manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. carport
  6. •
  7. Tent
  8. •
  9. carport KDR Series Programming manual

carport KDR Series Programming manual

HZ1077−E
Assemblingmanual
carportKDR-series

Constructionshallbeimplementedbyprofessionals.Problemsmayoccuriftheproductis
installedbysomeonewithouttheproperknowledge.
Notice Pleasebesuretoreturntheinstructionmanualinitsoriginalpackagetotheowner
afterexplainingproductoperationprocedures,maintenanceandinspectionmethods.
Electricdrill,Drill
Ratchetwrench,Adjustableendwrench
ElectricScrewdriver
Measure,Level,Plumbbob,Cutter,Pillar,Plastichammer
Foundationmaterials(Cement,Aggregate,etc)
Sealant,Caulkgun,pallet
CropperorSaw
Pleasepreparetoolsandmaterialsasneeded
NecessaryToolsandMaterialsForInstallation
PrecautionsDuringConstruction
Thecarportisasimplegarage.Donotchangeorremodelitforstorage,recreationalorresidentialpurposes.
Thisproductisforgeneralareas.Ithasasnowaccumulationstrengthof600N/m2(61.2kg/m2),which
correspondsto20cmofsnowfall.Donotinstallinheavysnowarea.
Donotinstallitintheplacewheresnowslidesdownfromthebuildingroofdirectly.
Wheninstallingitbesidesconcretewall,etc.,leavea10cmorlargergapbetweenthepostandthewalldueto
notclasheachotherduringstrongwind.
Besuretoprovideextrasupportpost(optional)wheninstallingitinstrongwindarea.
Wheninstallingitwithsidepanel,besuretosetupsupportpost.
Wheninstallingitwithsidepanel,recommendingtoinstallingitsfrontframeface
tothebuildingduetoreducethewindeffect.
Positioningthepostssothattheydonotaffectundergroundobjects(water
supply,drainpipes,etc.).
Whenmovingtheposts,pleasefollowthecompanyspecifications.
Followtheinstructionsandbesurethatallthespecifiedscrewsandboltsforassemblyaretightenedsecurely.
Donotuseanythingotherthanthespecifiedpartsoroptionalparts.
Thefoundationshouldcomplywithorexceeddimensionspecifications.
Allowsufficientcuringtimefortheconcrete(4to7days)anddonotplaceheavyobjectsonitorsubjectitto
vibrationsduringthecuringperiod.
Besuretokeepthenotebelowtopreventaluminummaterialscorrode.
⑴
Donotuseseasandforthefoundationsinceitcontainssaltandmaycausecorrosion.
Donotuseacementenhancer,water-reducingagentorcryoprotectant.Theymaycausethepoststocorrode.
⑵
Immediatelywipeoffanymortarorstainsfromthesurfaceofaluminumpartssincetheymaycausecorrosion.
⑶
Donotletaluminumpartscomeincontactwithothermetalssuchascopperoriron.Provideinsulationwith
vinyltape,bypainting,etc,.ifnecessary.Otherwisetheproductmaycorrode.
⑷
Besuretoprovidegravelforthefoundationtoallowdrainage,insertwaterdrainageholes(φ5)atthebaseof
thepostsandfoundation.Failuretodosomayleadtowateraccumulationinsidethepostsanddamagethemif
thewaterfreezesandexpandsinside.
Besuretoputthesealantglueasthefollowing.
⑴
Wipeoffanystainsfromthesealingpart.
⑵
Besuretoapplyasealant,asspecified.
⑶
Afterputtingthesealantglueontheholemadeinitsallwallbody,fullytightenthescrew.
⑷
Sealcompletelydeepenoughandfinishthesurfacewithapallet.
WhentheG.L(Groundline)issteep,besuretokeepthedepthofthepostatthelowestlevel.
Afterconstruction,checktheproductstoseeifthebolts,screws,nuts,etc.loosenoranydangerousplacesexist.
Besuretocheckiftheproducthasscratches,dentsordint.
Besuretoexplainproductoperationprocedures,maintenanceandinspectionmethodstotheowner.
PrecautionsDuringInstallation
enoughspace
spacemorethan10cm
concretewalletc
Thankyouverymuchforchoosingourcompany'sproducts.
Pleasebesuretothoroughlyreadtheseinstructionsforassemblyinorderto
properlyandsmoothlyassembleorattachthisproduct.
Dimension,PositionofPostsandBaseDimension
Dimension,PositionofPost
LengthDimension(W)andPostStandardPosition(postcouldbechangedasthedimensionof← →)
29size
58size
Standardtype Longtype Extra-Longtype
51size
DepthDimension(D)
,HeightDimension(H)
〔Depth20・24・27・30size〕
BaseDimension
ConcreteFloor
morethan morethan
morethan morethan
morethan morethan
DepthDirection LengthDirection
DepthDirection LengthDirection
Theprojections
whichprevent
floatingat4rounds
steelrod
SolidGround
lncaseofusingstandardsizeinconcretefloor,pleaseinstallunderbelowcondition
