
Page 3
QTY
1
QTY
1
ITEM
1
PART NUMBER
01-0683164LAP
02-0168490-00
01-0683164HAP
01-0683164HAR
01-0683165-00
DESCRIPTION
FINAL ASSEMBLY, MODEL 2022LC / VP422LC
PCB ASSEMBLY, MODEL 2022D SERIES / EXCEPT 2022AC
FINAL ASSEMBLY, MODEL 2022HC / VP422HC
FINAL ASSEMBLY, MODEL 2022RC
FINAL ASSEMBLY, MODEL 2022AC
1
1
QTY
1
1
1
1
QTY
-
1
1
1
1
1
1
1
1
2
1
3
2
2
1
1
1
1
1
1
1
1
2
1
3
2
2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
06-180842-002
36-0341567-00
38-0441331-00
38-0240821-00
21-11091202-0
56-000000-100
23-0320760-00
13-062C40-16J
21-17020602-3
15-066939-056
15-041416-080
15-065419-080
21-12081205
06-146115-000
BASE, DIE CAST, BLACK W/1" NPT
FLASH TUBE ASSY / FTU 20W
"O" RING
SEAL, BASE
3/8 GROMMET P/N 901132093
TO-3P CHO THERM INSULATOR
SPRING CLIP, TRANSISTOR MOUNT
NUT, NO.6 FASTEX SCREW GROMMET
NUT #4 FASTEX SCREW GROMMET, NYLON
6-32 X 5/16 HEX WASHER HD THD FORMING
N0.4 X 1/2 PHILLIPS PAN HEAD SHEET METAL SCREW
6-32 X 1/2 PAN HD THD FORMING
SCREW GROMMET
MODEL 2022RC / BASE
1
1
1
1
1
1
4
1
3
2
2
1
-
1
1
1
1
1
2
1
3
2
2
1
--
-
1
-
1
1
3
1
3
17
18
21
22
23
24
11-760897-000
15-101416-100
11-481496-002
21-22081204-0
38-0241540-00
15-081416-080
MOUNTING COLLAR, BLACK
N0.10 X 5/8 PHSMS
MODEL 1200 SANDBLASTED BASE
HEYCO PLASTIC HOLE BUSHING
GASKET, MODEL 1200 BASE
N0.8 X 1/2" PPHSMS
2
1
1
1
2
3
-
-
-
---
--
--
--
1-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
OPTIC DOME / GREEN / LOW PROFILE / 4-3/4“
OPTIC DOME / AMBER / LOW PROFILE / 4-3/4“
OPTIC DOME / BLUE / LOW PROFILE / 4-3/4“
OPTIC DOME / AMBER / HIGH PROFILE / 5-3/4“
OPTIC DOME / GREEN / HIGH PROFILE / 5-3/4“
OPTIC DOME / RED / LOW PROFILE / 4-3/4“
OPTIC DOME / RED / HIGH PROFILE / 5-3/4“
OPTIC DOME / BLUE / HIGH PROFILE / 5-3/4“
OPTIC DOME / CLEAR / HIGH PROFILE / 5-3/4“
OPTIC DOME / CLEAR / LOW PROFILE / 4-3/4“
68-2180452-10
68-2180452-40
68-2180452-20
68-2180483-10
68-2180483-40
68-2180452-50
68-2180483-50
68-2180483-20
68-2180483-30
68-2180452-30
20
20
20
20
20
20
20
20
20
20
--
--
--
--
--
-
-
-
-
-
-
-
-
-
--102-0168499-00 PCB ASSEMBLY MODEL 2022AC ONLY
-1
-
---
OPTIC DOME / VIOLET / LOW PROFILE / 4-3/4“
OPTIC DOME / VIOLET / HIGH PROFILE / 5-3/4“
68-2180452-VO
68-2180483-VO
20
20
--
-
-
01-0683165___
DOME
COLOR
BASE
PART
NUMBER
KEY
1
DOME:
COLOR:
BASE:
H=HIGHDOME L= LOW DOME
A= AMBER BC
GRV
= BLUE = CLEAR
= GREEN = RED = VIOLET
P= PERM MOUNT M= MAG MOUNT
NOTE: DC voltage models are polarity sensitive. If the positive and negative wires
are reversed the unit will not function. The fuse is installed between the power
source and the strobe light beacon IN THE POSITIVE (+) LINE (red wire) and must
be fused at the battery.
