Bodine GTD20A User manual

READ AND FOLLOW ALL SAFETY INSTRUCTIONS
! IMPORTANT SAFEGUARDS ! WHEN USING ELECTRICAL EQUIPMENT, BASIC
SAFETY PRECAUTIONS SHOULD ALWAYS BE
FOLLOWED, INCLUDING THE FOLLOWING:
SAVE THESE INSTRUCTIONS
© Philips Emergency Lighting
236 Mt. Pleasant Rd. • Collierville, TN 38017-2752 • Tech Support 888-263-4638 • Fax 901-853-5009 • www.philips.com/bodine
70100047
BRANCH CIRCUIT
TRANSFER SWITCH/LIGHTING CONTROL DEVICE
Installation Instructions
1. This product is for use with generator-supplied (or central inverter system-supplied) lighting loads. Make sure all
connections are in accordance with the National Electrical Code and any local regulations.
2. To reduce the risk of electric shock, disconnect all power sources before servicing.
3. This product is for field installation.
4. This product is for use in indoor or damp locations where the ambient temperature is -20ºC minimum, +55ºC
maximum.
5. This product is UL Listed as either a Branch Circuit Emergency Lighting Transfer Switch (BCELTS) under UL 1008
or a Switch Bypass under UL 924. Use the proper wiring diagram in the appropriate section of these instructions.
6. An unswitched, normal AC power source (120 through 277 VAC, 50/60 Hz) and a direct, separate connection to a
generator-supplied or central inverter system-supplied emergency panel are required.
7. The use of accessory equipment not recommended by the manufacturer may cause an unsafe condition.
8. Do not use this product for other than intended use.
9. Servicing should be performed by qualified service personnel.
GTD20A
CAUTION: THIS UNIT HAS MORE THAN ONE POWER SUPPLY CONNECTION POINT. TO REDUCE
THE RISK OF ELECTRIC SHOCK, DISCONNECT ALL POWER SOURCES BEFORE
INSTALLING OR SERVICING THIS UNIT.
NOTE: BEFORE INSTALLING THE CONTROL DEVICE, MAKE SURE THAT THE NECESSARY BRANCH
CIRCUIT WIRING IS AVAILABLE. AN UNSWITCHED SOURCE OF NORMAL POWER IS REQUIRED. A SEPARATE
CONNECTION TO A GENERATOR-SUPPLIED (OR CENTRAL INVERTER SYSTEM-SUPPLIED) CIRCUIT MUST ALSO
BE PROVIDED.
SERVICE BY QUALIFIED PERSONNEL ONLY
06/19/18
UL 1008-BCELTS UL 924-Switch Bypass

CAUTION: THIS UNIT HAS MORE THAN ONE POWER SUPPLY CONNECTION POINT. TO REDUCE
THE RISK OF ELECTRIC SHOCK, DISCONNECT ALL POWER SOURCES BEFORE
INSTALLING OR SERVICING THIS UNIT.
NOTE: BEFORE INSTALLING THE CONTROL DEVICE, MAKE SURE THAT THE NECESSARY BRANCH CIRCUIT
WIRING IS AVAILABLE. AN UNSWITCHED SOURCE OF NORMAL POWER IS REQUIRED. A SEPARATE CONNECTION TO
A GENERATOR-SUPPLIED (OR CENTRAL INVERTER SYSTEM-SUPPLIED) CIRCUIT MUST ALSO BE PROVIDED.
STEP #1 MOUNTING THE GTD20A
> FAMILIARIZE YOURSELF WITH THESE INSTRUCTIONS BEFORE BEGINNING INSTALLATION.
> Mount GTD20A in a convenient location using appropriate hardware (not supplied). See Illustration 1 for
typical installation. DO NOT MOUNT WITH LID FACING DOWN (See Illustration 2).
ILLUSTRATION 1
WALL MOUNTING
STEP #2 INSTALLING THE GTD20A
> Disconnect AC power from all supply circuits.
> Remove GTD20A lid and install necessary conduit and wiring (not supplied) to the GTD20A.
> Refer to the illustrations on the following pages for proper wiring connections and choose the correct
illustration for your application.
> Note: When using Class 2 power limited circuits, (for example, 0-10 VDC dimming connections)
remember to keep this wiring separate from high voltage wiring by using separate conduit and the
enclosure knockout provided.
> Replace GTD20A lid and secure.
INSTALLATION
2
ILLUSTRATION 2
FACE DOWN MOUNTING (NOT APPROVED)

