6. Plug the Temp cord, with stereo plug, into the CH400 BATT A Temperature port. See
FIGURE 4-1 (p. 6) for steps 6 through 10.
7. Install 12 V Power Jumper between the CH400 and CHASSIS Fan Power terminals.
8. Connect one Module Power Jumper from the CH400 Switched 24V power out to the
CHASSIS Power Bus Input terminal.
9. Connect Module Power Jumpers between the CHASSIS Module terminals and the DAQ and
each GRANITE measurement module.
10. Install CPI and EPI (Ethernet) cables between the GRANITE measurement modules and the
DAQ.
11. Plug the Detachable Power Cord into the rear of the CHASSIS then into a wall socket.
12. Set the CH400 Power Switch to On.
13. Check the LED lights on each measurement module to verify they are powered.
14. Set the CH400 Power Switch to Off.
15. Install the remaining system wiring such as sensors and control devices. Refer to device
manuals for more information.
16. Set the CH400 Power Switch to On.
17. Program the DAQ, configure devices, and test the system. Refer to device manuals for more
information.
5. Overview
GRANITE-series DAQs and GRANITE expansion peripherals, though independently modular, can
be mounted in one or more CHASSIS to improve convenience in portability, gain efficiency in
testing operations, and optimize overall system performance.
The GRANITE CHASSIS includes a high performance 8-Ah onboard battery. Typically this battery
is trickle charged using a CH400 (see FIGURE 4-1 (p. 6)) or other regulator such as the one built-
in to the GRANITE 6 DAQ. See the following figure. For complex battery configurations refer to
the CH400 product manual.
GRANITE CHASSIS 7