MOUNTING INSTRUCTIONS:
This strobe beacon features a combination base which may be used for either
FLANGE MOUNT, 1 INCH (NPT) PIPE MOUNT, or PERMANENT MOUNT. The
threading for a 1 inch (NPT) pipe mounting is precast in the cast aluminum base,
PCB ASSEMBLY (COMPONENT SIDE)
to dismantle strobe.Refer to diagram on page 1
JU1
BLACK
JU2
QUINT FLASH
DOUBLE FLASH
RAPID RANDOM
ACTION FLASH
JU1 JU2
IN
IN
CUT
CUT
IN
CUT
IN
CUT
FLASH PATTERN
HI/LOW PATTERN
If you wish to control High or Low Power
externally cut the Violet wire off at this point
and exit with black and red wires. If you
ground this wire you will go to high power.
You will probably want to install a switch
so you can switch to high or low.
JUMPER OPTIONS
To achieve any one of the 4 flash patterns
listed in the above chart, you must either
cut-out or leave-in one, two, both or neither
of the two jumpers.
If you do not touch the
jumpers the unit will default to "QuintFlash".
RED
JU6
DIMPLES
DIMPLES
TOP VIEW INSIDE BASE
SEE PG. 3
IMPORTANT
INFORMATION
ON BASE.
FLANGE MOUNT
1. Select the mounting location taking into consideration visibility of
the strobe light flash, mounting surface and ease of wiring.
2. Using the base gasket (ITEM 5) as a template, mark the 3 mount-
ing holes and center wire access hole onto mounting surface.
3. Drill three mounting holes using a #29 drill (.136 inch, 3.5mm).
4. Drill the wire access hole using a 3/8 inch drill (.375 inch,
9.5mm). Be sure to remove burrs from access hole to prevent
any damage to wires.
5. Place gasket (ITEM 5) on mounting surface aligned with the
holes in the mounting surface. After connecting the beacon to the
power cable, feed wires through wire access hole. Place beacon
into proper position and slip mounting collar (ITEM 17) over
beacon to fit around the base of the unit. Align the 3 holes in the
mounting collar with the 3 mounting holes in the mounting
surface. Use the 3 enclosed mounting screws (ITEM 18) to
secure beacon to mounting surface.
1 INCH (NPT) PIPE MOUNT.
1. Feed the power cable through the 1 inch pipe and connect the
cable to the wires of the beacon.
2. Screw the beacon to the threads on the 1 inch pipe, taking
precaution not to damage the connected power supply wires.
PERMANENT MOUNT
This mounting of the strobe beacon is a tamper-proof way to secure
the unit to the mounting surface. Mounting screws are hidden inside
the base, and aren’t accessible unless unit is dismantled.
1. Remove the screws holding on the optic dome (ITEM 20) and
remove the dome. Then remove the screws holding on the power
supply (ITEM 1) and remove the power supply.
2. Locate all four of the 0.164 inch dimples within the perimeter of
the cast aluminum base. (See illustration below). Punch these
dimples out to create a hole for the mounting screws to fit
through.
3. Using the base as a template mark the 4 mounting holes onto the
mounting surface. Remove the base and mark in the center of
the 4 mounting holes, the location of the wire access hole.
4. Drill the mounting holes into the mounting surface to fit customer
supplied mounting hardware, drill the wire access hole using a
3/8 inch drill (.375 inch, 9.5mm). Remove burrs from wire access
hole to prevent damage to wires. It is also recomended that you
install a rubber grommet in each wire hole to protect the wires.
5. The gasket (ITEM 5) will be used between the base and the
mounting surface. Cut the gasket along the perforated circle to fit
diameter of base.
6. After connecting beacon to power cable, feed the wires through
the cable access hole and place the base with the gasket on the
mounting surface, lining up the mounting holes in the base with
the ones in the mounting surface. Secure base firmly to mounting
surface with customers hardware and reassemble beacon.