Airvana IP-RN 80000 User manual

®
Cover
IP-RN 8000 Installation and
Commissioning Guide
Release 2.0
910056 Rev01d


IP-RN 8000 Installation & Commissioning Guide iii
IP-RN 8000 Installation and Commissioning
Guide

iv Release 2.0, 910056 Rev01d
Copyright
2002 and 2003 Airvana, Inc. All rights reserved.
A
irvana is a registered trademark of Airvana. AirVista is a trademark of Airvana. All other trademarks ar
e
t
rademarks of their respective owners.
T
his document contains information that is the property of Airvana, Inc. This document may not be
c
opied, reproduced, reduced to any electronic medium or machine readable form, or otherwise duplicated
,
a
nd the information herein may not be used, disseminated or otherwise disclosed, except with the prior
w
ritten consent of Airvana, Inc.
T
HE SPECIFICATIONS AND INFORMATION REGARDING THE PRODUCTS IN THIS MANUAL
A
RE SUBJECT TO CHANGE WITHOUT NOTICE. ALL STATEMENTS, INFORMATION, AND
R
ECOMMENDATIONS IN THIS MANUAL ARE BELIEVED TO BE ACCURATE BUT ARE
P
RESENTED WITHOUT WARRANTY OF ANY KIND, EXPRESS OR IMPLIED. USERS MUST
T
AKE FULL RESPONSIBILITY FOR THEIR APPLICATION OF ANY PRODUCTS.
T
HE SOFTWARE LICENSE AND LIMITED WARRANTY FOR THE ACCOMPANYING PRODUC
T
A
RE SET FORTH IN THE INFORMATION PACKET THAT SHIPPED WITH THE PRODUCT AND
A
RE INCORPORATED HEREIN BY REFERENCE. IF YOU ARE UNABLE TO LOCATE THE
S
OFTWARE LICENSE OR LIMITED WARRANTY, CONTACT YOUR AIRVANA SALES
R
EPRESENTATIVE FOR A COPY.

IP-RN 8000 Installation & Commissioning Guide v
Contents
About this guide
About this chapter........................................................................................................................................... xiii
Purpose............................................................................................................................................................. xiv
Audience.......................................................................................................................................................... xiv
Conventions...................................................................................................................................................... xv
Text conventions....................................................................................................................................... xv
Icon conventions..................................................................................................................................... xvii
Related documentation ................................................................................................................................. xviii
Release 2.0 document set...................................................................................................................... xviii
Documentation CD-ROM......................................................................................................................... xx
Release 2.0 online documentation............................................................................................................ xx
Airvana contact information............................................................................................................................. xx
Chapter 1
Introducing the IP-Radio Node 8000
Understanding the network................................................................................................................................. 2
Understanding IP-RN 8000 front, side and back views...................................................................................... 3
Understanding the cabinet font view ......................................................................................................... 3
Understanding cabinet right side view........................................................................................................ 5
Understanding the cabinet back view......................................................................................................... 7
Understanding access panels ...................................................................................................................... 9
Understanding module slot numbering............................................................................................................. 11
Understanding replaceability terms.................................................................................................................. 12
Understanding the Sector Radio Kit and the Antenna Interface Unit............................................................... 13
Understanding radio sectors...................................................................................................................... 13
Understanding the Sector Radio Kit......................................................................................................... 14
Understanding the Radio Module............................................................................................................. 14
Understanding the Power Amplifier module............................................................................................ 16
Understanding the Antenna Interface Unit module.................................................................................. 17
Understanding the Digital Module Kit............................................................................................................. 19
Understanding Digital Module Kit modules............................................................................................. 19
Understanding Digital Module Kit redundancy........................................................................................ 20
Understanding the Timing Frequency Unit module................................................................................. 21
Understanding the Base Input Output/System Controller module ........................................................... 22
Understanding the 1xDOM module.......................................................................................................... 25
Understanding the Power Distribution Unit ..................................................................................................... 27
Understanding the Alarm Unit.......................................................................................................................... 29
Understanding the Fan Unit.............................................................................................................................. 31
Understanding the backhaul punch block and switch....................................................................................... 32
Understanding the backhaul punch block................................................................................................. 32
Understanding the backhaul switch.......................................................................................................... 33
Understanding surge protection and grounding................................................................................................ 33
Understanding the secondary surge protection system............................................................................. 33
Understanding grounding requirements.................................................................................................... 34
Understanding external connections................................................................................................................. 34
Understanding the tech-on-site switch.............................................................................................................. 36
Understanding LEDs......................................................................................................................................... 37
Understanding cabinet air flow......................................................................................................................... 37
Chapter 2
Installation process
About this chapter............................................................................................................................................. 39
Understanding installation and commissioning................................................................................................ 40
Understanding the installation process............................................................................................................. 40
Understanding alternative installation.............................................................................................................. 41

