User's Manual
AcuRev 1200
Energy Meter
I
AcuRev
1200
CopyRight © 2015 V2.02
This manual may not be altered or reproduced in whole or in part by any means
without the expressed written consent of Accuenergy.
The information contained in this document is believed to be accurate at the time of
publication. However, Accuenergy assumes no responsibility for any errors which may
appear here and reserves the right to make changes without notice. Please ask the local
representative for latest product specications before ordering.
[Document #2300E2202 Revision Date: Dec., 2015]
II
AcuRev
1200
Please read this manual carefully before installation, operation and maintenance
of AcuRev 1200 series meter. The following symbols in this manual are used to provide
warning of danger or risk during the installation and operation of the meters.
Electric Shock Symbol: Carries information about procedures which must be
followed to reduce the risk of electric shock and danger to personal health.
Safety Alert Symbol: Carries information about circumstances which if not
considered may result in injury or death.
Prior to maintenance and repair, the equipment must be de-energized and grounded.
All maintenance work must be performed by qualied, competent accredited professionals
who have received formal training and have experience with high voltage and current
devices. Accuenergy shall not be responsible or liable for any damages or injuries caused
by improper meter installation and/or operation.
III
AcuRev
1200
Contents
Chapter 1 Introduction-------------------------------------------------------------------------------------1
1.1 Meter Overview--------------------------------------------------------------------------2
1.2 Areas of Application--------------------------------------------------------------------------3
1.3 Product Features-------------------------------------------------------------------3
Chapter 2 Installation--------------------------------------------------------------------------------------5
2.1 Appearance and Dimensions---------------------------------------------------------7
2.2 Installation Methods---------------------------------------------------------8
2.3 Wiring-----------------------------------------------------------------------------------------------10
Chapter 3 Operation and Application-----------------------------------------------------------13
3.1 Display Panel and Keys-----------------------------------------------------------------14
3.2 Display Mode and Key Operations-----------------------------------------------------------15
3.3 Parameter Display and Key Operations-----------------------------------------------------22
3.4 Settings and Operations-----------------------------------------------------------------22
Chapter 4 Functions and Software----------------------------------------------------------25
4.1 Parameter Settings----------------------------------------------------------26
4.2 Basic Measurement Functions----------------------------------------------------------29
4.3 Energy------------------------------------------------------------------------------------------30
4.4 Demand------------------------------------------------------------------------------------------36
4.5 RO Funct i o n s------------------------------------------------------------------------------------37
4.6 Event Logging--------------------------------------------------------------------------------38
4.7 Meter Information---------------------------------------------------------------------------40
4.8 Sealing Function---------------------------------------------------------------------------40
IV
AcuRev
1200
Chapter 5 Communication-------------------------------------------------------------------------45
5.1 Modbus Protocol Introduction-------------------------------------------------------------46
5.2 Communication Format------------------------------------------------------------------------49
5.3 Application Details------------------------------------------------------------------------------53
Appendix-----------------------------------------------------------------------------------------------79
Appendix A Function List---------------------------------------------------------------------------80
Appendix B Technical Data and Specication-------------------------------------------------81
Appendix C Ordering Information---------------------------------------------------------------83
