manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Clear
  6. •
  7. Docking Station
  8. •
  9. Clear ClearPOWER P2 User manual

Clear ClearPOWER P2 User manual






























Thank you for purchasing a ClearPOWER P2. The
ClearPOWER P2 ensures that your home’s essentials are
powered during the event of a power outage and you also
have portable power wherever you are and for all your
on-the-go-needs.

●ClearPOWER P2 is an all-in-one plug-n-play energy
charging, storage and powering solution. It can power
refrigerators, lights, TV’s, internet modems, microwaves,
fans and more if your home loses power from the grid or
if you need power on the go.

●ClearPOWER Docking station integrates the P2 into
your homes breaker panel and circuits to automatically
charge via grid or solar and power up to 3 essential load
circuits (15 amps each).


































CAUTION Hazardous voltages are present inside ClearPOWER P2, Docking station and Breaker panel
enclosures that can cause death or severe personal injury. Follow proper installation, operation and
maintenance procedures to avoid hazardous voltages. Turn off the main circuit breaker in the load
center before starting installation.



1. Identify installation location of the Docking Station. Most installations are done in utility rooms in proximity
to the home’s breaker panel.
2. Use Template to mark the lag locations that correspond with the lag holes on the back of the docking 
station and the hole for the provided power whip (called the ClearPOWER installation cable).
3. Make sure lags will screw into studs or other secure surface.
4. Cut hole where the ClearPOWER installation cable will attach.
5. Attach ClearPOWER installation cable to the Docking Station.
6. Screw lags into studs 80% on previously marked location.
7. Hang Docking Station using “Eyelet holes” that are pre-drilled and located on the back of the Docking 
Station
8. Tighten lags completely.



1. Fish other end of ClearPOWER installation cable to 4 Square location.
2. Attach 4 Square Box to ½” knock-out and secure using locking.
3. Mount 4 Square Box.



1. Identify 3 critical circuits to be backed-up by the ClearPOWER ClearPOWER P2.
2. De-energize panel breakers.
3. Run wires from the panel protected in conduit, Sealtite, Flex or other appropriate means to the 4 Square
Box.
4. Label and Mark wires according to the provided wiring diagram in order to easily match with the labeled
wires on the ClearPOWER installation cable.
5. Connect to corresponding wires on the ClearPOWER installation cable located in the 4 Square Box.
6. Connect corresponding wires (hot, neutral and ground) to the breakers following the provided wiring guide 
and wire numbers.
7. Energize the breaker panel and test.


1. Run PV wire from the solar panels, through appropriate conduit, to the 4 Square Box.
2. Install disconnect to the PV power cables.
3. Ensure disconnect is off.
4. Follow the provided wiring guide connect PV power cables to the ClearPOWER installation cable in the 4
Square Box.
5. Turn disconnect switch on and energize the circuit.
6. Test



***Optional and purchased separately. Used for connecting to existing solar arrays with micro-inverters
and/or optimizers.

1. Find and identify ideal mounting location for relay box on rooftop rack mounting.
2. Identify up to 3 optimal panels to use for wiring into the ClearPOWER Docking Station to charge
ClearPOWER ClearPOWER P2.
3. Using MC4 connectors and Y Branch connector to split the + and – leads from each solar panel before the
micro-inverter and/or optimizer.
4. Attach the + and – leads to the relay box.
5. Using approved methods bring #10 AWG wire from the ClearPOWER RelayBox to the installed 4 Square
Box dedicated to the ClearPOWER DockingStation.
6. Run outside rated #18 AWG (signal wires) from the ClearPOWER RelayBox to the 4 Square box dedicated
to the ClearPOWER DockingStation.
7. Connect solar wires in the RelayBox and junction box.
8. Connect the signal wires in the RelayBox and in the Junction Box.
9. Re-install plates and re-mount solar panels
10. Test




Tool
Appearance
Description
Multimeter

Used to check cabinet insulation
and cable connection, and
measure electronic performance
specifications of a device, such as
voltage, current, and resistance.
Label paper