Contents
vi Release 2.0, 910056 Rev01d
Chapter 3
Before you install
About this chapter............................................................................................................................................. 43
Site planning and construction.......................................................................................................................... 44
Planning the network........................................................................................................................................ 44
Receiving all shipping and materials................................................................................................................ 44
Electro static discharge and GR-1089 compliance........................................................................................... 44
Safety Recommendations and Warnings.......................................................................................................... 45
Radio frequency radiation exposure limits............................................................................................... 45
Lithium battery warning ........................................................................................................................... 45
Maintaining Safety With Electricity......................................................................................................... 45
Warning Definition................................................................................................................................... 46
Product Disposal....................................................................................................................................... 46
Lightning Activity Warning...................................................................................................................... 46
Jewelry Removal Warning........................................................................................................................ 46
Power Supply Warning............................................................................................................................. 46
Power Supply Disconnection Warning..................................................................................................... 46
Power Disconnection Warning................................................................................................................. 46
Grounded Equipment Warning................................................................................................................. 47
Installation Warning ................................................................................................................................. 47
Notices.............................................................................................................................................................. 47
Part-68 Notice........................................................................................................................................... 47
Chapter 4
Installing the cabinet, power, and ground
About this chapter............................................................................................................................................. 49
Understanding the cabinet installation process................................................................................................. 50
Understanding outdoor installation................................................................................................................... 51
Mounting pad............................................................................................................................................ 51
Loading..................................................................................................................................................... 51
Lifting - overhead space ........................................................................................................................... 51
Earthquakes............................................................................................................................................... 51
Mounting hardware................................................................................................................................... 51
Understanding indoor installation..................................................................................................................... 52
Loading..................................................................................................................................................... 52
Lifting - overhead space ........................................................................................................................... 52
Earthquakes............................................................................................................................................... 52
Mounting................................................................................................................................................... 52
Planning conduit and grounding installation.................................................................................................... 53
Unpacking the cabinet from its shipping container.......................................................................................... 54
Requirements............................................................................................................................................ 54
Procedure.................................................................................................................................................. 54
Removing access panels ................................................................................................................................... 56
Requirements............................................................................................................................................ 56
Procedure.................................................................................................................................................. 56
Unbolting the cabinet from its palette............................................................................................................... 57
Requirements............................................................................................................................................ 57
Procedure.................................................................................................................................................. 57
Placing the cabinet on the concrete pad............................................................................................................ 58
Requirements............................................................................................................................................ 58
Procedure.................................................................................................................................................. 59
Bolting the cabinet in place .............................................................................................................................. 62
Requirements............................................................................................................................................ 62
Procedure.................................................................................................................................................. 62
Re-installing the left side access panel ............................................................................................................. 63
Requirements............................................................................................................................................ 63
Procedure.................................................................................................................................................. 63
Routing power and backhaul cables into cabinet and closing right side access panel ..................................... 64

