GENERAL FITTING GUIDE
for BATH SHOWER MIXERS
& BATH FILLERS
RUBBER WASHER
BACK NUT
GUARANTEE & AFTERCARE
When installing or using tools, extra care must be taken to avoid damaging the finish or fitting.
To maintain the appearance, please ensure it is cleaned regularly using a clean soft damp cloth
only. Abrasive cleaners or detergents must not be used as they may cause surface deterioration.
The company provides a guarantee against faulty material or manufacture excluding serviceable
parts, providing they have been installed, cared for and used in accordance with our instructions.
The company reserves the right to continually evolve its product lines without notification.
The company will not accept any liability regarding specification changes and their consequences
unless previously quoted by the company in writing.
WATER SUPPLY REGULATIONS
This product has been manufactured to comply with the appropriate BS EN Standards and to
conform to Water Supply Regulations 1999.
EARTH BONDING
Earth any new pipework satisfactorily (Seek expert advice if in doubt).
PRODUCT SHOWN WILL VARY
DEPENDING ON MODEL
INLET CONNECTOR
INSTALLATION PROCEDURE
1. Prior to installation please ensure all the supply pipes have been flushed through to remove any debris and
then ensure the water supply is turned off.
2. We strongly recommend the fitting of isolation valves to the inlet feeds for ease of future maintenance.
3. Ensure you have all the relevant tools before commencing the installation and take note of any specific
markings on the product to make sure they are installed correctly.
4. Carefully assemble new fitting onto sanitary ware / bath. Do NOT over tighten as this may cause damage to
the fitting and/or the sanitary ware / bath. Remember to install the 'O' ring or washer between the mixer body
& sanitary ware / bath.
5. Connect water supply to the inlet connector The HOT supply should always be connected to the LH side
when viewing the fitting from the front.
Please ensure you take note of any specific markings on the product to make sure they are installed correctly
6. Ensure fitting is in the 'open' position and turn on the water supply. Allow the tap to run for a few minutes
to flush out any debris.
7. Check all water feed connections to ensure there are no leaks.
8. Check the assembled fit of the products to the sanitary ware / bath to ensure there is no water ingress that
may cause water damage after installation.