CITY HOOPS GOLD User manual

GOLD / CHGOLD01
INSTALLATION AND
OWNER’S INSTRUCTIONS
1

SAFETY INSTRUCTIONS
2
WARNING
FAILURE TO COMPLY WITH ANY OF THE WARNINGS IN THESE
INSTRUCTIONS MAY RESULT IN PERSONAL INJURY
FAILURE TO COMPLY MAY ALSO RESULT IN PROPERTY DAMAGE.
PLEASE HEED ALL WARNINGS AND CAUTIONS TO ENSURE YOUR SAFETY
DO NOT ATTEMPT TO ASSEMBLE THIS SYSTEM WITHOUT CAREFULLY READING
AND FOLLOWING ALL INSTRUCTIONS. BEGIN BY IDENTIFYING AND TAKING
INVENTORY OF ALL PARTS USING THE PARTS LIST PROVIDED.
A MINIMUM OF THREE ADULTS IS
REQUIRED TO LIFT UNIT INTO PLACE
BEFORE YOU START
A. Identify and inventory all parts using the checklist boxes in the parts list. Be sure to keep the
hardware bags and their contents separate.
If any parts are missing call our Customer Service Department 1(866)-611-8552.
B. Test fit all bolts by inserting them into the respective hole. If necessary, carefully scrape away any
excess powder coating buildup from inside the holes. Do not scrape away all of the powder coating.
Bare metal may rust.
SAFETY INSTRUCTIONS
FAILURE TO FOLLOW THESE SAFETY INSTRUCTIONS MAY RESULT IN SERIOUS INJURY OR
PROPERTY DAMAGE AND WILL VOID THE WARRANTY. The owner must ensure that all players know
and follow these rules to safely operate the system. Proper and complete assembly, use and supervision is
essential for proper operation and to reduce the risk of accident or injury. A high probability of serious injury
exists if this system is not installed, maintained, or operated properly.
●If using a ladder during assembly, use extreme caution. Follow all warnings and cautions on the ladder
carefully. ● 3 people are required to lift the unit into place. ● Before digging, contact the appropriate
agency to locate underground power cables, gas, and water lines. Do not install the system within 20 feet
of overhead power lines. ● Climate, corrosion,or misuse could result in system failure. ● If technical
assistance is required, contact the manufacturer. ● Minimum operational height is 5' to the Rim. Most
injuries are caused by misuse and /or failure to follow instructions. Use caution when using the system.

GOLD / CHGOLD01
3

GOLD / CHGOLD01
4
STAGE 1 OF 2
IN-GROUND ANCHOR SYSTEM
Tools & Materials Required
For Complete Installation
1. 2 Adjustable Wrenches 10. Concrete - ½ Yard or 14-16
2. Socket Set Bags, (30kg / 66lb each)
3. 9/16” Wrench 11. Phillips Head Screwdriver
4. ¾” Wrench 12. A minimum of 2 Ladders
5. 15/16” Wrench 13. Spirit / Bubble / Carpenter Level
6. ½” Wrench 14. Water Supply
7. Hammer or Mallet 15. Pole hole digger / earth auger
8. Tape Measure 16. 20” Sonotube IF REQUIRED
9. Shovel 24” Sonotube (for Diamond) IF REQUIRED

GOLD / CHGOLD01
5
STEP 1 (Digging The Footing)
Before digging, call to locate any buried utility lines.
NOTE: The back of the anchor kit must be 15 inches away from any
wall, fence, or obstruction to allow room for the adjustable crank.
A. Dig a hole 48" deep and 21"x 21"square: The edge of hole should be
flush with the edge of the playing surface. If you live in an area where
heavy frost can occur, it may pose a problem, consult your local building
inspector to determine appropriate hole depth.
NOTE: Hole must be at least 48” deep.
B. Build a form before pouring the concrete pad, to ensure that the top of
the concrete remains straight and square. The form should be placed
about ½” above the playing surface to allow for water drainage.
C. Bell out the bottom of the hole.
NOTE: A square hole prevents the rotation of the concrete.
NOTE: The area behind the playing surface must be cleared off by at
least 3 feet to enable the user to stand behind the pole to adjust the rim
height.
STEP 2 (Assembling Anchor Template)
D. Thread a 18mm Hex Nut (U4) onto each of the 18mm J-Bolts (U2).
Securely tighten the nuts all the way down to the end of the threads.
E. Slide the threaded end of the J-Bolts through the holes in the Anchor
template (u1) and secure each J-Bolt with a 18mm J-Bolt Hex Nuts (U4)
as shown. Securely tighten all nuts at this time.
NOTE: Make sure the curved “J” ends of the J-Bolts are oriented in a
rectangular pattern, as shown.

