Installation Guidelines
The 144 Port MAQS System has three connection types:
• DSL - RJ21/Champ connector to DSLAM
• Distribution/Line - signal to customer’s premise
• Feeder/POTS - signal to CO
To reduce the risk of fire, use only No. 26 AWG or thicker
gauge telecommunication line cord/cable. Maintain wire twist.
Copyright © 2020, Comtest Networks Inc.
144 Port MAQS System
Installation Guide
Installation - Attach Ground. There two locations available
For Assistance
techhelp@comtestnetworks.com
1-877-369-5499
www.comtestnetworks.com
Ground
Attach DSL cables
Ground
Pin 1