BIOLAN GREYWATER FILTER 125 Parts list manual

70571500
BIOLAN GREYWATER FILTER 125
Instructions for installation, use and maintenance EN
05/2014
Serial No.
Assembler Date of manufacture
Seller's stamp, signature and date of purchase

2

EN-1
EN
Contents
Component list EN-2
Component drawing EN-2
1. Overview EN-3
2. Planning and selecting the location EN-3
2.1Technicalspecications EN-3
2.2 To be located above the ground EN-3
2.3 Location inside a residential building EN-3
2.4Conductingwastewatertothelter EN-4
2.5 Discharge point for the wastewater EN-4
3. Installation EN-4
3.1 Connecting the inlet and outlet sewer pipes EN-4
3.2Puttingtheltermaterialinplace EN-4
3.3 Opening the air valves EN-4
4. Use and maintenance EN-4
4.1 Follow-up of the operation EN-5
4.2Changingtheltermaterial EN-5
4.3Storingthelteroverwinter EN-5
5. Possible malfunctions EN-5
6. Disposal of the product EN-5
Biolan accessories EN-6
About the guarantee EN-6
BIOLAN GREYWATER FILTER 125
Instructions for installation, use and maintenance
The Biolan Greywater Filter 125 is a purifying unit for washing waters of one family,
especially designed for weekend residences. Into the lter may be conducted wash-
ing waters and waters from sauna as well as dishwashing and laundry waters.
The Biolan Greywater Filter 125 shall be installed above the ground. The wastewater
is conducted directly into the lter either by gravity or by pumping. The lter's treat-
ment capacity is 500 litres per day, which in practice is sufcient for 1–5 persons.

EN-2
EN
Part name Number Material
1 Body 571501 PE + urethane insulation
2 Service door 571502 PE + urethane insulation
3 Filter box, 10 pcs 571505 ABS plastic
4 Disk valve, 2 pcs 571506 PP
5 Sleeve pipe 250 x 75 mm 571510 PP
6 Inlet pipe end 571525 PP
7Connectingange 571511 PP
8 Lip seal, 4 pcs 573313 EPDM
9 Plug 75 mm, 8 pcs 571513 PP
10 Latch 571507 RST
11 Counter-piece 571508 RST
In addition to the components illustrated in the component drawing, the Greywater Filter 125 also
includes:
Disk valve body 573308 PP
Attachmentscrewforange 571521 RST
Door seal 15 x 10 mm 573313 EPDM cell rubber
Filling plug for urethane, 15 pcs 571524 PE
Instructions for installation, use and maintenance 571528 Paper
Filter material 5716 Package PE
Spare parts sales: dealers and the Biolan online shop at www.biolan.
Component list
Component drawing