Contents
IP-RN 8000 Installation & Commissioning Guide vii
Requirements............................................................................................................................................ 64
Procedure.................................................................................................................................................. 64
Connecting the power supply ........................................................................................................................... 65
Requirements............................................................................................................................................ 65
Procedure.................................................................................................................................................. 66
Grounding the cabinet....................................................................................................................................... 67
Requirements............................................................................................................................................ 67
Procedure.................................................................................................................................................. 68
Testing primary power...................................................................................................................................... 69
Requirements............................................................................................................................................ 69
Procedure.................................................................................................................................................. 69
Chapter 5
Connecting the backhaul
About this chapter............................................................................................................................................. 73
Understanding the backhaul installation process.............................................................................................. 74
Understanding backhaul links........................................................................................................................... 75
Removing the punch block access panel .......................................................................................................... 76
Requirements............................................................................................................................................ 76
Procedure.................................................................................................................................................. 76
Routing backhaul to the backhaul punch block................................................................................................ 77
Requirements............................................................................................................................................ 77
Procedure.................................................................................................................................................. 77
Wiring backhaul to the backhaul punch block.................................................................................................. 79
Requirements............................................................................................................................................ 79
Procedure.................................................................................................................................................. 79
Re-installing the access panels ......................................................................................................................... 83
Requirements............................................................................................................................................ 83
Procedure.................................................................................................................................................. 83
Chapter 6
Connecting antennas
About this chapter............................................................................................................................................. 85
Understanding the antenna installation process................................................................................................ 86
Understanding warnings and cautions.............................................................................................................. 87
Understanding the pre-assembled Rox System ................................................................................................ 87
Optionally assembling your own Rox .............................................................................................................. 89
Airvana Rox kits....................................................................................................................................... 89
Assembly requirements............................................................................................................................. 89
RF and GPS cable locations...................................................................................................................... 90
Removing access panels ................................................................................................................................... 91
Requirements............................................................................................................................................ 91
Procedure.................................................................................................................................................. 91
Installing the Rox System cabinet seal............................................................................................................. 94
Requirements............................................................................................................................................ 94
Procedure.................................................................................................................................................. 94
Connecting GPS and RF antennas.................................................................................................................... 96
Requirements............................................................................................................................................ 96
Procedure.................................................................................................................................................. 96
Chapter 7
Installing modules
About this chapter........................................................................................................................................... 103
Understanding the module installation process.............................................................................................. 104
Installing a Power Amplifier........................................................................................................................... 105
Requirements.......................................................................................................................................... 105

Contents
viii Release 2.0, 910056 Rev01d
Procedure................................................................................................................................................ 106
Installing a Radio Module............................................................................................................................... 108
Requirements.......................................................................................................................................... 108
Procedure................................................................................................................................................ 108
Connecting the RM to the PA with the RF cable ........................................................................................... 111
Requirements.......................................................................................................................................... 111
Procedure................................................................................................................................................ 111
Connecting the Sector Radio Kit to the Antenna Interface Unit .................................................................... 113
Requirements.......................................................................................................................................... 113
Procedure................................................................................................................................................ 113
Installing a Timing Frequency Unit................................................................................................................ 116
Requirements.......................................................................................................................................... 116
Procedure................................................................................................................................................ 116
Installing a Base Input Output/System Controller.......................................................................................... 119
Requirements.......................................................................................................................................... 119
Procedure................................................................................................................................................ 119
Installing a 1xDOM........................................................................................................................................ 122
Requirements.......................................................................................................................................... 122
Procedure................................................................................................................................................ 122
Chapter 8
Applying primary power
About this chapter........................................................................................................................................... 125
Powering the node .......................................................................................................................................... 126
Requirements.......................................................................................................................................... 126
Procedure................................................................................................................................................ 126
Chapter 9
Commissioning process
About this chapter........................................................................................................................................... 127
Understanding the commissioning process..................................................................................................... 128
Understanding commissioning requirements.................................................................................................. 129
Requirements.......................................................................................................................................... 129
Other requirements ................................................................................................................................. 129
Software update requirements ................................................................................................................ 129
Chapter 10
Establishing CLI connections
About this chapter........................................................................................................................................... 131
Understanding the CLI connection process.................................................................................................... 132
Understanding CLI/serial connections............................................................................................................ 132
CLI/serial................................................................................................................................................ 132
CLI/serial on redundant systems..................................................................................................... 132
CLI/telnet/craft Ethernet......................................................................................................................... 133
CLI/telnet/backhaul ................................................................................................................................ 133
Understanding craft Ethernet connection to the node..................................................................................... 133
Establishing the CLI/serial connection........................................................................................................... 135
Requirements.......................................................................................................................................... 135
Procedure................................................................................................................................................ 135
Configuring IP on the craft Ethernet and laptop............................................................................................. 137
Establishing the CLI/telnet/Ethernet connection............................................................................................ 138
Requirements.......................................................................................................................................... 138
Procedure................................................................................................................................................ 138

