4
FOR THE INSTALLER ................................................................................................... 39
Important information to the installer............................................................... 40
Checklist ........................................................................................................ 40
What the shipment includes............................................................................. 41
Dimensions and plumbing connections............................................................. 42
The heat pump and collector hose in general..................................................... 43
Transporting the heat pump..................................................................................................................................43
Positioning the heat pump.....................................................................................................................................43
Maximum working temperatures ..........................................................................................................................43
Minimum working temperatures...........................................................................................................................43
Fit the particle filter ..............................................................................................................................................43
Collector hose ........................................................................................................................................................44
Preparations before connection........................................................................ 47
Moving the heat transfer fluid pipe for side entry...................................................................................................47
Supplementing the heat pump with a groundwater system.....................................................................................50
Connection to groundwater system: electrical connection.......................................................................................51
Connecting the heat pump to the heating system ............................................... 51
Connecting to the heating system without a bypass:................................................................................................52
Connect heat pump LWM model to the heating system...........................................................................................53
Connect heat pump LW model to the heating system..............................................................................................54
LWM model: individual temperature control in each room, increasing volume of internal water and bypass.........55
LW model: individual temperature control in each room, increasing volume of internal water and bypass............56
LWM model: Increasing volume of internal water without bypass..........................................................................57
LW model: Increasing volume of internal water without bypass .............................................................................58
Filling water in the heating system ........................................................................................................................59
Filling the heat transfer fluid in the collector hose .................................................................................................59
Connecting the heat pump to the power supply ................................................. 62
External connections to the heat pump ..................................................................................................................63
Connecting the general alarm, external input and load monitor............................................................................64
Installer and service menu (I/S) ...................................................................... 65
How to use the control panel .................................................................................................................................65
Commissioning the heat pump......................................................................... 66
Menu displays you might need to adjust or check ...................................................................................................67
Drying program for floor tile .................................................................................................................................70
Manual test run of the heat pump .........................................................................................................................71
Start the heat pump with only additional heat.......................................................................................................71
Important points to check after start up.................................................................................................................71
Technical information...................................................................................... 74
The heat pump’s factory settings ............................................................................................................................74
Sensor table...........................................................................................................................................................74
Hot water cylinder for ECOLANE Heat Pump ......................................................................................................75
Technical information for three-phase models........................................................................................................76
Technical information single-phase models............................................................................................................77
Table of Contents