EN-3
EN
1. Overview
The Biolan Greywater Filter 125 is a purifying unit for washing
waters,especiallydesignedforweekendresidences.Thelter
purieswashingwatersandwatersfromsaunaaswellasdish-
washingandlaundrywatersintheproperty.Thepuriermeets
the requirements of the State Council's decree (542/2003) on
treatment of domestic wastewater outside the sewer systems of
the waterworks.
Wastewater from a WC or dry toilet in the property must be con-
ducted into a closed tank or treated otherwise in a due manner.
Rain- or stormwater or drainage water from foundations must
notbeconductedintothelter. If installed in accordance with
theinstructions,thetreatmentcapacityofthelterisabout500
litres per day, which in practice meets the need of washing water
for1–5 people.The treatment capacity ofthe lter material is
good for about 100 days, after which it needs to be replaced in
accordance with the maintenance instructions.
Theoperationofthelterisbasedonmechanicalandbiologi-
calltrationofwastewater.Thedirtinthewastewatersticksto
theorganicltermaterialinthelter.Themicro-organismsliving
onthe surface of the ltermaterial use the impurities astheir
nutrition.
TheGreywaterFilter125comprisestenlterboxesplacedoneon
top of the other. The wastewater is conducted into the uppermost
lterbox.Insidethelter,wastewaterowsbygravitationfromone
lterlayertotheotherthroughtheopeningsintheendofthebox.
In Finland, building a wastewater system or chang-
ing it always requires a building or action permission
from the municipal building authority or a submission
of notication of action. The building permission is
applied by submitting a relevant plan.
2. Planning and selecting the
location
2.1 Technical specications
• dimensions of one module: (width x height x depth) 600 x
1230 x 1000 mm
• pipe connectors for Ø 75 mm sewer pipes
• height difference of inlet and outlet connectors (height of fall):
1040 mm
• capacity: about 500 litres a day
• weightwithoutltermaterial:about75kg
2.2 To be located above the ground
The Biolan Greywater Filter 125 shall be installed above the
ground.Placethelterinalocationwherewaterwillnotgather,
evenwhen there is ooding.The ltercan be installed out of
doors without a cover. The unit is thermally insulated, which
means it tolerates slight frost. If the lter is used in winter, it
must, however, be equipped with the Biolan Heating Cable,
whichisavailableasanoption,ortheltermustbeplacedin
a space, where the temperature stays above zero at all times.
The space required for use and maintenance must be taken
into account when selecting the location. A free space, at least
one metre deep, must be provided in front of the unit for chang-
ingtheltermaterial.Asufcientspacemustalsobeprovided
at the sides and the rear of the unit to enable maintenance of
the outlet connector for the sewer and the adjustment of the air
valves in the rear wall. To ensure the supply of oxygen to the
micro-organisms, the air exchange valves must not be covered
or the air exchange must be arranged in some other way.
2.3 Location inside a residential
building
Biolan Greywater Filters are primarily intended for installation
outofdoors.Ifyouareplanningtoinstallthelterindoorsorin
close proximity to a residential building (for example, under the
terrace), then some maintenance space with its own entrance
should be provided. This space must also be provided with a
oorwelloranearthenoorforpossiblemalfunctions.
Thereplacementairforthe lter is taken from the end of the
discharge pipe and the outlet air is conducted as sewer ventila-
tion to the roof of the building. To avoid odour problems, the air
valves of the unit must be kept closed. The outlet air can also
be conducted through the upper air valve in the rear wall of the
lterintoaseparateoutletairchannel.Iftheunitisinstalledin-
doors,theoutletairchannelshallbettedwithanaspiratorthat
maintainsaslightnegativepressureinsidethelter.
Whenever the Greywater Filter is located in a warm
space in a residential building, or in close proximity
to a residential building, the correct installation must
alwaysbeveriedwiththeexpertinchargeofplan-
ning the HVAC system for the building.
Installation example
Wastewater is conducted into the lter by gravity
Installation example
Wastewater is pumped into the lter

