BPC CX Installation and operation manual

Operating and Commissioning Instruction for
Power Factor Control Relay Type CX & CXM
Common Point and Volt free Switching
INSTALLATION Page 2
FUNCTION SWITCH CONTROL POSITIONS Page 2-4
COMMISSIONING Page 4-5
ALARM FUNCTIONS Page 6
DATA TRANSMISSION Page 6
FAN CONTROL TEMP. SENSOR OPTION Page 6
TWO TARGET PF SETTING OPTION Page 6
COMBI FILTER DETAILS OPTION “K” Page 7
CXM RELAY READING AND SETTING CT/VT FOR CORRECT MEASUREMENTS Page 7
WIRING DIAGRAM Page 8
Fan Control
DIP switch
(see p6)
Function Switch
LED Indication
Calling for Capacitor
steps in
LED Indication
Calling for Capacitor
steps out
LED Indication
Calling for Capacitor
steps in
LED Indication
Calling for Capacitor
steps out
Scroll Buttons
CXM
With Multi - Meter
CX
BPC Boddingtons Pwer Controls
UNIT 1, ZONE D CHELMSFORD ROAD INDUSTRIAL ESTATE, GREAT DUNMOW, ESSEX CM6 1XG, UK
Tel: +44 (0) 1371 876543 Fax: +44 (0) 1371 875460
Website: www.boddingtonspowercontrols.co.uk Email: info@boddingtonspowercontrols.co.uk
BODDINGTONS
Power Controls

Installation
As with all electrical equipment, the appropriate specifications governing electrical installation must be
followed when power factor correction equipment is installed. When removing the front nameplate to adjust
the function switch and DIP switches, always ensure that your body is not carrying any electrostatic charge.
This can be accomplished by simply touching an earthed object, such as the switchboard metal casing to
dissipate any electrical charge before removing the cover plate.
1 Check that the measurement and control voltage, supply frequency and current transformer rating comply
with the ratings given on the back of the relay.
2 Mount the relay in the switch panel (cut out size 138 x 138mm) and retain the relay in position using the
ratchet plastic clips included with the relay.
3 Connect in accordance with the wiring diagram. Pay special attention to the cross section size of the
CT connections. We recommend 2.5 sq.mm copper conductor for runs up to 10 mtrs. The CX relay will
constantly monitor the supply voltage and if this falls below 70% of nominal all capacitor contactors will be
automatically switched out. Note that the control voltage to the supply voltage to the contactor coils must be
taken from one of the phases used for the supply voltage to the relay (L2-L3). The spring terminal can be
pushed open by hand – or with a 2.5mm blade screwdriver. The steel rear cover of the relay must be
earthed, at the earth tag.
4 CT outputs of 1A or 5A Class 1 are fed into the two orange terminals marked K-L. When using the CXM
multi-meter version the max. CT ratio is 20000/5 or 4000/1. Note that the CX and CXM relays are sensitive
down to a current of 0.010 A (10 mA) reactive. The CT input ratio of 1A or 5A is self selecting according
to the max CT current measured. The CX relay is therefore sensitive enough to switch a 25 kvar capacitor
step at 415V utilising a 10,000/5 CT, or 5 kvar step using a 10000/1 CT ratio, provided the max total
current from the CT does not exceed 1 amp.
Function Switch Control Positions
The function control switch (H3) is located behind the removable front plastic nameplate. For the CX relay there
are two push buttons ( + & - ) located either side of the function switch. For the CXM (multi-meter version)
the + & - keys are on the front of the relay. They also allow you to roll through the different measured values of
U-I-P-Q-S-F-COSPHI.
If option "L" (fan control) is fitted there will be 2 additional DIP switches (S1/S2) located behind the name plate
to select the 4 temperature alarm levels of 30-35-40-45 deg.C.
Factory setting of the function switch is 0 off - see below.
.
Multifunction Switch (H3) Rotate the switch to the position required with a small screwdriver
0 All steps switched off. If the relay is energised, when the function switch is turned to this position, the steps
will be switched off after a time delay of 20 secs. If the + - keys are used in this position, you can select the
threshold level at which you want the relay to show a capacitor step is defective. You can set this value
between 10…..60% of the first recorded kvar value of each step. The factory setting is 50%, so the display
will alternate between "50" and "0".
1p.f. target set, selectable in the range of 0.70 lag …1…0.90 lead; Lag is prefixed i Lead = c in display.
Factory setting = 1.0
2 Switching time delay in secs, selectable from 5 ... 1200 secs. Pushing button + or – for longer than 2 sec.
enables rapid selection.
