Page 14
ON
OFFSTART
SERVICE (cont.)
CONTROL THERMOST T
Location:
The control thermo tat i located in ide the hood
on the right ide.
Te t Procedure :
1. Di connect the brewer from the power ource.
2. With a voltmeter, check the voltage acro the
blue/black wire on the control thermo tat and the
white wire on the power cord for 120 volt model
15 or the white in ert on the terminal block for two
wire 120 volt model 20, three wire 120/208 or 120/
240 volt model and the red in ert on two wire 200
volt or 240 volt terminal block. Connect the brewer
to the power ource. The indication mu t be:
a) 120 volt ac for two wire 120 volt model , three
wire 120/208 or 120/240 volt model .
b) 200 to 240 volt ac for two wire 200 or 240 volt
model .
3. Di conned the brewer from the power ource.
If voltage i pre ent a de cribed, proceed to #4.
If voltage i not pre ent a de cribed, refer to the
Wiring Diagram
and check the wiring harne .
4. Gently remove the capillary bulb and grommet
from the tank.
5. With a voltmeter, check the voltage acro the
black wire of the control thermo tat and the white
wire on the power cord for 120 volt two wire model
15, the white in ert for two wire 120 volt model 20,
three wire 120/208 or 120/240 volt terminal block
and the red in ert on the two pole 200 volt or 240
volt terminal block when the control thermo tat i
turned "ON" (Fully clockwi e). Connect the brewer
P2267
P1171
27479 091596
to the power ource. The indication mu t be:
a) 120 volt ac for two wire 120 volt model , three
wire 120/208 and 120/240 volt model .
b) 200 to 240 volt ac for two wire 200 volt or 240
volt model .
6. Di connect the brewer from the power ource.
If voltage i pre ent a de cribed, rein tall the capillary
tube into the tank to the line 4.5" above the bulb, the
control thermo tat i operating properly.
If voltage i not pre ent a de cribed, replace the
thermo tat.
Removal and Replacement:
1. Remove wire from control thermo tat.
2. Remove the thermo tat capillary bulb by firmly
pulling up on the capillary at the tank lid. Thi will
di engage the grommet from the tank lid.
3. Remove the one #6-32 crew ecuring the control
thermo tat to the mounting bracket in the hood.
4. Slide the grommet to the line 4.5" above the bulb
on the new capillary tube.
5. In ert the capillary bulb through the hole in the
tank lid and pre the grommet firmly and evenly
o that the groove in the grommet fit into the tank
lid.
6. Carefully bend the capillary tube o that the tube
and bulb in ide the tank are in the vertical po ition.
NOTE - The capillary tube mu t be clear of any electri-
cal termination and not kinked.
7. U ing one #6-32 crew ecure the control thermo-
tat to the mounting bracket in ide the hood.
8. Refer to Fig. 3 when reconnecting the wire .
9. Adju t the control thermo tat a required.
FIG. 1 CONTROL THERMOSTAT
FIG. 3 CONTROL THERMOSTAT TERMINALS
BLK Lead from
Thermal Fu e
BLU/BLK Lead from
Limit Thermo tat