BTU RESEARCH SolidSwitch User manual

INSTALLATION AND OPERATING INSTRUCTIONS
BTU UPS SOLIDSWITCH
EDS-SSINSTMN-082018A

INSTALLATION AND OPERATING INSTRUCTIONS | 32 | INSTALLATION AND OPERATING INSTRUCTIONS
SAFETY
1.1 HIGH VOLTAGE
Under no circumstances should the unit be opened except by trained,
qualified personnel, after AC power has been disconnected and residual
internal voltages have been allowed to decay. Potentially lethal voltages
exist within the unit when it is connected to AC power.
The plug on the power cord is used as a disconnect device. If the plug on
the power cord is used, the outlet shall be installed near the unit and shall
be readily accessible. If the unit is permanently installed without the plug,
a readily accessible disconnect device shall be used.
A GFCI (Ground Fault Circuit Interrupter) meeting local electrical codes
should be used in all areas that may be subject to moisture.
Whereas over voltage and transient protection is provided within the unit,
certain outdoor installations may require additional protection where the
mains supply can experience abnormal variations, or be influenced by
factors such as lightning strikes.
1.2 LITHIUM BATTERIES
Lithium-ion battery pack handling, maintenance and replacement should
be made only by trained, qualified personnel. Improper handling can
result in injury to personnel, or damage to the unit to render it unusable.
CAUTION
RISK OF EXPLOSION IF BATTERY IS REPLACED BY AN INCORRECT TYPE
DISPOSE OF USED BATTERIES ACCORDING TO THE INSTRUCTIONS
ATTENTION
RISQUE D’EXPLOSION SI LA BATTERIE EST REMPLACÉE PAR UN TYPE
INCORRECT
ELIMINER LES BATTERIES USAGÉES CONFORMÉMENT AUX INSTRUCTIONS
1.3 AUDIENCE
This manual is prepared for persons familiar with enclosure installations
in an outdoor environment, electronic circuitry and the codes and
regulations specifying the requirements of the particular installation.
TABLE OF CONTENTS
SAFETY......................................................................................................... 3
1.1 HIGH VOLTAGE .........................................................................................................3
1.2 LITHIUM BATTERIES ....................................................................................................3
1.3 AUDIENCE .................................................................................................................3
BRIEF DESCRIPTION OF UNIT ......................................................................4
SECURITY FEATURES ....................................................................................4
MECHANICAL VIEW....................................................................................5
3.1 MECHANICAL INSTALLATION...................................................................................6
3.2 ELECTRICAL INSTALLATION.......................................................................................7
UNIT CONFIGURATION...............................................................................8
TROUBLESHOOTING.................................................................................. 10
HARD REBOOT OF SOLIDSWITCH............................................................. 10
SPECIFICATIONS .......................................................................................11
TECHNICAL SUPPORT................................................................................11
EDS-SSINSTMN-082018A EDS-SSINSTMN-082018A

INSTALLATION AND OPERATING INSTRUCTIONS | 54 | INSTALLATION AND OPERATING INSTRUCTIONS
BRIEF DESCRIPTION OF UNIT
The SolidSwitch is a versatile multifunctional device for outdoor or indoor
use, to power and communicate with PoE devices over a network. It has 4
PoE output ports, each of which will provide up to 60W, up to the total rated
output power of the particular unit.
A fifth port provides connection to the network via an SFP module, which
can accept interfaces to a variety of network hardware depending on
user requirements. Any of the other ports can also be used for the network
connection if needed, but access is via an RJ45 connector only.
All ports support up to 1Gbps Ethernet speeds.
The unit runs normally from a universal AC input from 85 to 264V. This is used
to maintain the included Lithium-ion batteries and run the PoE loads when
AC power is present. Up to 1400WH of rechargeable Lithium-ion battery
storage is available inside the unit. Should AC power fail, the batteries will
seamlessly assume the PoE loads.
All ports provide access to the on-board network, power and battery
management system. A web browser is required to interface with this system.
The unit has been tested to IEC60529, level IP68 ingress protection
standards, and at extended temperatures, making it suitable for outdoor
applications. Internal heat dissipating parts are thermally connected to
the aluminum housing, and no fans are required.
SECURITY FEATURES
The Layer 3 SolidSwitch employs all encryption methods used to comply
with FIPS Standards.
Network Security
• SNMP v3 With 128/256-bit encryption
• VLAN Ingress Tagging (port by port)
• VLAN Access Restriction (port by port)
• 802.1x
Device Management
• HTTP interface over HTTPS
• SSH@ Command Line Interface
• Local
• Radius
• TACACA+
MECHANICAL VIEW
MAX GLAND TORQUE 7.5 N.m (5.5 ft.lb)
MOUNTING HOLES 5.5 (0.22) DIA
COUNTERBORES 10 (0.393) DIA
207 (8.15)
230(9.06)
293 (11.54)
283 (11.15)
EDS-SSINSTMN-082018A EDS-SSINSTMN-082018A