Contents
IP-RN 8000 Installation & Commissioning Guide ix
Chapter 11
Updating node software
About this chapter........................................................................................................................................... 139
Understanding the software update process.................................................................................................... 140
Checking the active release and free disk space............................................................................................. 140
Requirements.......................................................................................................................................... 140
Procedure................................................................................................................................................ 141
Transferring the node software from the laptop to the node........................................................................... 142
Requirements.......................................................................................................................................... 142
Procedure................................................................................................................................................ 142
Activating the release...................................................................................................................................... 144
Chapter 12
Running the commissioning script
About this chapter........................................................................................................................................... 145
Understanding the scripting process............................................................................................................... 146
Understanding scripts ..................................................................................................................................... 146
Understanding script transfer options............................................................................................................. 147
Serial link requires less configuration .................................................................................................... 147
Remote file transfer requires FTP........................................................................................................... 147
Use FTP to transfer large files such as software releases....................................................................... 147
Initializing the node to receive a file with kermit........................................................................................... 147
Transmitting a script from a laptop to the network element........................................................................... 148
Verifying the script file is on the node ........................................................................................................... 154
Running the script........................................................................................................................................... 155
Chapter 13
Loopback testing backhaul links
About this chapter........................................................................................................................................... 157
Understanding the backhaul link loopback test process................................................................................. 158
Understanding backhaul loopback testing...................................................................................................... 159
Understanding a typical T1/E1 backhaul network.......................................................................................... 160
Understanding Ethernet loopbacks................................................................................................................. 160
Looping back T1/E1 backhaul links............................................................................................................... 161
Looping back Ethernet backhaul links............................................................................................................ 162
Entering diagnostic mode and configuring test parameters............................................................................ 163
Requirements.......................................................................................................................................... 163
Procedure................................................................................................................................................ 163
Performing external loopback tests on backhaul links ................................................................................... 164
Troubleshooting failed backhaul links............................................................................................................ 166
Removing physical loopbacks........................................................................................................................ 168
Chapter 14
Calibrating transmit power
About this chapter........................................................................................................................................... 169
Understanding the transmit power calibration process................................................................................... 170
Understanding calibration purpose................................................................................................................. 171
Understanding requirements........................................................................................................................... 171
Understanding the need for simultaneous CLI sessions................................................................................. 171
Enabling the base station and checking the IP-RNC 8500............................................................................. 172
Requirements.......................................................................................................................................... 172
Procedure................................................................................................................................................ 172
Verifying GPS status ...................................................................................................................................... 172
Requirements.......................................................................................................................................... 172
Procedure................................................................................................................................................ 173
Disabling all sectors........................................................................................................................................ 174

Contents
xRelease 2.0, 910056 Rev01d
Requirements.......................................................................................................................................... 174
Procedure................................................................................................................................................ 174
Attaching the sector’s test equipment............................................................................................................. 176
Required tools......................................................................................................................................... 176
Warnings................................................................................................................................................. 176
Procedure................................................................................................................................................ 177
Enabling and blossoming the sector to be calibrated...................................................................................... 178
Requirements.......................................................................................................................................... 178
Procedure................................................................................................................................................ 178
Starting FTAP for the sector........................................................................................................................... 179
Requirements.......................................................................................................................................... 179
Procedure................................................................................................................................................ 179
Measuring power loss for the sector............................................................................................................... 180
Requirements.......................................................................................................................................... 180
Procedure................................................................................................................................................ 180
Setting the sector’s transmit power................................................................................................................. 181
Requirements.......................................................................................................................................... 181
Procedure................................................................................................................................................ 181
Verifying the sector’s power level.................................................................................................................. 182
Requirements.......................................................................................................................................... 182
Procedure................................................................................................................................................ 182
Completing the sector’s transmit power calibration process.......................................................................... 183
Requirements.......................................................................................................................................... 183
Warnings................................................................................................................................................. 183
Procedure................................................................................................................................................ 184
Blossoming and enabling all sectors............................................................................................................... 185
Requirements.......................................................................................................................................... 185
Procedure................................................................................................................................................ 185
Chapter 15
Completing commissioning
About this chapter........................................................................................................................................... 187
Understanding the commissioning completion process.................................................................................. 188
Checking the modules with CLI..................................................................................................................... 188
Disconnecting the laptop ................................................................................................................................ 189
Preparing the cabinet for your departure ........................................................................................................ 189
Preparing the site for your departure .............................................................................................................. 190
Appendix A
IP-RN 8000 Specifications
About this appendix........................................................................................................................................ 191
Appendix B
Using the door
About this appendix........................................................................................................................................ 197
Opening the door ............................................................................................................................................ 198
Closing the door.............................................................................................................................................. 199
Padlocking the door ........................................................................................................................................ 200
Opening the PC shelf...................................................................................................................................... 201
Closing the PC shelf ....................................................................................................................................... 202
Appendix C
Using access panels
About this appendix........................................................................................................................................ 203
Removing the power terminal access panel.................................................................................................... 204
Requirements.......................................................................................................................................... 204
Re-installing the power terminal access panel................................................................................................ 205