Factory setting: 60 secs.
3 Fully automatic control of power factor correction bank. LED Display will indicate the system power
factor with either I for inductive or C for capacitive load (updated each 3 sec.) A flashing dot in display above
the signs either + or – indicates, that the regulator is selecting a suitable capacitor, if available, to meet the
reactive load demand. This adjustment is made every 3 secs.
The CXM relay will indicate COSo - Power factor, U-volts, I –Amps, P-kW, S – kVA , Q – kvar, F - Hz
4
Manual operation
"H" will show in the display to indicate the relay is in "hand" control. Steps are switched in/out using the +/ -
buttons. The selected time delay per step (pos. 2) will be followed. This is useful when commissioning a
bank where there is low or little load. Using the manual control steps can be switched in so as to create a
leading power factor. Then put the function switch back to pos.3, for auto control and the relay should adjust
automatically to the target pf. selected in Pos 1.
2

5 Selection of Step Limitation
This position limits the number of steps in circuit. e.g. if you have a CX12, twelve step controller, but only
have nine steps connected, adjust this setting to 9. Do not set to more than the number of steps on the
relay as the defective step alarm will be triggered.
6 Automatic display of failed Capacitors
Indication of either failed capacitor steps or unengaged outputs. Indication "Cd 05" (Capacitor Defect No.5)
alternating with "Cd 09" indicates, that steps 5 and 9 are failing. "Alarm" (AL_ _) will be shown in the
display. Once the fault on the failed steps has been rectified, the alarm signal is cleared by pressing
buttons + and – for longer than 20 sec. "Cd 0" will show in the display to indicate the alarm is cancelled
and there are no defective capacitors. (see also (Pos. 9 below)
7 Counter for the number of times each capacitor step contactor has switched.
The number of switching operations for each contactor are shown in the display, e.g. "OC_ 4" for capacitor
step No.4 for 2 sec., then "248". This indicates, that contactor no. 4 has completed 248 switching operations.
Other contactors can be selected by using the +/- buttons. The micro-processor stores the data for
every 10 contactor switching operations. The stored data of all steps can be cancelled by depressing the +/-
buttons together for more than 20 sec. Automatic control is active all the time!
8 Indication of Step kvar
This is a very useful way of keeping a check on capacitor step kvar outputs over a period of time.
The value indicated on display is a unit of value proportional to the step size, but is not the actual kvar.
This display will show for example, "CC 10" for the 10th step, followed by 2 numbers e.g. "L 74" and "F
84".
"F" stands for the first sensed capacitor size during commissioning and "L" for the last measured value
after, let´s say several months or years. In this way a check can be kept on the change in kvar output of
each step, if any. If the selected defective threshold level in pos. 0, is exceeded due to a failed capacitor or
blown fuses, the CX or CXM eliminates this step from the control procedure and alarm "AL", appears in
the display. The "L" and "F" values for each step can be scrolled through with + or – button, and this is a
good check to do on regular capacitor bank maintenance. The stored values can be re-set by pushing
buttons + and – together for longer than 20 sec. The regulator will store each step from the moment of
re-set. Automatic mode remains active whilst these checks are made.
The CXM regulators fitted with multi-meter option "M" (Indication of energy data) displays the measured
capacitor sizes in real kvar provided the correct CT ratio factor has been inserted (see page 5)
9 Selecting and cancelling the alarm you require
Four alarm types are available and these are selected by scrolling through using the + - buttons, when the
function switch is in position 9.
"A__0" All alarm indications cancelled. No alarm will appear in the display.
"A__1" Alarms will be shown , but will cancel themselves once the position has rectified itself.
"A__2" Any alarm recorded will remain in the display until the fault is rectified and the alarm is manually
cancelled by pressing + - together for at least 20 secs.
"A_3" The alarm stored on the display is cancelled by pressing the + - buttons together for at least 5
secs.
This will re-set alarms for :
Low PF for at least 75 times step switching time, – display indication "AL_"
Over Temperature if "L" option is fitted – display indication "HA" (Heating Alarm)
If both alarms are operating – i.e. Low PF and High Temp, the display will show "AH"
Once the alarm is cancelled the display will show "ArES"( alarm reset)
NB: if the Defective capacitor Step alarm has operated - with "AL_" in the display, this can only be
cancelled by going to Pos.6 on the function switch and pressing + - together for at least 20 secs,.
