HZ1077−E
Assemblingmanual
carportKDR-series
Constructionshallbeimplementedbyprofessionals.Problemsmayoccuriftheproductis
installedbysomeonewithouttheproperknowledge.
Notice Pleasebesuretoreturntheinstructionmanualinitsoriginalpackagetotheowner
afterexplainingproductoperationprocedures,maintenanceandinspectionmethods.
Electricdrill,Drill
Ratchetwrench,Adjustableendwrench
ElectricScrewdriver
Measure,Level,Plumbbob,Cutter,Pillar,Plastichammer
Foundationmaterials(Cement,Aggregate,etc)
Sealant,Caulkgun,pallet
CropperorSaw
Pleasepreparetoolsandmaterialsasneeded
NecessaryToolsandMaterialsForInstallation
PrecautionsDuringConstruction
Thecarportisasimplegarage.Donotchangeorremodelitforstorage,recreationalorresidentialpurposes.
Thisproductisforgeneralareas.Ithasasnowaccumulationstrengthof600N/m2(61.2kg/m2),which
correspondsto20cmofsnowfall.Donotinstallinheavysnowarea.
Donotinstallitintheplacewheresnowslidesdownfromthebuildingroofdirectly.
Wheninstallingitbesidesconcretewall,etc.,leavea10cmorlargergapbetweenthepostandthewalldueto
notclasheachotherduringstrongwind.
Besuretoprovideextrasupportpost(optional)wheninstallingitinstrongwindarea.
Wheninstallingitwithsidepanel,besuretosetupsupportpost.
Wheninstallingitwithsidepanel,recommendingtoinstallingitsfrontframeface
tothebuildingduetoreducethewindeffect.
Positioningthepostssothattheydonotaffectundergroundobjects(water
supply,drainpipes,etc.).
Whenmovingtheposts,pleasefollowthecompanyspecifications.
Followtheinstructionsandbesurethatallthespecifiedscrewsandboltsforassemblyaretightenedsecurely.
Donotuseanythingotherthanthespecifiedpartsoroptionalparts.
Thefoundationshouldcomplywithorexceeddimensionspecifications.
Allowsufficientcuringtimefortheconcrete(4to7days)anddonotplaceheavyobjectsonitorsubjectitto
vibrationsduringthecuringperiod.
Besuretokeepthenotebelowtopreventaluminummaterialscorrode.
⑴
Donotuseseasandforthefoundationsinceitcontainssaltandmaycausecorrosion.
Donotuseacementenhancer,water-reducingagentorcryoprotectant.Theymaycausethepoststocorrode.
⑵
Immediatelywipeoffanymortarorstainsfromthesurfaceofaluminumpartssincetheymaycausecorrosion.
⑶
Donotletaluminumpartscomeincontactwithothermetalssuchascopperoriron.Provideinsulationwith
vinyltape,bypainting,etc,.ifnecessary.Otherwisetheproductmaycorrode.
⑷
Besuretoprovidegravelforthefoundationtoallowdrainage,insertwaterdrainageholes(φ5)atthebaseof
thepostsandfoundation.Failuretodosomayleadtowateraccumulationinsidethepostsanddamagethemif
thewaterfreezesandexpandsinside.
Besuretoputthesealantglueasthefollowing.
⑴
Wipeoffanystainsfromthesealingpart.
⑵
Besuretoapplyasealant,asspecified.
⑶
Afterputtingthesealantglueontheholemadeinitsallwallbody,fullytightenthescrew.
⑷
Sealcompletelydeepenoughandfinishthesurfacewithapallet.
WhentheG.L(Groundline)issteep,besuretokeepthedepthofthepostatthelowestlevel.
Afterconstruction,checktheproductstoseeifthebolts,screws,nuts,etc.loosenoranydangerousplacesexist.
Besuretocheckiftheproducthasscratches,dentsordint.
Besuretoexplainproductoperationprocedures,maintenanceandinspectionmethodstotheowner.
PrecautionsDuringInstallation
enoughspace
spacemorethan10cm
concretewalletc
Thankyouverymuchforchoosingourcompany'sproducts.
Pleasebesuretothoroughlyreadtheseinstructionsforassemblyinorderto
properlyandsmoothlyassembleorattachthisproduct.