Contents
IP-RN 8000 Installation & Commissioning Guide xi
Requirements:......................................................................................................................................... 205
Re-installing the right side cable access panel................................................................................................ 207
Glossary
Acronyms
Index

Contents
xii Release 2.0, 910056 Rev01d

IP-RN 8000 Installation & Commissioning Guide xiii
About this guide
About this chapter
This chapter provides information you need to use the IP-RN 8000 Installation and Commissioning
Guide effectively. Specifically, it contains the following sections:
•Purpose on page xiv
•Audience on page xiv
•Conventions on page xv
•Related documentation on page xviii
•Airvana contact information on page xx

About this guide
xiv Release 2.0, 910056 Rev01d
Purpose
This guide provides detailed processes and procedures required to install and commission an IP-RN 8000.
Audience
This guide should be read by network planners in order to understand the installation and commissioning
process and requirements. This guide should be used by field technicians to install and commission nodes at
cell sites.
Field technicians installing nodes must be able to use the following:
• Common tools such as screwdrivers and wrenches
• Torque wrench
• Thread tapping kits
• Crane for lifting the cabinet onto the concrete pad
• 66-punch blocks
Field technicians commissioning nodes must use a variety of software applications, including:
• Window 98 (at least)
•FTP
• HyperTerminal or an equivalent terminal emulation program.
They must also be able to understand serial connections, CLI node management, telnet, and Ethernet
connections.

Conventions
IP-RN 8000 Installation & Commissioning Guide xv
Conventions
This section describes Airvana document conventions. It contains these sections:
•Text conventions on page xv
•Icon conventions on page xvii
Text conventions
Table 1 lists and describes the text conventions in Airvana guides.
Table 1 Airvana text conventions
Convention Description
bold face angle brackets
< > Indicate a required parameter in a Command Line Interface (CLI) command.
For example:
>band-class <class>
In the above example, <class>is a required parameter that happens to be a
variable parameter (indicated by the italics) with a range of 1 to 3. A valid
command in this syntax is:
>band-class 3
Indicate that you press the keyboard character enclosed in the brackets. For
example:
• Press <ENTER> to continue.
In the above example, you press the Enter key to continue.
• Press <CTRL><ALT><DELETE> to reboot your computer.
In the above example, you press the Ctrl, Alt, and Delete keys
simultaneously to reboot your computer.
boldface screen font Indicates text that must be entered exactly as shown. For example:
•Enterping 192.23.10.12 at the CLI prompt.
•Enter255.255.255.0 in the Net Mask field.
In both examples above, you must enter the bold text exactly as shown.
italic screen font Indicates a variable parameter in a CLI command. For example:
>authentication key <aukey>
In the above example, <aukey>is a variable parameter that specifies the
authentication key for which you must enter a value, containing up to 16
numbers. A valid command in this syntax is:
>authentication key 9782503000
boldface square brackets
[ ]
Indicates an optional parameter in a CLI command. For example:
>activate image <version> [reboot]
In the above example, [reboot] is an optional parameter. A valid
command in this syntax is:
>activate image rnc8500.2.0.0
boldface pipe character
|
Indicates you enter one or the other of the identified parameter options. For
example:
>channel-included <yes | no>
A valid command in this syntax is:
>channel-included yes