Used to prepare labels.
Insulated phillips screwdriver (2
mm x 150 mm and 3 mm x 250
mm)

Used to tighten screws and bolts.
Insulated socket wrench

Used to tighten bolts and nuts.
COAX crimping tool

Used to crimp cord end terminals.
Diagonal pliers

Used to cut insulation cables and
cable ties.
Wire stripper

Used to remove the insulation
layer and jacket from a
communication cable with a small
cross-sectional area.
PVC insulation tape

Used to insulate wires and
conductors.
Cotton cloth

Used to clean panels and shells.
Heat shrink tubing(M6)

Used to insulate wires and
conductors.
Heat gun

Used to heat a heat shrink tubing.
Electrician's knife

Used to strip cables.
Protective gloves

Used to protect hands and the
device on which you operate.
ESD gloves

Used to prevent the electrostatic
discharge (ESD) from damaging a
board or other electrostatic
sensitive devices (ESSDs) when
you insert or remove a board or
hold an ESSD.
Insulated gloves

Used to insulate hands.
Hydraulic pliers

Used to crimp the OT terminals
and JG terminals with a large
cross-sectional area of 10 mm2,
16 mm2, 25 mm2, or 35 mm2.
Cable tie

Used to bind cables.




1. PV Wire + (Red) #10 AWG
2. PV Wire – (Black) #10 AWG
3. Control Wire (Purple) #18 AWG
4. Control Wire (Orange) #18 AWG
5. Ground (Green) # 6 AWG






1. Power to Docking Station (Black) #14 AWG
2. Neutral to Docking Station (White) #14 AWG
3. Circuit #1 From Breaker (Red) #12 AWG
4. Circuit #2 From Breaker (Red) #12 AWG
5. Circuit #3 From Breaker (Red) #12 AWG
6. Appliance/Circuit #3 (Black) # 12 AWG
7. Neutral #1 to Neutral Bar (White) #14 AWG
8. Appliance/Circuit #2 (Black) #12 AWG
9. Neutral #2 to Neutral Bar (White) #14 AWG
10. Appliance/Circuit #1 (Black) # 12 AWG
11. Neutral #3 to Neutral Bar (White) #14 AWG
12. Empty









Popular Docking Station manuals by other brands

Channel Vision A0602 instructions

Channel Vision

Channel Vision A0602 instructions

Lenovo ThinkPad USB-C Dock user guide

Lenovo

Lenovo ThinkPad USB-C Dock user guide

Bosch 1 687 023 911 operating instructions

Bosch

Bosch 1 687 023 911 operating instructions

Cavalry EN-CAHDD2B-D instruction manual

Cavalry

Cavalry EN-CAHDD2B-D instruction manual

VisionTek THUNDERBOLT VT5400 user manual

VisionTek

VisionTek THUNDERBOLT VT5400 user manual

Sabrent HB-THUC user manual

Sabrent

Sabrent HB-THUC user manual

iHome iB970 instruction manual

iHome

iHome iB970 instruction manual

CipherLab 8001 quick guide

CipherLab

CipherLab 8001 quick guide

Philips DS9000/27 user manual

Philips

Philips DS9000/27 user manual

VIETA VH-MS150BK user manual

VIETA

VIETA VH-MS150BK user manual

Fantec MR-3e manual 

Fantec

Fantec MR-3e manual 

AMX Modero ViewPoint MVP-8400 Dimension Guide

AMX

AMX Modero ViewPoint MVP-8400 Dimension Guide

Lindy 43236 user manual

Lindy

Lindy 43236 user manual

Beam Iridium SatDOCK 9555 Installation & user manual

Beam

Beam Iridium SatDOCK 9555 Installation & user manual

Intermec FlexDock DX4 quick start guide

Intermec

Intermec FlexDock DX4 quick start guide

StarTech.com DK30CHHPD quick start guide

StarTech.com

StarTech.com DK30CHHPD quick start guide

Parrot Zikmu user guide

Parrot

Parrot Zikmu user guide

iHome ZN10 user manual

iHome

iHome ZN10 user manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.