ASelection of a 2nd Power Factor Target, or an alarm
Some tariffs allow a lower power factor at certain times. For example at night in order to compensate for a
leading pf on the system caused by the Capacitance of buried cable networks in cities. This position of the
function switch allows you to select a second target PF, and this second target PF will be triggered by
applying voltage between 150-240V 50/60Hz on NT1/NT2 – see wiring diagram. If option "L" is fitted, the
lower PF will automatically come into operation if the ambient temperature rises above 57º C.
3

B Selection of asymmetrical Switching Time Delay.
Rapidly changing reactive loads can cause excessive wear on contactors ( eg Arc Welders, Crushers or
Strip Mills). In this case it is useful to use assymetrical switching of FAST IN/SLOW OUT. The ratio is set
using the + - buttons. If we have "1" (Factory setting) we have equal times for switch in and switch out , as
selected in pos. 2. By selecting any number between 1…..99 we can vary the switch out time up to 99 times
the switch in time. i.e. if we set to "10" (display Y_10) and have selected a switch time of 5 secs., in Pos
2, we switch in after 5 secs of lagging kvar demand, but only switch out after the leading kvar has exceeded
the threshold for 5 x 20 secs + Lock out time (see Pos C). If it is required that the switch out time is
quicker than the switch in time (reversal of the above situation) this can be achieved but must be ordered
when the relay is built.
C Selection of Lock Out Time at each Change of Switching Direction
This position allows adjustment of the lock out time on load reversal and on initial energising. If we set to
L_30 we have 30 secs lock out time, in addition to the time selected in Pos. 2. This will operate each time
we have load reversal, thus helping to reduce contactor wear. The lock out time is adjustable from 1…254
sec.;
Factory setting = 30 secs ( "L_30")
D Selection of C.T.Ratio . This is only applicable for CXM relays. Please see the section of these instructions
“CXM Multi-Meter version” On the CX relay the display will be non-operative in this position and will show
"_not"
E Selection of V.T. Ratio This is only applicable on CXM relays. Please see the section of these instructions
CXM Multi-Meter version On the CX relay the display will be non-operative and will show "_not"
F Selection of Switching Program.
The switching programs are selected using the + - buttons:
"Auto" - Fully automatic self selection of capacitor steps in order to achieve the required power factor with
no pre-determined switching sequence. Relay voltage measurement L2-L3
"1 1 1 1": Sequential switching in/out with fully automatic recognition of each capacitor size.
This program could be selected for tuned filter banks where it is essential that each tuned step is
switched sequentially.
"Eaut": identical to "Auto", but for single phase operation, with relay measurement voltage taken from
L1-N
"E111": identical to "1111", but for single phase operation with relay measurement voltage taken L1-
Factory Setting "Auto"
Commissioning
1 Apply the supply, measurement and control voltages. Connect the current transformer, and remove any
short circuit link. Make sure the Current Transformer is positioned so as to measure the total current of the
system including the capacitor bank current. On a 3 phase system the measured voltage L2-L3 must always
be taken from the two phases on which the CT is not mounted, i.e. if the CT is on L1, voltage supply
must be from L2-L3.If a change must be made on site it is preferable to change the voltage connections
rather than the CT so as to avoid the risk of an open circuit CT.
If the supply is single phase, the appropriate setting must be selected on "F" of the function switch with
measured voltage connections (L2-L3) changed to single phase.
Indication "I—O" : No current or less than 10mA is flowing in the CT circuit.
If capacitor steps are energised, they will be automatically disconnected after 5 minutes. If the relay
is in manual mode, (Pos.4) the steps will stay in circuit.
Indication "U—0" measuring voltage is below 50 V or not connected.
The relay will start to control if the measured voltage (L2-L3) is at 50 volts or above, and the reactive
component of the measured current is 10mA or above.
If the measured voltage falls below 50V, energized steps will be switched off after a 2 sec time delay in
both automatic and manual mode.
2 Factory Settings of Function Switch
Power factor target = 1 C.T. Ratio = 100
Step switch time = 60 secs V.T. Ratio = 1
Step limit switch = Max of controller Switch Mode = Auto
Changes can be made using the function switch, but remember any changes will only be stored in the
memory when the function switch is put in pos. 3 after the change has been made.
4

3 Ensure that multifunction switch (H3) is set to pos. 3 (Automatic mode)
4 The relay has a no-volt release lock out time of 90 secs when first energised. No switching will commence
until this time has expired.