GOLD / CHGOLD01
6
STEP 3 (Concrete)
F. Mix the concrete according to the instructions on the bags. Note that a
thicker mix of concrete will dry stronger than a thin mix. Pour the
concrete into the hole, stopping approximately 18 inches from the top of
the hole.
G. Insert the four pieces of Anchor Rebar (U5) into the hole, pushing each
piece firmly to the bottom of the hole. The four pieces should be
arranged in a square approximately 8 inches wide so that each piece of
rebar will be positioned next to the J-Bolts when the J-Bolt template is
placed in the concrete.
H. Finish filling the hole to the top with concrete. The top of the concrete
should reach just above the level of the top of the form.
STEP 4 (Inserting J-Bolt Anchor Template)
I. Position the J-Bolt Template (U1) over the wholes as shown with sides
of the plate square with the sides of the hole / court.
J. Push the J-Bolts (U2) into the concrete until the J-Bolt Template is
resting flat approximately 1” above the surface of the concrete.
K. Grasp the tops of the J-Bolts and agitate the Template assembly back
and forth repeatedly to eliminate any air bubbles in the concrete. Lift the
Template slightly above the concrete when agitating. Make sure the
Template is resting on the concrete after agitating. Form the concrete
into a downward slope away from the Pole (center) to allow water
runoff.
L. Clean any concrete that may be on the J-Bolt Template or the exposed
portions of the J-Bolts.
M. Using a spirit / bubble level, make sure the Template is square to and
level with the playing service.
O. Allow the concrete to cure for a minimum of 5-7 days.
YOU ARE NOW FINISHED WITH THE INITIAL ASSEMBLY STEPS. DO NOT PROCEED
WITH THE REMAINING ASSEMBLY UNTIL THE CONCRETE HAS FULLY CURED.
CURING WILL TAKE A MINIMUM OF 5-7 DAYS. IN HUMID CLIMATES OR WET
WEATHER, ALLOW ADDITIONAL TIME FOR THE CONCRETE TO CURE.

GOLD / CHGOLD01
7
STAGE 2 OF 2
ASSEMBLY OF YOUR CITY HOOPS
BASKETBALL SYSTEM
Tools & Materials Required
For Complete Installation
1. 2 Adjustable Wrenches 10. Concrete - ½ Yard or 14-16
2. Socket Set Bags, (30kg / 66lb each)
3. 9/16” Wrench 11. Phillips Head Screwdriver
4. ¾” Wrench 12. A minimum of 2 Ladders
5. 15/16” Wrench 13. Spirit / Bubble / Carpenter Level
6. ½” Wrench 14. Water Supply
7. Hammer or Mallet
8. Tape Measure
9. Shovel
WARNING
NEVER USE THE SYSTEM WITHOUT FOLLOWING THE CEMENTING &
CONCRETE INSTRUCTIONS. FAILURE TO FOLLOW ALL THESE
INSTRUCTIONS AND WARNINGS COULD LEAD TO SERIOUS
PERSONAL INJURY OR PROPERTY DAMAGE AS LISTED ON PAGE 2.

GOLD / CHGOLD01
8
WARNING
DUE TO THE SIZE AND WEIGHT OF THE SYSTEM, A MINIMUM OF
THREE ADULTS ARE REQUIRED FOR THE FOLLOWING STEPS
STEP 1 (Assembling The Vertical Post)
A. Slide a 18mm Thick Washer (U3) over each of the J-Bolts (U2) as shown in FIGURE 1A
B. Remove the Padding from Main Post (A). Place the Main Post (A) over the J-Bolts. Slide a 18mm Thick Washer
(U3), a Lock washer M18 (U6) and thread a 18mm Hex Nut (U4) to each J-Bolt. Tighten the nuts only a few
turns onto the J-Bolts as shown in FIGURE 1B.
C. If the Main Post (A) is not exactly vertical, adjust the 18mm J-Bolt Hex Nuts (U4) located under the Post Base.
Tighten all of the Hex Nuts (U4) above Post Base when Main Post (A) is vertical.
NOTE: Face the Main Post (A) with Actuator Bracket facing away from the playing court (as shown in FIGURE 1C.)
STEP 2 (Assembling Main Extension Arm)
A. Slide the Main Extension Arm (F) over the top of the Main Post (A) and
attach to the lower pivot tube with one Hex Bolt M18x320mm (#4), two
flat washer M18 (#8), two Nylon washers M18 (#1), and one lock nut
M18 (#10)
NOTE: DO NOT OVER TIGHTEN THIS BOLT AND NUT. Make sure
nylon washers are located between Main extension arm (F) and
Main post (A)