ILLUSTRATION 3
GTD20A as a BCELTS Device
*NOTE: Wire gauges for ALL leads terminating at T2 should be #18 AWG.
Wire gauges for all other connections should be sized according to total connected lighting load.
Ground unit using supplied green lead wire.
ILLUSTRATION 4
GTD20A as a BCELTS Device for a Dimming Rack
3
INSTALLATION
GTD20A
ELECTRONICS
COVER
4 5 6 71 2 3
T1*
GTD20A TERMINAL BLOCKS
T2*
CKT BKR
PANEL
EMERGENCY
LOCAL
SWITCHING
MEANS
LIGHTING
LOAD
UP TO
20 A
1 2 3 4 5 6 7
HOT
NEUTRAL
NORMAL
CKT BKR
PANEL
HOT
NEUTRAL
HOT
NEUTRAL
* WIRE GAUGES FOR ALL LEADS
TERMINATING AT T2 SHOULD BE #18 AWG.
* JUMPER CONNECTIONS ON T1 AND T2 ARE
CONTRACTOR INSTALLED.
4 5 6 71 2 3 1 2 3 4 5 6 7
DIMMING
RACK
GTD20A
ELECTRONICS
COVER
T1*
GTD20A TERMINAL BLOCKS
T2*
EMERGENCY
CKT BKR
PANEL
LIGHTING
LOAD
UP TO
20 A
HOT
NEUTRAL
NORMAL
CKT BKR
PANEL
HOT
DIMMED HOT
NEUTRAL
NEUTRAL
HOT
NEUTRAL
* WIRE GAUGES FOR ALL LEADS
TERMINATING AT T2 SHOULD BE #18 AWG.
* JUMPER CONNECTIONS ON T1 AND T2 ARE
CONTRACTOR INSTALLED.
WIRING DIAGRAMS for UL 1008 - BCELTS Applications

ILLUSTRATION 5
GTD20A as a BCELTS Device with
a 3-wire Dimming System
ILLUSTRATION 6
GTD20A as a BCELTS Device with
a 0-10 VDC Dimming System
4
INSTALLATION
EMERGENCY
CKT BKR
PANEL
SWITCHED
HOT TO
DIMMING
DRIVERS
DIMMED
HOT TO
DIMMING
DRIVERS
SWITCHED HOT
DIMMED HOT
NEUTRAL TO
DIMMING
DRIVERS
DIMMING
CONTROL
GTD20A
ELECTRONICS
COVER
T1*
GTD20A TERMINAL BLOCKS
T2*
HOT
NEUTRAL NORMAL
CKT BKR
PANEL
HOT
NEUTRAL
4 5 6 71 2 3 1 2 34 567
* WIRE GAUGES FOR ALL LEADS
TERMINATING AT T2 SHOULD BE #18 AWG.
* JUMPER CONNECTIONS ON T1 AND T2 ARE
CONTRACTOR INSTALLED.
4 5 6 71 2 3
TO DIMMING
DRIVER
PURPLE
LEADS TO DIMMING
DRIVER
GRAY
LEADS
PURPLE
GRAY
1 2 3 4 5 6 7
GTD20A
ELECTRONICS
COVER
T1*
GTD20A TERMINAL BLOCKS
T2*
EMERGENCY
CKT BKR
PANEL
LIGHTING
LOAD
UP TO
20 A
HOT
NEUTRAL
NORMAL
CKT BKR
PANEL
HOT
NEUTRAL
HOT
NEUTRAL
* WIRE GAUGES FOR ALL LEADS
TERMINATING AT T2 SHOULD BE #18 AWG.
* JUMPER CONNECTIONS ON T1 AND T2 ARE
CONTRACTOR INSTALLED.
0-10 VDC
DIMMER
BLK
BLK
WHT (IF PROVIDED)
*NOTE: Wire gauges for ALL leads terminating at T2 should be #18 AWG.
Wire gauges for all other connections should be sized according to total connected lighting load.
Ground unit using supplied green lead wire.
Use knockout provided on enclosure and separate conduit to route the 0-10 VDC dimming
control wires (see Note in Step #2 on page 2).
WIRING DIAGRAMS for UL 1008 - BCELTS Applications

