
1. Find an open, flat area in which to work.
Carefully remove all components from the
box and remove banding with a utility knife.
Check the parts list to verify package
contents.
2. Orient the two vertical ladder assemblies
on the floor as shown, then attach 7 standard
horizontal connectors to the vertical ladders
using the 1 1/4" screws provided. The top &
bottom connector should fit flush with the top
& bottom of the rack. This will be the back
of your rack. (figure 1)
Note: The top connector will not line up with
the ladder support piece near the top of the
rack. It should be flush with the top of the
rack and sit about 3/8" above the support
piece. This is to allow for easy install of our
top shelving in our trim-kit system. (figure 2)
*Minimize the risk of splitting your side ladders by
drilling a 1/16" pilot hole before driving the wood
screws. For best results, drive the screw most of
the way in with your drill, then finish tightening by
hand.
3. Flip rack over and repeat step two for securing
the remaining 2 standard connectors to the
top and bottom of the front of your rack.
(figure 3)
* PLEASE FOLLOW WRITTEN INSTRUCTIONS CAREFULLY
1
BACK OF
RACK
3
FRONT OF
RACK
2
TOP OF RACK
LADDER
SUPPORT
PIECE