 1)Thicknessofconcretefloorismorethan100mm.
 2)Steelrodandweldingwirenetarearrangedinconcretefloor.
 3)Dimensionofprojectionwhichpreventsfloatingat4roundsismorethan50mm×50mm
 4)Distance(A)fromoutsideedgeofbasetoaroundconcretefloorismorethandimensionspecifications.
Notice
Incaseof100KN/m2endurancestrengthofground
height28size
height28size
Incaseof50KN/m2endurancestrengthofground
Post・Beam・MainFrameList
PartsInstructionGuide
Pleasebenotedpost,beam,mainframeandcornerbracketaredifferentaccordingtothesizeofbody.
Besuretousethecorrectmaterialsincaseofconnectingthedifferentsizeofbody.
posttype
section
PartsID
section
PartsID
section
PartsID
beamtype
mainframetype
Ushapedgutter
1part
Ushapedgutter
1part
Ushapedgutter
1part
Ushapedgutter
1part
Ushaped
gutter
3parts
Ushaped
gutter
3parts
Ushapedgutter
1part
Ushaped
gutter
3parts
noUshaped
gutter
beamtype
mainframetype
type
bodysize
DepthD LengthW standardpost
extra-longpost
longpost
post
componentparts
PartsContents
Pleaseopenthecaptionedcartonandcheckallcontentsinadvance.
Pleasecheckthepartsdefectiveoranydamage.
Wepackedsomeextrascrewinthepartsbox.(x)numberisnecessaryQ'tyforinstallation.
content
name quantity
PartsID shape
content
name quantity
PartsID shape
postset
(standardpost)
postset
(
longpost)
postset
(extralongpost)
post
instruction
manual
instruction
manual
instruction
manual
post
post
beam
frontframe
sideframe RightLeft
each1pc
end
roofretainer
roofretainer
drilling
screw
smalltruss
screw
smalltruss
screw
mainframe
gutter
roundgutter
beamset
lengthset
lengthset
depthset
roofpanel
cushion
roofrafter
corner
bracket
corner
partsset
roofpanel
polycarbonate
cornercap
tappingscrew
anchorrod
beamcap
frontframe
gutter
attachment
bracket
heatprotection
polycarbonate
polycarbonate
(mat)
roofpanel
set
partsbox partsbox
PartsContents
content
name quantity
PartsID shape
content
name quantity
PartsID shape
gasket
raingutter
cap
elbow
gutter
attachment
frontframe
cornercap
guttercorner
cap
fixbracket
seal
RightLeft
each1pc
RightLeft
each1pc
RightLeft
each2pcs drainelbow
saddle
hexagon
(withwasher, 
 springwasher)
drilling
screw
glue
cautionlabel
snowlabel
assembling
manual
InstallationProcedure
InstallationofPostandBeam
Connectbetweenpostandbeamwithcornerbracketand
fixwithhexagonboltM8×25
Installasthesidewhichthecaution
labelisattachedcomesinside.
hexagonbolt
(withwasher,springwasher)
(partsbox)
(cornerpartsset)
cornerbracket
anchorrod
(postset)
post
post
beam
beam
beamcap
(partsbox)
cautionlabel
InstallCornerCap
Attachthecornercaponthe
cornerbracket.
cornercap
(partsbox)
(partsbox)
tappingscrew
cornerbracket
InstallationtoBaseHole
①Insertpostintothebaseholeandfix
withsupportstandnottofalldown.
②Checkifitisflatandvertical,andcast
 concrete.
supportstand
1
InstallationofGutterandFrontFrame
Putthelabel
Besureto
putthelabel
Screwthefixbracketonthepostand
fixthefrontframe,gutterattachment
bracketonthegutter.
Setthegutteronthefixbracketand
screwthegutteronthepostwiththe
attachment.
Andputthecautionlabelinside
thepost.
Setthegutteronthefixbracket
①InstallationofGutter
(partsbox)
(partsbox)
(partsbox)
(depthset)
(depthset)
(depthset)
(partsbox)
cautionlabel
snowlabel
attachedcautionlabel
drillingscrew
frontframe
gutterattachmentbracket
(partsbox)
frontframe
gutterattachmentbracket
fixbracket
post
post
gutter
gutter
smalltrussscrew
smalltrussscrew
fixbracket
Setthegutteronthefixbracket
②InstallationofFrontFrame
①
②
Screwthefrontframeandthegutterattachmentbracket
onthefrontframe.
Screwthefrontframeonthebeamwithfrontframe
gutterattachmentbracket.
(depthset)
(partsbox)
(partsbox)
(partsbox)
(partsbox)
(partsbox)
frontframe
gutterattachmentbracket
frontframe
gutterattachmentbracket
smalltrussscrew
smalltrussscrew
smalltrussscrew
fixbracket
beam
frontframe
fin
fin
seal
(partsbox)
seal
InstallationofGutterincasePostisMoved
InstallationofFrontFrameincasePostisMoved
①Accordingtothepostposition,puncturetheφ4.5holeonthe
 gutterandscrewit.
②Putthesealontheunnecessaryhole.
①Accordingtothepostposition,puncturetheφ4.5holeonthe