Appendix D Revision History----------------------------------------------------------------------84
V
AcuRev
1200
Welcome to AcuRev 1200!
You have purchased an advanced, versatile, multifunctional power meter.
Please note the following chapter descriptions in order to utilize the power meter
properly.
Chapter 1 Introduces the basic AcuRev 1200 features and application areas.
Chapter 2 Introduces AcuRev 1200 installation and wiring methods in detail.
Chapter 3 Walks through how to operate AcuRev 1200 via the display panel, display
measurement data and parameter settings.
Chapter 4 Introduces main functions with the included software.
Chapter 5 Introduces communication related informations, including communication
protocol format and parameter address table.
Appendix provides AcuRev 1200 technical specications and ordering information.
VI
AcuRev
1200
1
AcuRev
1200
1.1 Meter Overview
1.2 Areas of Application
1.3 Product Features
Chapter 1 Introduction
2
AcuRev
1200
1.1 Meter Overview
AcuRev 1200 series rail-mounted three phase energy meter has a small size and
high accuracy, and has access to 80A current directly. It is ideal for use in distributor and
tight spaces. The meter is equipped with an easy to read liquid crystal display (LCD) which
displays all the important informations. It is ideal for building energy management systems,
energy monitoring and energy metering systems.
 Energy
Real Energy: Total Real Energy, Net Real Energy, Consumed Real Energy, Generated
Real Energy
Reactive Energy: Total Reactive Energy,Net Reactive Energy,Consumed Reactive
Energy,Generated Reactive Energy
Apparent Energy: Apparent Energy
Time Of Use Energy Measurement: Real Energy under the four tariff, Time Of Use
Reactive Energy Measurement;
 Measurement Funtion
AcuRev 1200 series meters provide measurement and indication functions. Which
can measure Voltage, Current, Power, Frequency and Power Factor,and also have load
characteristics indication function. Different specifications of the meters have different
functions.
 Demand
This product provides demand measurement and demand climax of Current, Real
Power, Reactive Power and Apparent Power.
3
AcuRev
1200
 System Event Logging
The product can record the time and event ID about some important parameters.
 Data storage and load trend
The product has Non-volatile memory of 8M byte, which can store time-stamped real-
time measurement parameters and energy data. Users could depict power parameters
and load consumption trends by using the stored data. This function just adapt to AcuRev
1204.
 Communication
Supports RS485 communication port and infrared port. Supports Modbus RTU.
Infrared interface supports the on spot infrared meter reading.
1.2 Areas of Application
Large commercial center Rail transport
School Public facilities
Hotels and Buildings Smart distribution cabinet
Smart building system Energy management system
Industrial environment Energy saving system
1.3 Product Features
 Multifunction, High accuracy
AcuRev 1200 series meter has data collection and management function, energy
measurement and multi-parameters measurement function, and demand measurement,
event logging, trend record function.
4
AcuRev
1200
The measurement accuracy of energy, power, voltage, current is 0.5%.
 Small size, Convenient installation
AcuRev 1200 series products' appearance and dimension comply with the IEC 35mm
DIN standard, accounts for only 4 mold.
 Intuitive Display
The LCD display is very clear. All measurement parameters could be searched easily
through the display . The parameter could be set through the display. LCD has backlight
support, which can help users to use it in weak light environment.
 Safety
AcuRev 1200 series product has electronic seal function and physical seal. Users
cannot change the parameters through the keys when the electronic seal is in sealed, and
important parameters cannot be changed through communication, preventing malicious
data changement.
5
AcuRev
1200
Chapter 2 Installation
2.1 Appearance and Dimensions
2.2 Installation Methods
2.3 Wiring
6
AcuRev
1200
Before Installtion
The installation must be perfomred by qualified, competent accredited professionals
who have received formal training and have experience with high voltage and current
devices. Appropriate safety wear (gloves, glasses, arc flush suit, etc.) is mandatory to
ensure safe installation.
During normal meter operation, caution should be used when handling the following
as high voltage may be present: Terminal Blocks, Current Transformer connection
