
DirectCommand
Installation
Montana Parruda Sprayer Kit
CAUTION: Sprayer boom should be lowered to ground or on hydraulic
safety stops before starting work. Do not work under sprayer boom
supported by hydraulic system only. Turn off machine and wait for all
machine motion to stop before starting work. Apply parking brake.
Be sure to wear proper eye protection when using any power
tools, such as when drilling control module mounting holes.
Be sure to route cables avoiding pinch points, sharp edges and
allowing extra slack where needed. Keep extra cabling out of the
operator’s area to prevent possible injury. Secure cables with nylon wire
ties.
Disconnect the Display,
components and
flow meter from electrical system when welding on or jump starting
equipment to prevent component damage due to power surges or excessive
current.
If using a non Ag Leader GPS receiver, make sure to install the
Null Modem Cable PN: 2000819, included in the Ag Leader Display kit, to
prevent damage to the Display or the GPS receiver.
Disconnect battery ground; by not disconnecting battery
ground you may damage machine or components during installation.
Use the Dielectric grease to coat the seals and terminals of
each connector that will be exposed to weather or chemicals as you plug
them in.
Check behind vehicle and implement panels for any hoses,
wiring, controls, etc. that could be damaged when drilling any mounting
holes.
Be sure to follow the alignment keys on the plugs and the
receptacles carefully. Do not use excessive force when mating connectors.