ILLUSTRATION 7
GTD20A as a Switch Bypass Device
ILLUSTRATION 8
GTD20A as a Switch Bypass Device with a 3-wire Dimming System
*NOTE: Wire gauges for ALL leads terminating at T2 should be #18 AWG.
Wire gauges for all other connections should be sized according to total connected lighting load.
Ground unit using supplied green lead wire.
INSTALLATION
5
4 5 6 71 2 3
NORMAL
CKT BKR
PANEL
EMERGENCY
CKT BKR
PANEL
LIGHTING
LOAD
UP TO
20 A
1 2 3 4 5 6 7
LOCAL
SWITCHING
MEANS
GTD20A
ELECTRONICS
COVER
T1*
GTD20A TERMINAL BLOCKS
T2*
HOT HOT
NEUTRAL NEUTRAL
* WIRE GAUGES FOR ALL LEADS
TERMINATING AT T2 SHOULD BE #18 AWG.
* JUMPER CONNECTIONS ON T1 AND T2 ARE
CONTRACTOR INSTALLED.
4 5 6 71 2 3
NORMAL
CKT BKR
PANEL DIMMED
HOT TO
DIMMING
DRIVERS
SWITCHED
HOT TO
DIMMING
DRIVERS
NEUTRAL TO
DIMMING
DRIVERS
EMERGENCY
CKT BKR
PANEL
1 2 3 4 5 6 7
DIMMING
CONTROL
GTD20A
ELECTRONICS
COVER
T1*
GTD20A TERMINAL BLOCKS
T2*
HOT
DIMMED HOT
HOT
NEUTRAL
SWITCHED HOT
NEUTRAL
* WIRE GAUGES FOR ALL LEADS
TERMINATING AT T2 SHOULD BE #18 AWG.
* JUMPER CONNECTIONS ON T1 AND T2 ARE
CONTRACTOR INSTALLED.
WIRING DIAGRAMS for UL 924 - SWITCH BYPASS Applications

The GTD20A uses an internal relay contact to control the AC power feeding the lighting load. When the generator (or
central inverter) supplies AC power to the lighting fixture, the GTD20A bypasses the local switching means or dimmer.
This ensures the lighting load will be energized at full lumen output during generator (or central inverter) operation
regardless of switch position or dim setting.
No routine maintenance is required to keep the GTD20A functional. However, it should be checked periodically to
ensure that it is working properly. Note: Make sure to disconnect both the normal and emergency panel circuit breakers
before servicing.
! REFER ANY SERVICING INDICATED BY THESE CHECKS TO QUALIFIED PERSONNEL !
STEP #3 FOLLOW-UP & QUICK TEST OF THE INSTALLATION
> Mark each designated emergency lighting fixture with the warning labels provided (20 labels are provided
with each unit).
> Apply AC power to all circuits. The green "Normal Power Present" and the red "Emergency Power Available"
LED's should be illuminated.
> Perform a quick test as described on the unit label to check for proper operation. When the test
button is depressed, the green "Normal Power Present" LED should extinguish and the controlled
lighting load should illuminate regardless of the local switch position provided emergency power is
available (check red LED).
> During a quick test using a GTD20A with a dimming system, the lighting load should illuminate at
full lumen levels when the test switch is depressed regardless of the lumen level during normal operation.
> The entire generator (or central inverter) system, including all designated lighting loads, should be
exercised to ensure proper operation (e.g., power up the generator, throw the main automatic transfer
switch to the generator position, and check the lighting loads to verify they are operating properly from
the generator/central inverter supply).
OPERATION
MAINTENANCE
6
ILLUSTRATION 9
WIRING DIAGRAM for UL 924 - SWITCH BYPASS Applications
INSTALLATION
4 5 6 71 2 3
NORMAL
CKT BKR
PANEL
SWITCHED
HOT TO
DIMMING
DRIVERS
NEUTRAL TO
DIMMING
DRIVERS
EMERGENCY
CKT BKR
PANEL
1 2 3 4 5 6 7
DIMMING
CONTROL
GTD20A
ELECTRONICS
COVER
T1*
GTD20A TERMINAL BLOCKS
T2*
HOT
PURPLE
HOT
NEUTRAL
SWITCHED HOT
NEUTRAL
* WIRE GAUGES FOR ALL LEADS
TERMINATING AT T2 SHOULD BE #18 AWG.
* JUMPER CONNECTIONS ON T1 AND T2 ARE
CONTRACTOR INSTALLED.
TO DIMMING
DRIVER
PURPLE
CONNECTIONS
(0 - 10VDC)
TO DIMMING
DRIVER
GRAY
CONNECTIONS
(0 - 10VDC)
BLK BLK
GRAY
WHT (IF PROVIDED)
GTD20A as a Switch Bypass Device with a 0-10 VDC Dimming System
Table of contents
Other Bodine Controllers manuals
Popular Controllers manuals by other brands

ABB
ABB PSTX30 370 Series installation instructions

Topcon
Topcon ISOBUS Artemis Operation manual

Watlow
Watlow MINICHEF 2000 Application guide

NOVAK
NOVAK ELEKTRA operating instructions

RoboteQ
RoboteQ Dual Channel Digital Motor Controller AX2550 Quick start manual

PlaneWave Instruments
PlaneWave Instruments EFA instructions