drill
hole
50mm
screw
Please retain product label and instructions for future reference
Step 15
Place the Assembled Storage Door panel
(No. 6) against the end of the Sorage
Gable Sides (No. 9/10) and x into postion
internally.
Fix with 3x50mm screws per side as
shown in diagram.
Do not secure the building to the Floor
until the roof is tted.
6x50mm Screws
Pre drill
hole
50mm
screw
Step 16
Place each Veranda (No. 15) ush to the
building as shown to make sure the building
is square.
Fix with 6x70mm screws per gable top as
shown in diagram. Make sure to not screw
into the doors.
6x70mm Screws
Pre drill
hole
70mm
screw
910
6
15 15
Step 17a
Place the Roof Panels (No. 11) onto the top
of the building. Allign the 2 Roof Panels
so they sit square before xing into postion.
Do not secure the building to the Floor
until the roof is tted.
Step 17b
Fix the two Roof panels together using
50mm oset from eachother as shown
in the diagram.
Do not secure the building to the Floor
until the roof is tted.
8x50mm Screws
Pre drill
hole
50mm
screw
11
11
P 7
P 8
12
Please retain product label and instructions for future reference
Step 18a
Once the Roof is alligned and secure the
Floor can be xed into postion.
Fix the building into place by screwing
through the panel into the oor making
sure to screw into the oor bearers.
*External panels not shown
64x50mm Screws
Step 18b
Continue to x the building into place by
screwing through the panel into the oor
making sure to screw into the oor bearers.
*External panels not shown
Pre drill
hole
50mm
screw
Pre drill
hole
50mm
screw
Step 17c
Screw through panel into the alligned
Roof bearers as shown in the diagram.
Do not secure the building to the
Floor until the roof is tted.
*External panels not shown
8x50mm Screws
Pre drill
hole
50mm
screw
Step 19
Place the Under Roof (No. 12) into position,
making sure it is ush to the Door panel
and Storage section.
Fix in place making sure to screw through
the Roof framing. Pre-drill holes rst.
15x30mm Screws
P 9
HANDLE
WITH CARE
12
3
4
Step 20
Cut the Felt (No. 34 ) into 3 sheets and lay
onto the roof.
*Ensure there is approximately 50mm of
overhang around the building.
Fix into place using 199x felt tacks at
100mm intervals.
199x Felt tacks Felt Length 3910mm
Felt
tacks
1.
2.
3.
Please retain product label and instructions for future reference
35
Step 21
Fix the Facias (4x No. 29 and 2x No. 30)
into position as shown.
No. 29 are for the front and No. 30 are
for the side.
Fix in place using 18x30mm screws.
18x30mm Screws
27
28 28
26
24
24
23
25
30
30
29 29
30
30
Step 22
Fix the Cover Trims (No. 23,2x No. 24,
No. 25, No.26, No.27and 2x No. 28) into
position as shown.
Fix each strip into position using 3x30mm
screws per trim.
24x30mm Screws
It is ESSENTIAL that you apply wood
treatment immediately after the building
has been assembled.
AFTER TREATMENT:
score around protective
cover on glazing and
carefuly peel
covering back
Step 24
P 10
Step 21
To x the lock to the Shed Door, rst x the Door
Blocks (No. 34 ) either side of the centre framing
of the Door with 4x40mm screws.
Once the Door Blocks are in place the Lock (No. 36)
can be xed in place as shown with 4x30mm
screws, making sure to align the key hole of the
lock to the key hole of the door.
4x30mm Screws
4x40mm Screws
Please retain product label and instructions for future reference
30mm
screw
Step 22
Pre drill holes and then x Chrome Handle
(No. 37) using 45mm bolt as shown in diagram.
Fix Door Stop(No. 33) to bottom right of door
panel at the back. Use 3x30mm screws.
2x45mm Bolt
3x30mm Screws
Button
Step 23
Attach two Turn Buttons (No. 43) to the Storage
Doorat the top and bottom of the door. Using
black screws ensure the screws go through
into the Storage Door Panel framing.
Attach two further Turn Buttons to the Slave
Door at the top and bottom of the door using
black screws.
These Turn Buttons help to keep your doors
straight during high and low levels of
moisture content in the air.
4x30mm Black Screws
Pre drill
hole
Pre drill
hole
43
37
30mm
screw
34
36
Pre drill
hole
30mm
screw
40mm
screw

Other Waltons Garden House manuals

Waltons 01OVLPA0705SDFW-V1 Instruction manual

Waltons

Waltons 01OVLPA0705SDFW-V1 Instruction manual

Waltons 01OVLPA0806SDFW-V1 Instruction manual

Waltons

Waltons 01OVLPA0806SDFW-V1 Instruction manual

Waltons 03TGCOR0808-V4 Instruction manual

Waltons

Waltons 03TGCOR0808-V4 Instruction manual

Waltons 01PTCOR0707-V1 Instruction manual

Waltons

Waltons 01PTCOR0707-V1 Instruction manual

Popular Garden House manuals by other brands

Mercia Garden Products SI-002-001-0022 Assembly instructions

Mercia Garden Products

Mercia Garden Products SI-002-001-0022 Assembly instructions

GAURDEN GF Series Assembly & instruction manual

GAURDEN

GAURDEN GF Series Assembly & instruction manual

total sheds Pent Summer House 14x4ft Assembly manual

total sheds

total sheds Pent Summer House 14x4ft Assembly manual

Palmako LA28-2929 installation manual

Palmako

Palmako LA28-2929 installation manual

Werth-Holz 71099 Assembly

Werth-Holz

Werth-Holz 71099 Assembly

STILLA Willow 12x8 Assembly instructions

STILLA

STILLA Willow 12x8 Assembly instructions

Palmako Iris installation manual

Palmako

Palmako Iris installation manual

Lemeks Palmako FR40-4838 Assembly, installation and maintenance manual

Lemeks

Lemeks Palmako FR40-4838 Assembly, installation and maintenance manual

ABSCO SHEDS 30302GK Assembly instructions

ABSCO SHEDS

ABSCO SHEDS 30302GK Assembly instructions

Sealey GSS1515.V2 instructions

Sealey

Sealey GSS1515.V2 instructions

Weka 820.2007.00.00 ASSEMBLY, USER AND MAINTENANCE INSTRUCTIONS

Weka

Weka 820.2007.00.00 ASSEMBLY, USER AND MAINTENANCE INSTRUCTIONS

Keter DUOTECH OAKLAND 757 user manual

Keter

Keter DUOTECH OAKLAND 757 user manual

Rowlinson Gainsborough Gazebo Assembly instructions

Rowlinson

Rowlinson Gainsborough Gazebo Assembly instructions

PEFC ABRI MASSIF 28MM Assembly Notice

PEFC

PEFC ABRI MASSIF 28MM Assembly Notice

ACERMAX AP3730 installation instructions

ACERMAX

ACERMAX AP3730 installation instructions

Lemeks Palmako FR44-4735-2 Assembly, installation and maintenance manual

Lemeks

Lemeks Palmako FR44-4735-2 Assembly, installation and maintenance manual

Grosfillex ABRI UTILITY 11 Assembly instructions

Grosfillex

Grosfillex ABRI UTILITY 11 Assembly instructions

Outdoor Life Group MILAN TUMBA S2418 manual

Outdoor Life Group

Outdoor Life Group MILAN TUMBA S2418 manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.