General Installation Instructions & Special Solutions
General instructions
Before installing the Aquato system into the tank , please take out the required minimum water
height Hw,min in the SBR tank and the minimum height of sludge storage Hsin the primary treat-
ment according to the planned number of inhabitants from the "general technical approval" or a
separate design calculation.
Aquato KOM
The feeding-, sludge- and clearwater siphons are beeing xed to the dividing wall each with 2
xing-clamps and stainless steel anchor bolts. The xing-clamps should be above the future
water level, in order to allow removal from the lled tank if necessary. The discharge port of the
clearwater siphon is connected to the outlet with a gravity slope. With any single chamber primary
treatment, a bafe wall has to be installed around the suction port of the feeding siphon (oating
sludge/ scum retention).
Please note: Special installation accessories are required for dividing walls in PE tanks and GRP
tanks, which are not automatically included and have to be ordered separately.
Aquato KOM-chain unit
The feeding-, sludge- and clearwater siphons are each attached to a PE carrying tube with
clamps.
The PE-carrying tube has a stainless steel bracket on top, on which the siphons are suspended
with 2 shackles and 2 chains each 1.5 m long, the height is adjusted via the chain length.
At the bottom there is a concrete weight to keep the unit upright .
The discharge port of the clearwater siphon is connected to the outlet with a gravity slope. With
any single chamber primary treatment, a bafe wall has to be installed around the suction port of
the feeding siphon (oating sludge/ scum retention).
Aquato KOM-PAKT
The feeding-, sludge- and clearwater siphons form a unit with the carrying tube and are placed
on the dividing wall as a whole. The carrying tube has 2 bearing surfaces up to 75 mm and up
to 125 mm. All siphons are assembled to one holder. By releasing the clamp, any height can be
adapted. The feeding siphon has to be adjusted corresponding to Hs, the clearwater siphon has to
be adjusted corresponding to Hw,min. The discharge port of the clearwater siphon is connected to
the outlet with a gravity slope. With any single chamber primary treatment, a bafe wall has to be
installed around the suction port of the feeding siphon (oating sludge/ scum retention).
Please note: Special installation accessories are required for dividing walls in PE tanks
and GRP tanks, which are not automatically included and have to be ordered separately.
Special case of divergent head at all KOM systems
The Standard lift height (head) of our KOM system for the clearwater discharge is max. 50 cm,
which corresponds approximately to the distance Hw,min up to the outlet. In case the head, for
example, needs to be increased by 35 cm, all HT-pipes have to be extended by 35 cm below
and also extended by 35 cm above the Hw,min and level Hs. A larger head causes a deeper air
injection level (= hose connection) by the same proportion.
In the primary treatment the feeding siphon can be used without any change, it then results in a
larger pre-treatment volume.