How to install
For wall xing.
For ceiling xing:
Use a paper or card template to mark position of holes for screws.Or measure
the distance between the xing holes on the rear brackets and mark their posi-
tion on the wall. Use a level to ensure the holes are horizontal.
01
02
It is required to use the ceiling xing kits included in the box with ceiling panels. Additional kits are
also available in our accessoriessection. It is not recommended to use the standard screws for wall
xings to mounting the ceiling.This kit will provide a much safer holding of the panel and will be
able to absorb vibration in the ceiling without risk of the panel sliding o the screwsheads.
When xing panels, it is a good policy to give careful consideration to positioning.
It is recommended that wall panels should not be too high or low on a wall, and for maximum eect
should not be obstructed by furniture or other objects.
Drill holes with suitable size masonry drill and insert raw plugs. For plasterboard,
where no wooden stud is found, it is recommended to use specialexpanding
raw plugs that will hold better.
02
02 Fix screws into raw plugs, leaving about 1cm proud, and mount the panel onto
them.
Warranty on your Warm4Less Heating panel
Free repair or replacement of this Warm4Lessheating product that develops an electrical fault within
the warranty period for your panel (refer to below),from the original invoice date of the purchase and
applies only to the name purchaser shown therein. It is required that you present a salesinvoice or
delivery note and must be returned properly packagedin original packagingor of equivalent
specication.
In the event that any of the following have been performed on the item, it will invalidate the
warranty:
1) Modication of the item in any way such as painting, sticking/attaching
objects/items onto it or cutting o the plug.*
2) Taking o any of the manufacturer’s stickers.
3) Carelessnessand negligence or malicious damage.
4) Taking apart the item/removing the rear electrical black box.
5) Transportation excluding the delivery to the customer.
6) Any damage from power surges/electrical outages/incorrect
fuse protection or lack of fused spur.