 frontframeandscrewit.
②Putthesealontheunnecessaryhole.
■FixingDrawing
Attachthefrontframeandgutteronthecap
attachedonthesideframe.
Dosealingworkattheconnectingpart.
step2
step2
sealingpart
sealingpart
Attachthefrontframecornercapandgutter
cornercaponthesideframe.
Whenscrewingthesideframe,besurenottonipthetight
rubberwiththescrewhead.
step1
step1
step1
step3
InstallationofSideFrame
InstallationofRoofPanelCushion
Attachtheroofpanelcushionsonthemark-offlines
oftopsideofallthemainframematerial
Aview
Aview
Attachtheroofpanel
cushionsonthe
higherfinside
Whenattachingthe
roofpanelcushion,
besurenottobe
comeoff
roofpanel
cushion
roofpanelcushion
main
frame
main
frame
mark-offlines
356.6
(endpart)
718
(middlepart) 718
(lengthset)
(partsbox)
(partsbox)
drillingscrew
(partsbox)
(partsbox)
(partsbox)
drillingscrew
tightrubber
drillingscrew
drillingscrew
drillingscrew
frontframecornercap
guttercornercap
gutter
makea3.0
holeonthecap
andscrew
(depthset)
(depthset)
(depthset)
frontframe
sideframe
sideframe
sideframe
guttercornercap
InstallationofMainFrame
Insertthemainframetothesideframe(finofthemainframecameto
gutterside)andscrewonthebeamusingtheguidehole.
Screwthesideframetothemainframe.
frontframe
side
frontframe
side
gutter
side
gutter
side
Whenscrewingthemainframe,besurenottonipthetight
rubberwiththescrewhead.
drillingscrew
drillingscrew
drillingscrew
guidehole
beam
beam
frontframe
mainframe
mainframe
fin
sideframe
gutter post
(depthset)
(depthset)
tightrubber
InstallationofMainFrameincasePostisMoved
SeetheUshapedgutterofthebeamandmaketheφ5.2holeonthemainframeandscrewitonthebody
(pictureA).
Incaseofinstallingthemainframeotherthanpoststandardposition,putthesealontheunnecessaryhole
(pictureB).
mainframe
mainframe
Ushapedgutter
Ushapedgutter
seal
(partsbox)
SealingofGutterCornerCap
Dosealingworkattheconnectingsideoftheguttercornercapandmaterial.
sealingpart
9
InstallationofRainGutter
rainguttercapinstallationside
raingutterinstallationside
Screwthegutterattachmentandgasketonthegutteranddosealingwork.
Usetheglueforraingutterparts.
Attachtherainguttercaponthegutteranddosealingwork.(fig.A)
sealing sealing
(fig.B,Cpartdetail)
rainguttercap
atthestandardpostposition
rainguttercap
installationside
raingutter
installationside
10
Thelengthoftheroundgutter(ℓ2)isdifferentaccording
tothepostposition.
Cuttotheproperlengthonsite.
type
type
type
InstallationofRoofRafter
(depthset)
drillingscrew
ForApart,screwusingtheguidehole.
ForBpart,seeUshapedgutterofthe
mainframeandscrewit.
Thisfigure
indicatesthe
frontframe.
roofrafter
roofrafter
roofrafter
frontframe
frontframe
front
frame
mainframe
mainframe
gutter
(gutter)
gutter
Bpartdetail
Apartdetail Apart
Apart
Bpart
Bpart
Bpart
Ushaped
gutter
8
Besuretodosealingworkaroundscrewsin
ordertopreventdangerwhencleaningaswell
asforwaterproof.
Notice
Whenusingthepolycarbonatemat(SI),attachthe
unevennesssidedown.
Otherwisethepanelcolorischangedbysunlight.
Cpartdetaildrawing
sealing
sealing
rainguttercap
(partsbox)
(partsbox) (partsbox)
(partsbox)
(partsbox)
(partsbox)
(partsbox)
drillingscrew
(partsbox)
drillingscrew
drillingscrew
saddle
gasket
gutterattachment
gutter
elbow
drainelbow
Cpart
roundgutter
※Cuttheroundgutter
 accordingly
(lengthset)
fig.B
fig.A
InstallationofPanel
BeforeInstallingPanel
Checkpostinterval,vertical,flat,anddiagonaldimensionofroof
(RegardingM-connecttype,adjustafterconnected)
Besurethatsealingofraingutterpartisfinished.
It'sdifficulttodosealingworkofraingutterpartafterinstallingpanel.
※Incasediagonaldimensionofroofdoesnotcomeout,loosethe
 screwwhichfixgutter,mainframeandbeamandadjustthem.
post
postinterval,vertical,flat
post
11
Remark
Afterinstallingpanel,pullinthepanelstothe
frontframesideas③
Wheninstallingpanel,pleasebenoted
asbelow.
Sortthepanelequally
frontframe
frontframe
gutter
Attachthepanel
totheend.
sideframe roofrafter
A−A'cross-section
・Peeloffthecuringsheet.
・Insertthepanelintothefrontframeandtheninto
 thegutter.
InstallationofRoofRetainer
(depthset)
(depthset)
Remark
