
7
Using the 3mm & 8mm wrenches,
loosen/remove the two drive shaft support
bracket bolts at each end of cross rail.
(pic.5 & pic.6)
2.
With the “inner leg” FULLY extended join
the cross rail to the leg and carefully insert
the gear into the track. (pic.5) Make sure the
inner leg is FULLY extended and the gear is
properly engaged with the track.
*TIP: The screw head at the end of the
geared track should be aligned with the
approximate center of the drive shaft/gear
when the leg is at max height. (pic.7)
Once cross rail is secured to legs, make sure
the gear is seated with the geared track then
tighten shaft support bracket bolts. (pic.8)
d.
pic.5
pic.6
pic.7
screws for shaft support
screw from below cross rail
long bolt
short bolt
*TIP:
pic.8
Basic Assembly of Desk Shipped “KD” (knock down)
Assembling Cross Rail to Columns (Legs)
(continued)
c.
e.
CRITICAL!!! Make sure the
gears in both columns (legs)
are aligned at the exact same
position in each gear track per
above *TIP and picture 7.
coronagroupinc • 205.941.1942 • coronagroupinc.com