5 Check preset power factor target in pos. 1 and adjust to required value if necessary.
6 Check preset switching time delay pos. 2 and adjust to required value if necessary.
7 Check preset step limitation and adjust if necessary to the number of steps in circuit. If any one step is not
functioning for any reason, the CX or CXM will try to switch three times to ensure that there is no detectable
Output, and it will then lock out this step for a period of 24 hours at least. This lockout will last until there is
a cancellation of the Cd alarm (see pos 6) or a loss of supply. The relay will try to switch each defect step
again three times and will then permanenly disconnect them, with the alarm indication "Cd" in the display.
8 Check preset alarm mode and select in pos. 9, if requested.
9 Set the function switch back to pos. 3 – Auto operation
10 Display indicates the current power factor cos phi e.g. "i 0.87" for inductive or "c 0.94" for capacitive load.
11 If wired correctly after the no volt release lock out time of 90 secs, if there is an inductive load, a "+" dot
in the display will start to flash. This indicates the relay is calling for capacitor steps, and switching will
commence in accordance with the selected switching time delay to achieve the target power factor. As each
step switches, so the system power factor in the display must change. When the target PF has been
reached the "+" LED will extinguish. When there is an excess of capacitive kvar the "-" LED will come on
and capacitor steps will be switched out so as to achieve the target power factor.
12 With the CX or CXM relay it is not necessary to preset any C/k-value (threshold level when to start to
switch a step in/out). The relay selects the most suitable capacitor size to meet the target power factor.
Consequently capacitor kvar sizes may be mixed. Each time they are switched the reactive output unit of
value for each step will be recorded in the CX or CXM relay memory and re-called as required. If all
capacitor steps are of equal kvar value, the CX or CXM will switch in rotation so as to provide equal wear
on the contactors. For special applications where sequential switching is required (1:1:1:1: etc) this is
possible using Pos.F.
13 It may happen, that either + or – dots are flashing steadily and the regulator will not switch on/off any step.
This is because it is not able to find a suitable step size to meet the target PF. No dot flashes once the
target PF is achieved.
14 If there is no load on the system at the time of commissioning, put the function switch in pos. 4 "manual
control" and bring the steps in by pressing the + button, so as to create a leading power factor. Make sure
that the supply voltage to the relay is at least 110V ( normally for the UK it will be 415V). Now change the
function switch to Pos. 3 ( Automatic switching ). The CX or CXM relay must now sense a leading power
factor and switch the steps out until the target p.f. is achieved. If the relay does not switch the steps out
check that the C.T is on the correct phase in relation to the measured voltage L2-L3. i.e. the phase on
which L2-L3 are
not
connected), and check that the relay is not reversed – i.e. reading lag when it should
be reading lead. If this is the case, de-energise the relay and swap over L2-L3.
Once the required settings or alterations have been made, set function switch (H3) to position 3
"automatic" and replace the front cover plate, so as to inhibit unauthorized interference with relay
settings.
5

Alarm Functions
1 Power Factor Alarm (Display shows: "AL_")
If the predetermined power factor is not obtained in case of insufficient capacitance, the alarm signal is
triggered after elapse of 75 x the selected step switching time, valid for both directions lead and lag. If the
set target p.f. is exceeded due to overcompensation (welded contacts) after elapse of 75 x the selected step
switching time, (Pos 2) this alarm will be triggered and "AL_" will be displayed, alternating each 5 secs
with any other display selected. To reset the alarm put function switch in Pos 9 and select A_3 (see Pos 9
in control section)
2 Failed Capacitor Step Alarm (Display shows "AL_ _")
This symbol will appear at 5 secs. Intervals with any other display. This alarm can only be cancelled as
detailed in Pos 6
3 If the supply voltage to the relay and hence the capacitor bank fails, there is no indication in the display, but
contacts M-MO will close and M-MS will open. Provided an external power source is connected to these
terminals rated at 3A 250V 50/60Hz, a signal can be given to a BMS system for example.
Data Transmission
Software "WINBSTO" (WIN95/98/ME/NT/2000XP) data logs the date and time for each change in events :
power factor – steps in circuit – steps switched in/out - any triggered alarms.
Each switching operation of the regulator activates 2 telegrams via TTL-interface (14-pole plug on the rear of casing),
one before and one after switching procedure. This provides analysis of the compensation effect as each step
operates. To store the data on a PC , a data cable with integrated converter TTL/RS232 is required. (data Cable No.8
length 200mm). As an alternative to having PC on site, the data output from the CX relay can be fed into our Data
Logger available as follows:
DS 21 – 0,256 MB (Approx 2500 events recorded)
DS 22 _0.512 MB (Approx 5000 events recorded)
DS 23 _1.024 MB (Approx 10000 events recorded)
The Data Logger can then be taken to the PC for downloading using a WORD programme.