EN-4
EN
2.4 Conducting wastewater to the
lter
Thewastewaterisconducteddirectlytothelteralternativelyby
gravity,byowdrainageorbyapumpwell.Toensureaneven
distribution, the inlet pipe should be provided with a straight
80cm-long part before the branch sleeve (part 7), that reduces
turbulenceoftheincomingwaterow.
If you intend to utilise existing septic tanks during pumping,
these should be in good condition and hermetically sealed. The
operation of the pump must be sequenced using a timer so that
during one sequence the pump will feed at maximum 20 litres
ofwastewatertothelter.Theintervalbetweenthesequences
must be at least 10 minutes. The Biolan Timer, the Submersible
Pump and the Pump Well are available as an option.
2.5 Discharge point for the
wastewater
Conduct the treated wastewater to a suitable discharge point,
for example a stone pocket or an open ditch. When planning,
bear in mind that the discharge of wastewater should be unob-
structed even when the level of the surface water or groundwa-
ter is high. If you route the water to an open ditch, provide the
endofthepipewithaaporanettopreventrodentsorother
small animals from gaining access.
Toxic
Hazardous to
the environ-
ment
Corrosive
Inammable
Oxidizing
3. Installation
Placethelteronarmandevensurfacethatisnotsusceptible
to frost, such as, for example, a bed of gravel or crushed stone
oracastconcreteslab.Theltermustbeinahorizontalposi-
tionbothlengthwiseandlaterallytoallowthewastewatertoow
smoothlyovertheentirecleaningareaoftheltermaterial.
3.1Connecting the inlet and outlet
sewer pipes
Whileinstallinggravityow sewers,asufcientgradient(of at
least 1-1,5 %) needs to be provided to allow the wastewater to
owwithoutobstructionfromtheseweroutlet ofthehouse all
the way to the discharge point.
There are inlet and outlet connectors for 75 mm sewer pipes on
both sides of the lter. Depending on the requirements of the
location, the pipes can be installed on either side. Connect the
sewer pipe coming from the building to the inlet connector at
upperedgeofthelter.Connectthedischargesewerpipetothe
outlet connector at its lower edge. Close the unused openings
using plugs (product number 571513).
Ifthelterwillbeusedinwinter,theinletsewermustbeinsu-
lated. Whether also the outlet sewer needs to be insulated, shall
be considered case by case.
3.2 Putting the lter material in place
The lter material is packed in plastic bags for transportation.
Removetheplasticbags.Riptheltermateriallooseandspread
it evenly across the boxes by tapping it gently. Resulting from
the packaging method, the bags may contain excessive amount
ofltermaterial.Thellinggradeoftheboxissuitablewhenthe
surfaceoftheltermaterialliesabout2cmlowerthanthebrim
ofthebox.Finally,drawtheltermaterialabout5cmtotherear
from the V-openings in the discharge end of the box.
Theltermaterialboxesareidentical,buttheirdirectionshould
be observed – in the uppermost box water ows towards the
rearwall,inthenextboxitowstowardstheservicedooretc.In
thelowermostboxwaterowstowardstherearwall,fromwhere
it falls along the shaped bottom into the discharge sewer.
4. Use and maintenance
The unit must be used and maintained in accordance with the in-
structions, and its operation must be monitored regularly. Main-
tenance of the wastewater system also involves maintenance of
the pump well and the septic tanks, if provided.
Intotheltercanbeconductedwashingwatersandwatersfrom
saunaaswellasdishwashingandlaundrywaters.Theltertol-
erates a small amount of anti-bacterial or chlorine-based agents
that are commonly used for cleaning. Follow the dosing instruc-
tions issued by the manufacturer of the detergent.
Wastewater from a WC or a dry toilet, rain water or stormwater,
or drain water from foundations must not be conducted into the
lter. Toxic chemicals or substances that contain such chemi-
cals, which can kill the micro-organisms that clean the waste-
water, such as drain openers, paints, oils or solvents, must not
beconductedintothelter.Harmfulchemicalscanbeidentied
from the markings on their packaging:
3.3 Opening the air valves
Theoperation of the lter isbasedonactivityof the micro-or-
ganisms. These micro-organisms need oxygen to survive, and
therefore, it is vital to provide the lter with sufcient air ex-
change. There are two adjustable disk valves for air exchange in
the rear wall of the modules. Set both disk valves of the module
about 10–20 mm ajar for the summer. In winter keep the valves
only slightly ajar (about 5–10 mm). If you have realised the air
exchange by means of sewer ventilation, keep the air valves
completely closed to avoid odour problems (see point 2.3).

EN-5
EN
4.1 Follow-up of the operation
Checktheoperationofthelteratleasttwiceduringeveryoper-
atingseason.Awell-functioninglterdoesnotgiveoffastrong
smell,theltermaterialinitremainsmoistandtheexitingwater
isclearandodourlessanddoesnotcontainasignicantamount
of solid matter.
Check that
1. wastewaterisowingsmoothlyinbothmodulesthroughall
the openings of the box
2. theltermaterialhasbeendrawntoadistanceofabout5
cm from the openings in the discharge end of the box
3. the air exchange valves are in the correct position and the
airisowingwithoutobstruction
4. the visible connections of the sewers are in order
5. thepuriedwastewaterisowingfreelyoutofthelter
4.2 Changing the lter material
Normally,theltermaterialoftheltermustbereplacedevery
100 days of operation. Only material, specially intended for use
intheBiolanlters,shallbeusedasltermaterial..BiolanOy
does not guarantee the purication capacity of the unit if any
otherltermaterialisused.
1. Changetheltermaterialofallboxesatthesametime.
2. Open the service door of the lter and draw out the lter
material boxes keeping them in a level position.
3. Emptytheltermaterialintothecompostoruseitascover
soil for ornamental plants.
4. Relltheboxeswithnewltermaterial.Riptheltermate-
rial loose and spread it evenly across the box by tapping it
gently.Finally,drawtheltermaterialabout5cmtotherear
from the V-openings.
5. Check the inlet and outlet connectors for wastewater and
clean them.
6. Returntheboxeslledwithltermaterialtothelterunit.he
ltermaterialboxesareidentical,buttheirdirectionshould
be observed – in the uppermost box water ows towards
the rear wall, in the next box it ows towards the service
dooretc.Inthelowermostboxwaterowstowardstherear
wall, from where it falls along the shaped bottom into the
discharge sewer.
7. Make sure that the unit is on a level both lengthwise and
laterally so that wastewater will be evenly divided into both
modulesandowssmoothlyfromonelterboxtotheother.
8. Closetheservicedoorsoftheltercarefully.
9. Write down the service measures that were taken.
4.3 Storing the lter over winter
Leavetheltermaterialboxesinsidethelter.Freezingofthe
ltermaterialdoesnotdamagetheunit.Iftheltermaterialis
still frozen when the operation starts in spring, thaw it by pouring
warm,clearwaterthroughthelter.
5. Possible malfunctions
The lter material box remains lled with water
Theltermaterialboxshalldrainoffbetweenthetimesofop-
eration.Ifthisisnotthecase,theltermaterialmaybeclogged.
1. Makesurethattheltermaterialhasbeendrawntoadis-
tance of about 5 cm from the openings in the discharge end
ofthebox.Asnecessary,pushtheltermaterialslightlyto
the rear.
2. Checktheageoftheltermaterial.Inheavyandcontinu-
oususe,theltermaterialmaygetcloggedalreadyduring
therst100daysofoperation.Replacetheltermaterial,
if necessary.
Flies in the lter
TheairopeningsoftheGreywaterFilterarettedwithynets
ofsmallmeshsize.Despitethenets,smalliesorgnatsmay
sometimesestablishthemselvesinthelter.Ifiesareinterfer-
ingwiththelter,youcandoawaywiththemusingapyrethrin-
based insecticide. Consult your local garden centre to select a
suitable product.
6. Disposal of the product
The raw materials used are presented in the component list (see
page 4). Dispose of each part as prescribed. Always follow the
regionalandcollecting-point-specicinstructions.
PE = polyethylene
to collection of energy waste or recycling of plastic
PP = polypropylene
to collection of energy waste or recycling of plastic
RST = stainless steel
to recycling of metal
Paper
to recycling of paper