nodes, Potential Transformer connection nodes and the related circuits. All primary
and secondary circuits may contacting lethal current and voltage. Contact with current
channels must be avoided.
The power meter and I/O modules cannot be installed on the primary side of
transformers or where VA has limitations. The power meter can be only installed on the
secondary side. Avoid contacting with meter terminals after the completion of installtion.
Do not input voltage above the rated maximum limit of the power meter and devices
connected to it. Before energizing the meter, please refer to the meter's label and
specications.
Do not perform high voltage test / insulation experiment to output, input or
communication terminals.
The use of shorting blocks and fuses are recommended. Current transformers need to
be grounded.
Use dry cloth to wipe the meter.
The replacement of the battery must be performed by professionals.
7
AcuRev
1200
This chapter mainly described how to install an AcuRev 1200 series meter, which is a
very important step of using the meter correctly. This chapter gives some pictures about
how to install the meter and some notes. Before installing the meter, please read this rst.
2.1 Appearance and Dimensions
Appearance:
Figure 2-1 AcuRev 1200 Appearance
8
AcuRev
1200
Dimensions:
Figure 2-2 Meter base dimensions
2.2 Installation Methods
Environmental
Before installation, please check the temperature and
humidity to ensure the AcuRev 1200 series meter is being placed
where it will not be damaged.
1. Temperature
AcuRev 1200's operating temperature range is -25~70°C.
Exceeding this temperature range will cause damage to the
meter. Please note that it will influence the meter's working life negatively if the meter
operates in extremely high or extremely low temperatures. AcuRev 1200's storage
temperature range is -40~85°C.
Front View Side View
Unit: mm
Note
Temperature and humidity
of the environment
must accord with the
requirement of Acurev
1200, Otherwise it may
cause the meter damaged.
9
AcuRev
1200
2. Humidity
5% to 95% non-condensing.
3. Location
AcuRev1200 series meter should be installed in a dry and dust free environment.
Avoid exposing meter to excessive heat, radiation and high electrical noise sources.
Installation Steps:
This meter is DIN rail mounted, which ts 35 mm standard rails.
1. Insert the meter groove all the way into the rail, and ip the meter case as Figure
below shows, making the meter mounted into the rail.
Figure 2-3 Step A
10
AcuRev
1200
2. Use the metal clips to tighten the rail and installation will be completed.
Figure 2-4 Step B
2.3 Wiring
Terminals:
Figure 2-5 Meter base terminals
Upper row: Current Input, Serial Communication
Lower row: Current Output, Digital Output, Relay Output
ABS
R1 R2 P1 P2
LN
L
11
AcuRev
1200
Wiring:
Figure 2-6 wiring
Communication:
AcuRev1200 communication utilizes RS485 port, via Modbus-RTU protocol. The
wiringterminals are A, B, S. "A" is called dierential signal"+", "B" is called dierentialsignal"-",
"S" is connected to the cupper net of the Shielded Twisted Pair(STP) in the shielding layer.
The maximum distance of STP is 1200m. The distance will be shorter if more devices are on
the same communication link or using a higher baud rate.
If the master device does not have RS485 but RS232 port, a RS232/485 converter can
be utilized. Typical RS485 network topologies include line, circle and star.
In order to improve communication quality:
1. High-quality Shielded Twisted Pair is very important, AWG22 (0.6mm2) or bolder is
recommended. Two cables should be dierent colors.
2. Pay attention to "single point earthing". It means there is only one point of the
shielding connected to ground in a single communication link.
3. Every A(+) should be connected to A(+), B(-) to B(-), or it will inuence the network,
even damage the communication interface.
12
AcuRev
1200
4. "T" type connection topology should be avoided. This means no new branches
except from the starting point.
5. Keep communication cables away as much as possible from sources of electrical
noise. When several devices are connected (daisy chain) to the same long communication
line, an anti-signal reecting resistor (typical value 120-300 ohm, 0.25W) is often used at
the end of the circuit (the last meter of the chain) if the communication quality is distorted.
6. Use RS232/RS485 or USB/RS485 converter with optical isolated output and surge
protection.
7. An infrared port is also available in the Display Module, which supports meter
reading.

