Changhong Electric S-CK Series User manual

Laser.changhong.com 1
Changhong S-CK Series Foldable Black Grid Screen
Front Projection Material
User’s Guide
Product Description:
The S-CK Series is an ultra-short throw fixed frame projection screen (Foldable) that uses black grid material
technology. It is designed for with Ultra-Short Throw Projectors only, for use in environments where ceiling light
cannot be entirely controlled. It includes an LED backlight kit and a bezel trim to further enhance the frame appearance.
Screen Maintenance
Dust, dirt and scratches on the projection screen surface will affect the quality and performance of the projection image.
For optimal results we advise to pay attention to the following instructions.
1) The screen surface has a horizontal structure. DO NOT wipe the screen up and down or in a circular motion.
Wipe from left to right only.
2) Please clean the dust on the screen surface with a soft brush or microfiber cloth (rough towel or cloth may damage
the screen’s surface).
3) Gently wipe the screen with a moistened microfiber cloth with mild soap diluted in water.
Notes:
The following precautions should be followed at all times to avoid damaging the material, which is not
covered under warranty.
Don’t UtouchUthe screen material to avoid leaving fingerprints. Use gloves when handling the material.
Don’t UscratchUthe material, as it will leave permanent markings on the screen’s surface.
Don’t Upoint Uto the screen material with a fingertip or other sharp objects to prevent damage to the material.
Don’t use acetone, benzene, alcohol and any other organic solvents to clean the screen material. Using such
chemicals will permanently damage the screen.

Laser.changhong.com 2
Hardware and Parts List
Please make sure all parts listed below are included before installation.
A. Elbow joint x4 pcs B. Top/Bottom horizontal frame
x4 pcs
C. Left/Right vertical frame x2 pcs D. Center joints x2 pcs
E. Center support bar x1-2 pcs F. Wall brackets x2-3 pcs G. M5x16 screw x24 pcs H. M6 Hex Step Nut x
2pcs
I. M6x12 Screw x 2pc J. Screw and anchor x 6-9 pcs K. Black Tape x1 bag L. Bezel trim x6 pcs
M. Corner sleeve x4 pcs
N. White gloves x2 pcs
Frame Assembly
1. Insert the center joint into one of the ½ horizontal frames and fasten it with the two M5x16 screws(G).
2. Insert the other ½ horizontal frame piece to the center joint and fasten also using two M5x16 screws.
3. Repeat steps 1 and 2 for assembling the second horizontal frame.
Push Push
4. Push 1xM6 Hex Step Nut into each of the horizontal frame.
Horizontal frame
Top right Frame
Top left Frame
Center joints

Laser.changhong.com 3
5. Insert the elbow joint (A) into each end of the horizontal frames (B) as shown below.
6. Insert the two vertical short frames (C) into the elbow joint (A).
7. Join the remaining horizontal long frame (B) with the frame built in the previous steps as shown below.
8. Make sure all four corners are properly in place to form a perfect square.
Horizontal Long frame (B)
Horizontal long frame (B)
Elbow Joint (A)
Push
Push
Elbow Joint (A)
Horizontal long frame (B)
Vertical short frame(C)
push
push
Push

Laser.changhong.com 4
Then fasten the four angles with the M5x16 Screws (G).
Four corners join correctly to form a perfect
rectangle. Use screwdriver to fasten the
M5x16 screws (G) into each corner by
aligning the frame screw holes to the holes
in the elbow joint (A).

