
Shanghai Weishi Mechanical CO.,LTD.
1. To prevent accidents and electric shock, please authorize the technicians with electrical
knowledge to operate.
2. To prevent the accidents and electric shock, when it is necessary to open the electrical
cabinet, please cut off the power first and then open the electrical cabinet after at least
5 minutes. Do not operate when your hands are wet.
3. To prevent human injury, please make adjustments on the adjustable components
(variable inductance, potentiometer, variable capacity) according to the indications in this
Service Manual and the Operation Manual only
4. To prevent human injury, please operate after the machine has been installed steadily.
Meanwhile, it is necessary to choose appropriate tools.
5. To prevent human injury, please verify whether the screws and the nuts are loose, whether
they have unexpected contact with other components.
6. To prevent human injury, please verify whether the connecting terminal, cable head are
damaged, shed or loose after operating.
7. To prevent human from injury and being involved in the machine, please be careful enough
and do not let your hair or clothes touch the transmission part when operating sewing
test.
1. To prevent human injury, please make adjustments within the range indicated in this Service
Manual and the Operation Manual.
2. To prevent the accidents and electric shock, when it is necessary to open the electrical
cabinet, please cut off the power first and then open the electrical cabinet after at least
5 minutes. Do not operate when your hands are wet.
3. To prevent human injury, please replace the components under the directions in this Service
Manual and the Operation Manual.
4. To prevent human from injury, please operate after the machine has been installed steadily.
Meanwhile, it is necessary to choose appropriate tools.
5. To prevent human injury, when solidifying the screw and the nut, if there is specified
torsional moment, please solidify in coincidence with the requirement; if there is no such
requirement, please solidify in an appropriate torsional moment.
6. To prevent human injury, please verify whether the screws and nuts are loose, whether
they have unexpected contact with other components.
7. To prevent human injury, please verify whether the connecting terminal, cable head are
damaged, shed or loose after operating.
According to the request of security, there are some floating polyvinyl chloride tube,
insulating tape and other insulating materials, and the internal wiring adopt the circuitous
way in order to keep away from the high-tension line. And all of them should be repristinated
after operating.
Adjustmen
Disassemble, Assemble