・Ifthescrewofinstallingtheroofretainer
 (middlepart)istightentoomuch,thescrew
 willrunidle.
 (tighteningtorquelessthan15kgf.cm)
・Ifthescrewheadleanswheninstallingtheroof
 retainer,itwillcausewaterleakage(waterwill
 enterfromthescrewheadclearance),
 Soinstallitnottomakeclearance.
Inserttheendroofretainerintothefrontframe
sideandseetheU-shapedgutteroftheside
frameandfixfromthefrontframeside.
Dosealingworkattheinsertpartofthe
roofretainer(endpart).
Inserttheroofretainerintothefront
frameandfixfromthefrontframeside.
Insertuntilittouchesthe
roofpanelcushionofthe
frontframe
step1
step1
step2
step2
step3
step3
drillingscrew
drillingscrew
drillingscrew
roofretainer
roofretainer
roofretainer
endroofretainer
endroofretainer
roofretainer
sideframe
(top)
(bottom)
sideframe
smalltrussscrew
(withwasher)
smalltrussscrew
(withwasher)
sealing
Ushaped
gutter
gutter
InstallationDrawing
12
CuttingProceduresofDepthDirection
Incaseofcuttingdepthdirection,besuretocutfromthefrontframeside.
Accordingtothecuttinglengthoftheroof,cutandprocesseachmaterialsandpanels.
Benoticedthedirectionofthematerials.
CutRange
X=lessthan300mm(D=27,30)
X=lessthan400mm(D=24)
Cuttingthebeams
Cuttingthesideframes
Cuttingtheroofrafters
Cuttingtheroofretainers
Cuttingtheendroofretainers
Cuttingtheroofpanels
frontframe
side
frontframe
side
Roofcuttingdimension100mm
Roofcuttingdimension100mm
Cuttingdimension(mm)
Depth
Cuttingdimension(mm)
Depth
D20isnotavailable
Cuttingdimensionfomula
Depthdimension(D)
Thebelowindicatesthecuttingdimension(XA)incasethattheroofcuttingdimension
(X)is100mm.
Thebelowindicatesthecuttingdimension(XA)incasethattheroofcuttingdimension
(X)is100mm.
Decidethecuttingdimension(XA)bythecuttingdimensionfomula.
Decidethecuttingdimension(XA)bythecuttingdimensionfomula.
11×19cutting
1.BeamProcessing
2.SideFrameProcessing
notavailable
notavailable
frontframe
side
frontframe
side
frontframe
side
Cuttingdimension(mm)
Depth
Thebelowindicatesthecuttingdimension(XA)incasethattheroof
cuttingdimension(X)is100mm.
Decidethecuttingdimension(XA)bythecuttingdimensionfomula.
Cuttingdimension(mm)
Depth
Thebelowindicatesthecuttingdimension(XA)incasethattheroof
cuttingdimension(X)is100mm.
Decidethecuttingdimension(XA)bythecuttingdimensionfomula.
Cuttingdimension(mm)
Depth
Thebelowindicatesthecuttingdimension(XA)incasethattheroof
cuttingdimension(X)is100mm.
Decidethecuttingdimension(XA)bythecuttingdimensionfomula.
3.RoofRafterProcessing
5.EndRoofRetainerProcessing
φ5.5(U-shapedgutter)
φ4.2(U-shapedgutter)
φ5(U-shapedgutter)
4.RoofRetainerProcessing
Roofcuttingdimension100mm
Roofcuttingdimension100mm
Roofcuttingdimension100mm
notavailable
notavailable
notavailable
Afterprocessinginstallthebodyaccordingtothemanualof  〜  .
Cuttingdimension(mm)
Depth
Thebelowindicatesthecuttingdimension(XA)incasethattheroofcuttingdimension(X)is100mm.
Decidethecuttingdimension(XA)bythecuttingdimensionfomula.
6.RoofPanelCutting
Roofcuttingdimension100mm
notavailable
frontframe
side
CuttingProceduresofLengthDirection
Thepanelspanis718mm.Incaseofcuttinglengthdirection,cuttinglengthoftheroof(Y)inmultiplesof
718mmisrecommended.
Cutthematerialsfromoppositesideoftheroundgutterinstallation.
Movethepostasthesamelengthasthecutting
lengthoftheroof(Y).
Cuttingofthefrontframes
Cuttingofthegutter
Cuttingofthemainframes
Cuttingofthepanels
1.FrontFrameProcessing
Cutthematerialsasthesamelengthasthecuttinglengthoftheroof(Y).
φ3(U-shapedgutter)
Lengthdimension(W)
CutRange
Incasethecuttinglengthisless
thanIpanelpitch.
Y=B=lessthan650mm
Incasethecuttinglengthismore
thanIpanelpitch.
Y=718×n+B
n=numberofpanelpitch
B=16mm〜650mm
Itcan'tbecutfrom465mmto
535mmforinstallinggasket.
※
Cutthematerialsasthesamelengthasthecuttinglengthoftheroof(Y).
φ3(U-shapedgutter)
φ5(U-shapedgutter)
30(cuttingonside)
2.GutterProcessing
Cutthematerialsasthesamelengthasthecuttinglengthoftheroof(Y).
CuttinglengthofroofpanelisassameasB.
φ3(U-shapedgutter)
21(cuttingonside)
3.MainFrameProcessing
4.RoofPanelProcessing
Afterprocessinginstallthebodyaccordingtothemanualof  〜  .
N10.02