This manual suits for next models

1

Other AccuEnergy Measuring Instrument manuals

AccuEnergy AcuRev 2000 User manual

AccuEnergy

AccuEnergy AcuRev 2000 User manual

AccuEnergy Acuvim II User manual

AccuEnergy

AccuEnergy Acuvim II User manual

AccuEnergy Acuvim II series User manual

AccuEnergy

AccuEnergy Acuvim II series User manual

AccuEnergy AcuDC 241 User manual

AccuEnergy

AccuEnergy AcuDC 241 User manual

AccuEnergy AcuRev 2020 Series Installation and operation manual

AccuEnergy

AccuEnergy AcuRev 2020 Series Installation and operation manual

AccuEnergy AXM-WEB Reference guide

AccuEnergy

AccuEnergy AXM-WEB Reference guide

AccuEnergy Acuvim-L Series User manual

AccuEnergy

AccuEnergy Acuvim-L Series User manual

AccuEnergy AcuDC 200 Series User manual

AccuEnergy

AccuEnergy AcuDC 200 Series User manual

AccuEnergy Acuvim II series User manual

AccuEnergy

AccuEnergy Acuvim II series User manual

AccuEnergy AcuRev 1300 User manual

AccuEnergy

AccuEnergy AcuRev 1300 User manual

AccuEnergy RIK V User manual

AccuEnergy

AccuEnergy RIK V User manual

AccuEnergy AcuMesh-K User manual

AccuEnergy

AccuEnergy AcuMesh-K User manual

AccuEnergy AcuRev 1310 Series User manual

AccuEnergy

AccuEnergy AcuRev 1310 Series User manual

AccuEnergy AcuDC 240 Series User manual

AccuEnergy

AccuEnergy AcuDC 240 Series User manual

AccuEnergy Acuvim II series User manual

AccuEnergy

AccuEnergy Acuvim II series User manual

AccuEnergy Acuvim II User manual

AccuEnergy

AccuEnergy Acuvim II User manual

AccuEnergy AcuDC 210 Series User manual

AccuEnergy

AccuEnergy AcuDC 210 Series User manual

AccuEnergy EV300 Series User manual

AccuEnergy

AccuEnergy EV300 Series User manual

AccuEnergy Acuvim-L Series User manual

AccuEnergy

AccuEnergy Acuvim-L Series User manual

AccuEnergy AcuRev 2100 Installation and operation manual

AccuEnergy

AccuEnergy AcuRev 2100 Installation and operation manual

AccuEnergy AcuDC 240 Series User manual

AccuEnergy

AccuEnergy AcuDC 240 Series User manual

AccuEnergy Acuvim II series User manual

AccuEnergy

AccuEnergy Acuvim II series User manual

AccuEnergy AcuRev 2000 User manual

AccuEnergy

AccuEnergy AcuRev 2000 User manual

AccuEnergy AcuREV20 Series User manual

AccuEnergy

AccuEnergy AcuREV20 Series User manual

Popular Measuring Instrument manuals by other brands

Elforlight DLSeries Basic user manual

Elforlight

Elforlight DLSeries Basic user manual

Starrett 3900 Series user manual

Starrett

Starrett 3900 Series user manual

ATI Technologies PQ45H O & M Manual

ATI Technologies

ATI Technologies PQ45H O & M Manual

Bosch GRL Professional 240 HV Original instruction

Bosch

Bosch GRL Professional 240 HV Original instruction

Keysight E5071C Configuration guide

Keysight

Keysight E5071C Configuration guide

LaserLiner LAN-Check operating instructions

LaserLiner

LaserLiner LAN-Check operating instructions

Altana BYK color2view operating instructions

Altana

Altana BYK color2view operating instructions

F&F WN-711 quick start guide

F&F

F&F WN-711 quick start guide

Bushnell GOLF Tour V5 Shift owner's guide

Bushnell GOLF

Bushnell GOLF Tour V5 Shift owner's guide

ABB ProcessMaster FEP630 series manual

ABB

ABB ProcessMaster FEP630 series manual

Wagner Meters L620 owner's manual

Wagner Meters

Wagner Meters L620 owner's manual

Futech 150.40.M instruction manual

Futech

Futech 150.40.M instruction manual

ITRON EquaScan pMIURF ASSEMBLY AND PROGRAMMING MANUAL

ITRON

ITRON EquaScan pMIURF ASSEMBLY AND PROGRAMMING MANUAL

Hanna Instruments HI 4521 instruction manual

Hanna Instruments

Hanna Instruments HI 4521 instruction manual

Sontex Superstatic 789 user manual

Sontex

Sontex Superstatic 789 user manual

Siemens SITRANS F C MASSFLO MASS  6000 Ex-d manual

Siemens

Siemens SITRANS F C MASSFLO MASS 6000 Ex-d manual

FlowLine LI20 manual

FlowLine

FlowLine LI20 manual

CWP Accurate PPM 3.5 operating instructions

CWP

CWP Accurate PPM 3.5 operating instructions

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.