About this guide
xvi Release 2.0, 910056 Rev01d
A.B.C.D Indicates a standard IP address. For example:
>telnet <A.B.C.D>
A valid command in this syntax is:
>telnet 10.0.0.1
/bit-length-mask Indicates an IP mask in bit-length format. For example:
>ip address <A.B.C.D/bit-length-mask>
A valid command in this syntax is:
>ip address 10.1.1.1/24
AA:BB:CC:DD:EE:FF Indicates a Media Access Control (MAC) hardware address specified as six
pairs of hexadecimal characters separated by colons. For example:
>ip address <A.B.C.D> <AA:BB:CC:DD:EE:FF>
A valid command in this syntax is:
>ip address 10.1.1.1 11:22:33:DD:EE:FF
arrow icon (⇒)Indicates the Graphical User Interface (GUI) menu path. For example:
Select Edit ⇒Add Network to open the Add Network screen.
In the above example, you select the Add Network option from the Edit
menu to open the Add Network screen.
blue underline text Indicates a hypertext link in a PDF file to the cross-referenced text. For
example:
See Audience on page xiv.
In the above example, clicking on Audience brings you to the appropriate
section and page in a PDF file for the Audience section.
plain screen font Indicates system output in a command line or system-generated file. For
example:
IP address 192.23.10.12 is alive.
The above example shows the system’s response after you successfully ping
the identified IP address.
boldface font Indicates GUI menu options, drop-down lists, and buttons. For example:
1. Select Edit ⇒Delete Node.
The system prompts you to confirm the request.
2. Click OK.
plain italic font Indicates file and directory names, book titles, and emphasized words.
Table 1 Airvana text conventions (continued)
Convention Description

Conventions
IP-RN 8000 Installation & Commissioning Guide xvii
Icon conventions
Airvana documents use the following icons:
CAUTION
The caution icon appears in procedures, that, if performed
incorrectly, can damage equipment or lose data.
NOTE
The note icon appears in text that provides additional or helpful
information.
TIP The tip icon appears in text that describes procedure shortcuts.
WARNING
The warning icon appears in procedures, that, if performed
incorrectly, can physically harm you. Before you perform the
procedure, you must be aware of electrical circuitry hazards and
be familiar with standard practices for preventing accidents.
WRIST
STRAP
The wrist strap icon appears in procedures that require you to
wear a wrist strap.

About this guide
xviii Release 2.0, 910056 Rev01d
Related documentation
This section describes documentation related to the IP-RN 8000 Installation and Commissioning Guide. It
contains these sections:
•Release 2.0 document set on page xviii
•Documentation CD-ROM on page xx
•Release 2.0 online documentation on page xx
Release 2.0 document set
Table 2 lists and briefly describes each guide in the Airvana Release 2.0 Customer Documentation set.
Table 2 Release 2.0 document set
Guide title Brief description
Airvana Release 2.0 Notes Introduces Release 2.0 features and identifies known
anomalies and any workarounds.
Airvana Release 2.0 Documentation Road Map Single-page document graphically depicting Airvana
IP-RAN deployment steps, with pointers to the
appropriate Airvana Release 2.0 guide documenting
each step.
Airvana IP-RAN RF and 1xEV-DO Planning Guide Provides a comprehensive understanding of the Airvana
IP-RAN planning process, identifying the information a
qualified network engineer needs to design the radio
frequency (RF) portion of a new IP-RAN to meet an
operator’s service quality, coverage, and capacity
requirements. This information enables the network
engineer to determine cell site locations and the number
of carriers each cell site requires.
Additionally, identifies the information a qualified
network engineer needs to design the 1xEV-DO portion
of a new IP-RAN, focusing on how to:
• Determine the number of IP-RNC 8500s required to
support the IP-RN 8000s
• Associate IP-RN 8000s with IP-RNC 8500s
• Implement fault tolerance in the IP-RAN
• Configure the PDSN
• Configure any AN-AAAs on the IP-RAN
• Overlay an IP-RAN on a cdma-2000 network
Airvana IP-RAN Network Planning Guide Provides a comprehensive understanding of the IP
planning portion of designing a new IP-RAN. Discusses
IP address/subnet design and network element IP
requirements, as well as load balancing and static route/
RIP recommendations. Includes a chapter on AirVista
Management System planning, including remote-access
options and fault-tolerance planning.

