
Cleveland
™
Project ________________________________
Item __________________________________
Quantity _______________________________
FCSI Section ____________________________
Approval _______________________________
Date __________________________________
1333 East 179 St.,
Cleveland, Ohio, U.S.A. 44110
Tel: 1-216-481-4900
Fax: 1-216-481-3782
Web Site: www.ClevelandRange.com
Email: Steam@ClevelandRange.com
COOK CHILL SYSTEMS Cook/Chill S stems
SECT. XIV PAGE 53
0907
GAS FIRED STEAM BOILERS
MODELS:
GFB-6
GFB-15
GFB-30
GFB-60
GFB-10
GFB-20
GFB-50
Cleveland Standard Features
IComplete skid-mounted and piped gas fired Steam Boiler with
Vertical Return System and Blow Down Separator
IAvailable for Pressure Ratings from 15 to 150 psi (specify
required operating pressure)
IVertical Tubeless design
IFully insulated Boiler with top mounted down-fired burners
IHigh Temperature Insulation assists thermal efficiency of 80%
ISpinning Cyclonic Flame travels down the entire length of the
Combustion Chamber
ITop Flame Retainer increases occupancy time of flue gases to
complete combustion process
IOperating Pressure Control and High Limit Pressure Control
with Manual Reset
IWater Column with Water Gauge Assembly
IAll necessary valves are included
IAutomatic Water Feed System with probe type Water Level
Controls and single phase Motor for Pump
ISteam Outlet conveniently located at top of Boiler
IControl Panel factory mounted and wired ready for power con-
nection
IBuilt and stamped to A.S.M.E. Code
IRegistered with the National Board of Boiler & Pressure Vessel
Inspectors
IAccepted for use in U.S.D.A. Inspected Facilities
Options & Accessories
ËStainless Steel outer Jacket
ËAutomatic Boiler Blow-down Controls
ËApplicable Controls to meet the various special insurance
local state or federal code requirements
ËElectric heated Steam Boilers
ËOil-fired Steam Boilers
ËCooling Kit for boiler drain
ËAquastat automatic drain cooling kit
ËLarger models availabe on request
Shall be CLEVELAND Mo el GFB -____, gas-fire , vertical, tube-
less LARGE STEAM BOILER System, _____H.P. (horse power);
Complete with Power Burners; Ski mounte an pipe with
Vertical Con ensate Return System an Blow-Down Separator
Package; Factory assemble as a self-containe unit, in accor-
ance to U.L. requirements, an A.S.M.E. Section 1 (one) Co e;
Guarantee pro uction of _______ poun s of Steam per hour at
212˚F.
Short Form Specifications