INSTALLATION AND OPERATING INSTRUCTIONS | 76 | INSTALLATION AND OPERATING INSTRUCTIONS
3.1 MECHANICAL INSTALLATION
The unit may be mounted on any convenient flat surfaces including
concrete, wood, brick, etc. using 4 screws through the mounting holes. Pole
mounting is made easy with an optional pole mounting kit. The suggested
orientation of the unit is with the glands facing downward to easily facilitate
bringing power to the unit and for connecting to POE and LAN ports.
Earth ground screw must be connected to Earth ground in all types
of installations.
When installing on a brick surface the use of lag screws is recommended.
Orientate the SolidSwitch so that none of the lag screws are located on
the mortar.
When installing on a concrete wall, concrete block, cement block,
foundation block or concrete masonry unit (CMU) ensure the appropriate
anchor is selected for the weight of the unit.
The UPS SolidSwitch is an outdoor device and is not recommended for
installation on drywall.
3.2 ELECTRICAL INSTALLATION
Installation should be performed to meet all relevant local Electrical Codes.
The EARTH GROUND screw must be connected to earth ground.
The power cord comes pre-installed. To preserve the IP68 rating of the unit,
cables must be rated for exterior use, and the following procedures should
be followed. You will need a 24mm wrench.
1. For each port used, remove the cover, seal and seal compression
fingers from the unit, and thread them in that order over the end of the
cable. Attach the RJ45 plug.
2. Install the RJ45 connector, tab “down”. It should click into place.
Replace cover and tighten.
If Fiber is being used for the LAN connection, you may need the extender
provided to accommodate the fiber termination length, which should also
be installed before the fiber is terminated.
For some SFP modules, you will need to remove the base of the gland from
the enclosure and replace it after the SFP module is installed. Be sure not to
damage the sealing O-ring.
EDS-SSINSTMN-082018A EDS-SSINSTMN-082018A

INSTALLATION AND OPERATING INSTRUCTIONS | 98 | INSTALLATION AND OPERATING INSTRUCTIONS
SIDE BUTTONS
NETWORK SETUP toggles display of the network settings in the main display
screen. By default it does not appear. To change IP, Subnet and Gateway
parameters, enter values required, and press “APPLY”. The new values are
recorded in non-volatile memory. If the IP address is changed, the web
browser must be re-started using the new address. To change the MAC
address, type in the new address and press “SET MAC”.
DIAGNOSTICS toggles display of the diagnostic information on the main
display screen. By default it does not appear. This display is normally only
used for troubleshooting.
STORAGE MODE allows the user to de-activate the batteries for storage
mode or shipment. To put the unit in storage mode, first disconnect the AC
power. The AC POWER status should change from ON to OFF. Then press the
“STORAGE MODE” button. Confirm that you want to put the unit into storage
mode. The unit will turn off. All connected loads will be turned off. The page
will stop responding. The unit is now in storage mode.
POWER STATUS
AC POWER reads ON and is green when present, OFF and is red when absent.
MAX CAPACITY indicates the total installed battery capacity. It is in multiples
of 350WH.
REMAINING CAPACITY when AC power is present indicates the capacity to
which the batteries are currently charged.When AC power is absent, it shows
the amount of capacity remaining.
RESOURCE LEVEL is the ratio of remaining capacity to max capacity
expressed as a percentage.
EST TIME is the estimated battery run time while running at the current load
indicated in the Port Power and Status fields.
EST EXTENDED TIME is the estimated battery run time when the Programmed
Shutdown levels are set.
PORT STATUS
STATUS is 1 if the port is providing PoE power, 0 if not. POWER displays the
power taken by each port. NETWORK displays the port speed, whether the
port is providing power on not.
PROGRAMMED SHUTDOWN allows the user to set capacity thresholds at
which, during absence of AC power, each PoE port will be turned off. This
enables essential services to be maintained for as long as possible in the
event of a prolonged power outage.
UNIT CONFIGURATION
The unit is shipped and stored with the batteries de-activated. In this
state, the unit can be stored for up to 3 months if kept in the temperature
range -20°C and +50°C. To “wake up” the unit, plug it into an AC outlet.
Once awake, the unit will stay awake until it is either put in storage mode
again, or the batteries run flat without AC power. Depending on the storage
capacity installed, their charge status, and any load, the batteries will be
flat in anywhere between a few hours to a few weeks.
To put the unit back into storage mode, you should be connected to it with
a computer. Please see later for complete details.
To configure the unit, connect a computer with a web browser to the unit.
The default IP address is 192.168.100.55
You should be rewarded with the SolidSwitch Command Post Screen
as below.
EDS-SSINSTMN-082018A EDS-SSINSTMN-082018A