EN-6
EN
Biolan Oy
P.O. Box 2, FI-27501 KAUTTUA
Tel. +358 2 5491 600
www.biolan.
Biolan accessories
Availability varies from country to country. Consult your local dealer for details.
Biolan Filter Material
TheltermaterialfortheGreywaterFilter
ismadeofWarnstoraorCalliergonmoss
collected in connection with restoration of
lakes. The moss, which has grown under
conditions rich in nutrients, makes an ef-
cientandnaturalmaterialforpurication
of waste water.
Product no. 70574100,
HVAC number 3623604
Biolan Sampling Well
The Biolan Sampling Well is an accessory that
makes it easier to supervise the operation of the
wastewater treatment system, and enables reli-
able sampling of the wastewater. It is also suitable
for an underdrain well or a pump well.
Product no. 5713,
HVAC code 3623605Biolan
About the guarantee
The Biolan Greywater Filter 125 is guaranteed for ve years
1. The guarantee is valid from the date of purchase and cov-
ers possible defects in material and workmanship. The
guarantee does not cover any indirect damage.
2. Biolan Oy retains the right to decide about repairing or re-
placing damaged parts at its discretion.
3. Any damage resulting from careless or forcible handling of
the device, from failure to observe the operating instruc-
tions, or from normal wear, will not be covered by this guar-
antee.
4. Thebuyermustpresentadulylledoutguaranteecerti-
cate or a detailed purchase receipt when submitting claims
under the guarantee.
For matters related to the guarantee, please consult Biolan Oy
directly.
Pumping Package
The Biolan Pumping Package is an acces-
soryforplaceswheregravityowdrainage
ofthewastewatertothelterisnotpossi-
ble. By means of the Timer the wastewa-
terisfedfromthePumpWelltothelter
in suitable doses. The Pumping Package
comprises three parts: Timer, Submersible
Pump and Pump Well. The parts are also
available separately.
Product no. 70577300,
HVAC code 3623606
Comprises:
Timer 70577000,
HVAC number 3623608
Submersible pump 70577100,
HVAC number 3623609
Pump Well 70577200,
HVAC number 3623607
Table of contents
Other BIOLAN Water Filtration System manuals
Popular Water Filtration System manuals by other brands

Swift
Swift SGF RV manual

JBL
JBL CristalProfi m greenline manual

Thermo Scientific
Thermo Scientific 50135178 AFT 3 operating instructions

Hi-Line
Hi-Line ConSEP100 Instruction and maintenance manual

Clarke
Clarke CAT161 Fitting & Maintenance Instructions

Franklin Water Treatment
Franklin Water Treatment PIF1 Series Installation instructions and owner's manual