GOLD / CHGOLD01
9
STEP 3 (Assembling Adjustable Actuator)
A. Connect Actuator to Main Extension Arm
Place the upper bracket of Actuator (B) between last set of
welded tubes on the Main Extension Arm (F), attach the two
parts using Hex Bolt M18x320mm (#4), two Flat Washers M18
(#4), one Lock Nut (#10),
B. Connect Actuator (B) to mounting bracket welded in middle
of Post (A), using one Hex Bolt M16x135mm (#7), two flat
washers for M16 Bolt (#9), two Nylon washers (#2), and one
Lock Nut for M16 bolt (#11)
Note: make sure nylon washers go between actuator and
mounting bracket
C. Attach Crank Handle to the actuator. Slide Removable Crank
Handle onto the shaft sticking out of Gear Box (Actuator), lock it
in place with attached pin.
STEP 4 (Assembling Spring Cartridge)
A. Slide Steel Sleeve (J) thru the tube welded at the top end of
Spring Assist Cartridge (C). Place the top of Spring-Assist
between Main extension (F), align the Steel Sleeve (J) with the
second set of welded tubes on the Main Extension Arm (F),
place the Plastic rim Height Indicator (K) beside the
Spring-Assist Cartridge (C).
Slide one Washer M16 (#9) over one Hex Bolt M16x320mm
(#5), and slide this Bolt all the way thru Main Extension Arm (F),
one Nylon washer M16(#2), Steel Sleeve (J), Rim Height
indicator (K), another Nylon washer (#2) and the other side of
Main Extension Arm (F). Secure it with one Flat Washer M16
(#9), and One Lock nut M16 (#11).
Do not over tighten this bolt because this is the pivot point.
Make sure the Stainless steel Rim Height Indicator(K) hang
freely along side of Spring-Assist Cartridge. Nylon washer
locates between Steel sleeves (J) and Main Extension Arm (F).
B. Attach the bottom of Spring-assist Cartridges to the Main pole
Bracket by using a Hex Bolt M16x120mm (#6),two Flat Washers
M16 (#9), Two Nylon Washers M16 (#2) and one Lock Nut M16
(#11).
C. Remove and discard the spreader bracket from the cartridge.

GOLD / CHGOLD01
10
STEP 5 (Assembling Upper Extension Arms)
A. Attach the 2 Upper Extension Arms(G) to Main Post (A), with a Hex Bolt M16x320mm (#5)), two Flat Washers
M16 (#9), two Nylon washers M16 (#2), and One Lock Nut(#11).
CAUTION:
Injury may occur if Upper Extension
Arms are allowed to fall off Main
Extension Arm during assembly.
STEP 6 (Assembling Backboard To Extension Arms)
A. Attach the Backboard to Main ExtensionArm(F) by using one Hex Bolt M16x320 (#5), two Flat Washers M16
(#9), two Nylon washers M16 (#2), one Lock nut M16 (#11). Note: Nylon washers go between Main extension
Arm Bracket (F) and Backboard H frame.
Repeat the same process with Upper Extension Arm (G) by using one Hex Bolt M16x320 (#5), two Flat Washers
M16 (#9), two Nylon washers M16 (#2), one Lock nut M16 (#11).

GOLD / CHGOLD01
11
STEP 7 (Assembling Rim To Backboard)
A. Insert the 4 Plastic and Steel Spacers (M) into
the 4 holes on the backboard.
CAUTION: Do not proceed with rim
installation without these spacers.
B. Remove the screws on Rim Spring Box Cover, open the
Spring Box. (Rim cover may be separate in the package)
C. Mount the rim to the H-Frame Backboard Mount (H) and
Backboard Assembly using the hardware supplied in rim
box.
D. Reattach Spring Box Cover to the Rim
with removed screws.
NOTE: Use a level to make sure rim is level side to side
before tightening bolts.
STEP 8 (Assembling Rim Height Sticker)
A. After everything is square / level, make sure all nuts on the
system have been tightened.
NOTE: Do not over tighten the Nuts, make sure the unit
can be adjusted up and down.
B. To apply the Rim Height Sticker (in the manual pack), first
use a tape measure to crank rim up to exactly 10’ from the
playing surface. Use a pencil or non permanent marker to
make a mark on the Spring Assist Cartridge (C) where the
bottom of the Rim Height Indicator (K) stops.
Peel and apply Rim Height Sticker to outside of
Spring-Assist Cartridge © lining up the pencil mark with
the 10’ mark on the Rim Height Sticker. See Detail A
C. Attach Post Pad & Gusset Pad to Main Post (A) as shown.
This manual suits for next models
1
Table of contents
Other CITY HOOPS Sport & Outdoor manuals