Laser.changhong.com 5
Screen Material Installation
Please read this important note before proceeding with the installation process of the material:
Before handling the Black Grid material, put on the supplied pair of white gloves to avoid leaving fingerprint
marks, dust or hand oil on the material’s surface (Figure 1). The Black Grid material is very delicate and should
be handled with extreme care. Do not allow the material to fold or bend.Failure to follow instructions will result
in permanent damage to the screen material, which is not covered by warranty.
1. Remove the Black Grid material from the packaging tube and set it gently on a clean surface.
Tip: Carefully put a small flat weighted object at the edge (PVC/Velcro end) to prevent it from moving out of place.
Please keep the front of the material face down.
2. It is strongly recommended for two people to unroll the material to prevent the screen from bending or rolling
unevenly. Each person holds one end of the roll and slowly unrolls the screen in a clockwise direction (Figure 2).
3. Lay the material completely flat with the front facing down on a clean surface in a horizontal position (Figure 3).
4. Carefully and gently place the assembled frame on top of the screen material as shown below. Make sure to not
allow the angle edge of the frame to come in direct contact with the material to avoid puncturing or damaging it.
Screen material back facing up
Velcro
Figure 2
Back side of material
Front side of material
Horizontal position laid on a clean surface
Figure 3
Figure 1
Tip: Small weighted object

Laser.changhong.com 6
5. After all of the corners of the frame have been properly aligned (example D), attach the material on the frame in the
following order A→B→C→D (see instructions below for details).
Attach the screen material to the corners as shown below.
6. After all four corners have been attached; please check whether the screen material wraps the frame corners. If not,
please loosen the Velcro connection and repeat the above steps so the frame is not exposed.
7. Proceed to attach the rest of the material to the frame as described in the illustrations below.
Note:
Represents the
screen material
2) Fold over and attach
material to the Velcro
strip of the frame.
3) Fold over second side
and attach to frame
1) Stretch the screen material in
the direction of the arrowhead.
Note: The black shaded part
represents the Velcro on the
frame. That Velcro end will
ultimately attach with the
other Velcro end on the
screen material.
4) Repeat until all four sides
are done in the order A, B, C, D
A
B
C
D
D

Laser.changhong.com 7
Screen Material Removal
Follow the steps to properly remove the screen material from the frame. This procedure will ensure prolonging the life
of the screen material.
1. Detach the Velcro from the frame.
2. Gently pull back the material to release the material from the Velcro connections on the corners
Lay the Velcro end on the screen material
over the Velcro end of the frame and keep it
within the edge.
Proceed in the following sequence
①②
Attach in the following
sequence: a-b-c-d
D
The key is to attach within the middle
sections of 1 and 2. Then continue
attaching the remaining unattached areas.
Repeat the same steps on
remaining three sides in the
sequence A, B, C, D.
Grasp the middle of the screen
material and attach it to the Velcro
strip on the frame
A
B
C

Laser.changhong.com 8
Support bar installation:
1. Position the center support bar (E)in the middle of the frame and align the hole on each end of the support bar with
the M6 hex step nut (H) on the top and bottom frames. Then fasten with the M6x12 screws (I).
Pull back the screen material from
the Velcro connection along the
edges of the frame to detach it.
Support bar
Move the M6 hex screw to the middle area of the frames.
Align the M6 screws
with the two holes.

Laser.changhong.com 9
Edge trim Installation
Included is an black edge trim that provides an elegant ultra-thin bezel finish
1. Place the assembled frame on a flat and clean surface. The projection screen surface should be facing up.
a. As an option, Black Tape is supplied to cover any possible gaps between the pieces of the bezel trim. Align
the tape with the edge of the screen, as shown in Figure 1. Once properly aligned, apply the black tape to
the center of the top and bottom of the screen material.
Figure 1
2. Without removing the adhesive tape, place all the trim pieces along the edge of screen material. Adjust the trim so
that the top and bottom trim pieces are touching and show no gaps in the center. Refer to Figure 2 below for a
visual reference.
NOTE: Make sure the bottom edge trim with the Changhong Screens logo is installed on the correct side. The back of
the material should be labeled with a DOWN sticker to indicate the material is facing in the down position. The
Changhong Screens logo should be installed on the DOWN side
3. After properly aligning all trim pieces, carefully remove trim piece A(see Figure 3 below). Remove the inside
backing of the tape and place the trim piece in its original position on the frame. Repeat this step for the remaining
trim pieces in the following order: B-C-D-E-F.
Plastic corner sleeve x4pcs
Edge trim x 6 PCS
Black tape x1pcs
Screen Material
The black tape
The black tape
Trim
strip
Front Side
Back Side
TIP:
Align the trim starting
from the center to reduce
gapping. Any gaps left at
the corners will be
covered by the corner
sleeves.
Figure 2
White area
signifies
corner gap.