Optional Features
Option "L" This option has 2 functions:
1 Fan Control
It is very important to monitor the ambient air temperature inside a capacitor cubicle, especially if harmonic
blocking reactors are fitted. This is achieved with option "L" If this option is fitted there will be two DIP
switches behind the name plate which trigger a volt free alarm contact LF/LF1 rated at 5A 250V 50/60Hz.
The contact will close at the temperatures listed below:
Temperature 30° 35° 40° 45°
DIP S1 OFF ON OFF ON
DIP S2 OFF OFF ON ON
The ambient temp must be held for a period of 48 secs before the contacts operate. This starts an 8 minute
time window. If the temp remains above the target for 48 secs, even though the fan is running, then
another time window of 8 mins. will be activated. If the temp is below the target for at least 48secs., then the
contacts will open for a period of 8 mins at least until that time window has expired. To cancel the alarm see
Pos 9 A_3
2 2nd Power Factor Target (High/Low Tariff)
As described in pos "A" of the multifunction switch (H3), a second target power factor may be applied at
times when this lower power factor is permitted by the Power Utility without penalisation.This will extend the
life of capacitors, contactors and also reduce energy absorbed due to watt losses in the equipment. The
second target PF can be set in the range 0.70 lag…1.0… 0.90 lead. When a voltage of 150….240V 45/65 Hz,
is applied across NT/NT1 the relay will switch to the second target PF. When no voltage is applied, the
first target PF is applied.
6

Option "LT":
This option activates the lower PF target automatically when the ambient temperature rises above 57ºC, thus reducing
the kvar in circuit and hence the heat generated by the installation. If option "L" is fitted the temp alarm contacts will
also be operating. Note it is not possible to have "LT" and "NT" – you have to select only one of these options.
Option "M" – Relay Types CXM
Regulators with this option are fitted with a modified facia with two keys + and - which replace the push buttons
behind the name plate on the CX type. This option necessitates the setting of a CT and VT ratio in order to provide the
correct indication in the LED display. On large loads an automatic change of scale from kW to MW is provided. For
example when the display reads 9999 kW the next increase will show 10.0 MW. Readings are up-dated every three
secs.
The CT/VT ratios are set in Pos D and E of the function switch.
D = c.t.-ratio:
using key + or – in the range of 1….4000 (e.g. 800A/5A =160)
Factory setting = 100. Holding the + - for longer than 2 secs enables rapid roll through.
E = v.t.-ratio:
using key + or – in the range of 1.0….350.0 (e.g. 20 kV/0.1kV =200)
Factory setting = 1.0. Holding the + - for longer than 2 secs enables rapid roll through
Relay type CXM indicates following energy data selectable by using key + or -:
CPower Factor
UMeasuring voltage
ICurrent in selected phase
PTotal 3 phase active Power*
STotal 3 phase apparent Power*
q Total 3 phase reactive Power*
FFrequency
* Assumes balanced load.
Option "k"
Combi Filter Switching Program
A Combi Filter is employed when two separate frequencies must be blocked :
a)The harmonic frequency from the mains supply and
b)The Impulse Frequency sometimes used by Utility Companies to give switching commands, for example for switching
street lighting according to required times. These impulse switchings are usually made in the range of 160-190Hz.
Option "k" will ensure that the more heavily choked capacitors will switch first (odd step numbers) and the less
heavily choked capacitors will be switched second (even step numbers).
Option "k" must be ordered when the relay is built.
7

Connecting Diagram - Common Point Switching
Connecting Diagram - Volt Free Switching Type CX-A
Measuring
45-65Hz
1 Phase
L1/N
45/65 Hz
220 -240
VAC
2 Phase
L2/L3
1 or 5A
Control Outputs
CX-06 CX-12
Alarm
250
3A
Fan
250
3A
NT
ON =NT
OFF =HT
150-240
VAC
8
415V +- 10%
Normal Voltage Connection is L2 - L3 415V +- 10% unless otrhewrwise specified on the order.
L1 - N connection ONLY used when relay is specified for single phase supply in which case the connections
L2 - L3 are not made
415V +- 10%
Normal Voltage Connection is L2 - L3 415V +- 10% unless otrhewrwise specified on the order.
L1 - N connection ONLY used when relay is specified for single phase supply in which case the connections
L2 - L3 are not made