
- INSTALLATION HEAT PUMP WATER HEATER 100L & 150L AIR MANUAL- E-
2
TABLE OF CONTENTS
1SAFETY ............................................................. 4
2 RECOMMENDATIONS .................................... 7
2.1 - Storage ....................................................................................................7
2.2 - Transport.................................................................................................7
2.3- Contents of packaging........................................................................7
2.4 - Unpacking..............................................................................................7
2.5- Symbols used.........................................................................................7
3 INTRODUCTION ............................................. 8
3.1 - Dimensions ............................................................................................8
3.2 - Technical characteristics and Performances..............................9
3.3 - EU declaration.......................................................................................9
4 INSTALLATION.............................................. 10
4.1- Set-up......................................................................................................10
4.1.1- Installation site .........................................................................................................10
4.1.2 - Positioning................................................................................................................10
4.1.3 - On-ground installation.........................................................................................10
4.1.4 - Wall mounting .........................................................................................................10
4.1.5 - Options.......................................................................................................................11
4.1.5.1 - Tripod for on-ground installation...................................................11
4.1.5.2 - Wall fastening brackets........................................................................11
4.2- Air connections....................................................................................11
4.2.1- Air intake and exhaust in unheated premises (10m² minimum)
insulated from neighbouring heated rooms................................................12
4.2.1.1 - In the same room as the appliance ................................................12
4.2.1.2- Exterior air exhaust using Ø80 PVC pipe........................................12
4.2.1.3 - Exterior air exhaust through a chimney ........................................12
4.2.1.4 - In an adjoining room, with vertical air ducts ...............................13
4.2.2 - Connection to air exhaust (Ø80mm) and intake (Ø125mm)
for ambient* or exterior air.............................................................................................13
4.2.2.1- Installation with lateral or rear ducts Ø80/125.............................13
4.2.2.2 - Installing with lateral air ducts..........................................................14
4.2.2.3 - Installing with lateral air ducts.........................................................15
4.2.2.4 - Installation with lateral air ducts and elbow outlet...................16
4.2.2.5 - Installation with lateral ducts at distance «C»
above the appliance.............................................................................17
4.2.2.6- Installation by vertical duct Ø80/125 ..............................................17
4.2.3- Piping accessories ...................................................................................................19
4.2.3.1 - For air duct connection onto ambient or exterior air..............19
4.2.3.2 - For connection with a Ø80 PVC pipe ..............................................19
4.2.3.3 - Essential accessories for air duct connection
or air exhaust connection using a Ø80 PVC pipe.......................19
4.3 - Hydraulic connections...............................................................................19
4.4 - Condensates drainage.....................................................................20
4.5 - Electrical connections......................................................................21
4.5.1 - External control.......................................................................................................21
4.5.1.1 - Peak/o-peak hours contact..............................................................21
4.5.1.2 - Controlled ventilation..........................................................................21
4.5.1.3 - Connection to electricity provider...................................................21
4.5.1.4 - Connection to the PV function .........................................................22
5 SETUP AND USE..........................................22
5.1 - Control panel.......................................................................................22
5.2 - Setting the language........................................................................23
5.3 - Setting the date and time...............................................................23
5.4 - Setting the desired water temperature.....................................23
5.4.1 - PV mode not activated............................................................................23
5.4.2 - PV mode activated....................................................................................23
5.5 - Holiday/ temporary standby mode.......................................................24
5.6 - BOOST mode
(for occasional use and for guaranteed comfort).............................24
5.7 - Electric mode
(for operation using only the electrical back-up)..............................24
5.8 - Programming ......................................................................................24
5.9 - INSTALLER menu................................................................................25
5.9.1 - PV mode.....................................................................................................................25
5.9.2 - Adjusting the operating settings......................................................................25
5.9.2.1 - ANTI-BACT-anti-legionellosis cycle-...................................................25
5.9.2.2 - fan mode -Fan mode-............................................................................26
5.9.2.3 - T°C MINI -Minimum temperature- ...................................................26
5.9.2.4 - load shedding -Degree of authorisation during peak hours..26
5.9.2.5 - max. time -Max. heating time-.............................................................26
5.9.3 - Locking the keyboard...........................................................................................26
5.9.4 - Resetting parameters............................................................................................27
5.9.5 - Reading data ............................................................................................................27
5.9.6 - Counters.....................................................................................................................27