Laser.changhong.com 10
4. After the bezel trim has been installed, place a corner sleeve (M) on all four corners. Begin by aligning and
adjusting the corner sleeve through the front of the screen. Make sure the corner sleeve completely wraps the edge
of the bezel trim. This should cover any corner gaps.
Once all corner sleeves have been snapped into each corner of the frame, it is ready to be wall installation.
Diagonal Size Note
The Diagonal Size of the S100CK before and after installing the edge trim strip.
S120CK comparison
Before installing the trim strip
After installing the trim strip
Front side
Back side
The
front side
of the frame with trim pieces attached.
A
B
F
C
D
E
Corner gap
will be
covered by
the corner
sleeve (M).
Figure 3
White area
signifies
corner gap.
Before installing the trim strip
After installing the trim strip

Laser.changhong.com 11
UNotice to Installer:
Proper Projector Placement for Changhong S-CK Series
The Changhong S-CK Series is exclusively for table-mounted ultra-short throw projectors as illustrated in example
1 below. Overhead placement or a standard projector will make the image very dark, on account of the screen’s
absorbent layer deflecting light that is not aligned with its reflective angle.
31TExample 1: Proper Projector Installation
31TExample 2: Improper Projector Installation
Images are not up to scale and are for illustrations purposes only.

Laser.changhong.com 12
Installation
1. Correctly distinguish the top and bottom of the screen:
Place the assembled screen vertically on the ground. Look down on the screen, if the material is black it is
in the correct direction and ready for mounting on the wall. However, if the material is white, turn around
the screen and then install it.
Note: There are also “Top” and “Bottom” labels on the back of the screen material to help distinguish
the correct direction. Please make a note of this.
2. Preparing for installation
1) Locate your desired installation location with a stud finder (recommended) and mark the drill-hole area of where
the screen is to be installed. (The distance of the holes is between 1/3 to 2/3 the length of the horizontal frame.)
2) The installation height must be based on your projector’s throw height and the distance between your projector and
the screen, since this screen is just for Ultra-Short-Throw Projectors. Please refer to your projector’s distance
calculator for proper measurements.
3. Fixed installation
1) Drill a hole with the proper bit size according to the wood screws included.
2) Line up the wall brackets with the drilled holes on the installation location and screw them in using a Phillips
screwdriver.
3) Position the frame screen onto the wall brackets (F) as shown below.
4) The design of the wall brackets allows the frame to slide over them through its sides. This is an important feature of
the installation design as it allows your screen to be properly centered.
21TFor a local Changhong Screens contact or Technical Support, please visit
ULaser.changhong.com
Wall
Frame
Bracket
This manual suits for next models
1
Table of contents
Popular Projection Screen manuals by other brands

HAPRA
HAPRA DescenderPro Instruction book

Draper
Draper Premier PRE-28 installation instructions

Elite Screens
Elite Screens ezCinema Series Quick setup guide

Da-Lite
Da-Lite Floor Model C instruction manual

Da-Lite
Da-Lite Designer Da-Tab Electrol Instruction book

Da-Lite
Da-Lite DesIgner Contour Manual Instruction book

Elite Screens
Elite Screens Spectrum Series user guide

Draper
Draper 220V Access Installation and operating instructions

Music & Lights
Music & Lights FullScreen SCSP Series user manual

California Sunbounce
California Sunbounce SUN-SWATTER PRO operating instructions

LCI
LCI Screen Defender OEM INSTALLATION MANUAL

Axxess
Axxess AX-LCD installation instructions