INSTALLATION AND OPERATING INSTRUCTIONS | 1110 | INSTALLATION AND OPERATING INSTRUCTIONS
SPECIFICATIONS
TECHNICAL SUPPORT
Please call +1 (713) 301-4140. 09:00 to 17:00 USA Central time.
Maximum Power
Output 240W
Dimensions 7Ahr unit: 283mm x 230mm x 76mm
28Ahr unit: 283mm x 230mm x 134mm
Weight 4.5Kg and 10.5Kg with UPS Power Cover
VAC Input 85 to 264 VAC 50 to 60HZ
POE Out Voltage Range 50 to 57 VDC
Ports 4 POE Ports and 1 SFP Port
Connectors Shielded RJ-45 and Cage SFP
Data Rates 10/100/1000 Mbps
POE Output Max output per port 60W and back compatible to
IEEE802.3at/af
Internal UPS Switching Glitch Free, undetectable switching from AC power
source to internal DC supply
Internal Battery Cells LG INR18650F1L, Cylindrical Li-Ion, Nominal Std
charge/discharge: 3350mAh
Internal Battery Pack 1 each 28 cell 7S4P pack with up to 3 added packs
in UPS Power Cover
Internal UPS
Emergency Power 350Wh expandable to 1400Wh w/optional
“Extended Run Cover”
Mounting Wall Mountable or Pole Mountable w/optional Pole
Mounting Kit
Enclosure Dust and Water Intrusion: IEC60529,Level IP68, NEMA 6P
Operating Ambient
Temperature Switch: -35 - 60ºC
Operating Humidity Max 90% Non-Condensing
Storage Temperature Switch:-40 - 80ºC
Battery Packs: -20 - 50ºC for 3 months
Storage Humidity 95% Non-Condensing
Safety and Regulatory
Compliance UL, cUL, CE, RoHS Compliant, WEEE Compliant
Warranty UPS Switch: 2 Years
Battery Packs: 1 Year
TROUBLESHOOTING
As this is an outdoor rated unit, there are no LED indicators to indicate
operating status.
Standard procedures like “check connections” are not listed.
HARD REBOOT OF SOLIDSWITCH
This requires the cover to be removed. This must be done by trained and
qualified personnel in a controlled environment.
1. Disconnect AC power completely. Wait one minute for stored high
voltage inside to decay.
2. Remove the cover (12 security screws).
3. Unplug all the batteries. Wait one minute for stored voltage to decay.
4. Reconnect the batteries (order is not important – the unit will not
power up yet).
5. Replace the cover.
6. Reconnect AC power. The unit will come out of storage mode and
wake up.
SYMPTOM POSSIBLE CAUSE COMMENTS
Will not power
any load No AC power and flat
batteries
The unit goes into storage mode.
It will recover when AC power is
restored but the batteries will need
to charge.
Some loads will
not power Over power budget SolidSwitch rigidly enforces its
designed power budget to protect
itself and its loads.
Non-standard PoE Load SolidSwitch powers all IEEE
802.3af/at loads, UPOE loads, and
some non-standard loads.
No LAN
connection Incompatible SFP module Try to use a PoE port for LAN
communication. If successful,
“reboot” the unit as below and try
again. If problem persists, please
call Technical Support.
EDS-SSINSTMN-082018A EDS-SSINSTMN-082018A

www.bturesearch.com
EDS-
SSINSTMN-082018A
Table of contents
Popular Switch manuals by other brands

Analog way
Analog way ASC4806 quick start guide

Black Diamond Equipment
Black Diamond Equipment 8800Series Hardware installation guide

Compaq
Compaq ProLiant Interconnect Switch user guide

Scion-Tech
Scion-Tech SC35.MX88 user manual

TRENDnet
TRENDnet TK-408K Specifications

Siemens
Siemens 3LD7 operating instructions

PowerBox Systems
PowerBox Systems Digi-Switch instruction manual

TRENDnet
TRENDnet TEG-S50G Specifications

Hubbel
Hubbel CHANCE BP3R3M Installation, operation and maintenance manual

Connectland
Connectland CL-KVM20028 user manual

DIW
DIW Funk touchShade DTRS-500 instructions

ATEN
ATEN Master View CS-72EC user manual