This manual suits for next models

25

Other carport Tent manuals

carport 59386 User manual

carport

carport 59386 User manual

carport KS Series Programming manual

carport

carport KS Series Programming manual

Popular Tent manuals by other brands

GigaTent GEN-040 owner's manual

GigaTent

GigaTent GEN-040 owner's manual

walser 30959 User instructions

walser

walser 30959 User instructions

Heimplanet Mavericks manual

Heimplanet

Heimplanet Mavericks manual

Ins'Tent VITABRI Canopies AIR TENT Setup instructions

Ins'Tent

Ins'Tent VITABRI Canopies AIR TENT Setup instructions

SlingFin LFD manual

SlingFin

SlingFin LFD manual

Ozark Trail W660.2 Assembly instructions

Ozark Trail

Ozark Trail W660.2 Assembly instructions

Skandika PITEA SUV Setup instructions

Skandika

Skandika PITEA SUV Setup instructions

Dometic Mobil AIR PRO 361 Installation and operating manual

Dometic

Dometic Mobil AIR PRO 361 Installation and operating manual

Palram Feria HG9310 Assembly instructions

Palram

Palram Feria HG9310 Assembly instructions

Ohenry Productions Premium 10x15 quick start guide

Ohenry Productions

Ohenry Productions Premium 10x15 quick start guide

Coleman Avior X2 installation manual

Coleman

Coleman Avior X2 installation manual

Wechsel EXOGEN 2 quick start guide

Wechsel

Wechsel EXOGEN 2 quick start guide

Palram Joya 3x5.46 instructions

Palram

Palram Joya 3x5.46 instructions

ShelterLogic MaxAP 23521 Assembly instructions

ShelterLogic

ShelterLogic MaxAP 23521 Assembly instructions

Haushalt International 62810 Assembly instruction

Haushalt International

Haushalt International 62810 Assembly instruction

Vaude CAMPO CASA XT 5P user manual

Vaude

Vaude CAMPO CASA XT 5P user manual

Coleman 9271A163 instructions

Coleman

Coleman 9271A163 instructions

Coleman Tent instructions

Coleman

Coleman Tent instructions

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.