Related documentation
IP-RN 8000 Installation & Commissioning Guide xix
Airvana Cell Site Planning Guide Provides professionals responsible for the wireless
operator's planning, cell-site acquisition/zoning, and
architecture/civil engineering functions, the
specifications they need to select and prepare cell sites
for Airvana IP-RN 8000 (IP Radio Node 8000)
installations that are greenfield deployments. The guide
focuses on the IP-RN 8000 standard configuration.
Airvana Script Generation Guide Describes how to use the Airvana Merge Tool and Script
Generation Tool to produce customized configuration
scripts for commissioning IP-RN 8000s and
IP-RNC 8500s.
Airvana 1xEV-DO Parameters Reference Guide Provides parameter details for configurable 1xEV-DO
parameters. This guide is available post Release 2.0.
Getting Started with the AirVista Management System Printed guide shipped with the AirVista Management
System software CD. Contains AirVista licensing
information, software and hardware requirements, and
describes how to install AirVista server software,
including guidelines or installing the Oracle® and
VERITAS® software required to support AirVista.
IP-RNC 8500 Installation and Commissioning Guide Describes how to physically install the IP-RNC 8500 at
the data center, including: rack-mounting instructions,
backhaul network connections, the Packet Data Serving
Node (PDSN) connection, and CLI management station
connection. Describes the power-on process and how to
use the CLI to run the configuration script to
commission the device. Lists physical and
environmental specifications, agency approvals, and
cable specifications and pinouts.
IP-RN 8000 Installation and Commissioning Guide Describes how to physically install the IP-RN 8000,
including how to physically secure the IP-RN 8000 at
the cell site, connect the IP-RN 8000 to the backhaul
network, cell-site antenna, cell-site grounding system,
GPS antenna, and CLI management station. Describes
how to power on the IP-RN 8000 and use the CLI to run
the configuration script to commission the device.
Covers physical and environmental specifications,
agency approvals, cable specifications, pinouts, voltage
power requirements, and concrete and crane
installations.
AirVista Management System Administrator Guide Describes how to administer, configure, and maintain the
AirVista server.
AirVista Management System User Guide Describes how to use AirVista client software to manage
an Airvana IP-RAN.
Airvana Network Integration Guide Describes the steps to integrate various pieces of
equipment and test connectivity in the IP-RAN prior to
going operational. This guide is available post Release
2.0.
Table 2 Release 2.0 document set (continued)
Guide title Brief description

About this guide
xx Release 2.0, 910056 Rev01d
Documentation CD-ROM
The Airvana Release 2.0 document set and additional literature are available in a CD-ROM package.
Airvana updates the documentation CD-ROM with every software release, as well as periodically between
releases. To order an Airvana Release 2.0 Documentation CD-ROM, contact your local sales representative
or Airvana customer support.
Release 2.0 online documentation
The entire Airvana Release 2.0 document set is available as HTML online documentation integrated with
the AirVista Management System. The Release 2.0 online documentation features:
• Context-sensitive help support for all AirVista screens
• Integrated email support for contacting Airvana customer support
• Access to PDF files of all Release 2.0 documents
• Full-text search support and bookmarks
Airvana contact information
To contact Airvana by:
• Phone:
+ 1 (866) 344-7437
+ 1 (866) 3G IS HERE
+ 1 (978) 250-3000 (International)
• Email:
support@airvananet.com
Airvana Command Line Interface (CLI) Reference Guide Provides a CLI overview and describes the function of
every CLI command.
Airvana Logging Message Reference Guide Provides a logging overview and describes each log
message, identifying what each message means, possible
causes, and guidelines for responding to each error
message.
IP-RN 8000 Hardware Maintenance Guide Provides instructions for maintaining IP-RN 8000
hardware. This guide is available post Release 2.0.
IP-RNC 8500 Hardware Maintenance Guide Provides instructions for maintaining IP-RNC 8500
hardware. This guide is available post Release 2.0.
Table 2 Release 2.0 document set (continued)
Guide title Brief description
Table of contents