CUBEX MARK II Series User manual

INSTRUCTIONS: CUBEX - MARK II Series
Cubex Co., Inc. 06-03 Rev 9
CUBEX
Quad Antennas
MK II – PT3
MK II – PT5
Safety warning
Please read through these instructions completely before starting
your installation.
Antenna work is dangerous. Always wear an OSHA approved
safety harness with the appropriate nylon or wire rope safety
lanyards to protect yourself and your helpers from falls. Also all
helpers on the ground should be wearing hard hats to protect them
from falling objects such as tools etc.
Cubex Co., Inc. has no control over the conditions at the antenna site and therefore can not be
held responsible for any damage or injury to persons or property.
If for any reason you do not understand any part of these instructions, or your installation
is different and these instructions do not pertain to your situation. Do not hesitate to call
Cubex Co., Inc. for assistance at (561) 748-2830
Note: Take precautions when handling and further processing fiberglass material. It
is recommended that gloves be used when working with this material.
Price: $ 4.95 US

Instructions:Cubex - MARK II Series
Cubex Co., Inc. 06-03 Rev 9
Pg. 2
A S S E M B L Y I N S T R U C T I 0 N S
The CUBEX MK II PT 3 and 5 Band QUAD ANTENNA
FOREWORD: The CUBEX MK II is a pre-tuned Quad Antenna. All elements are factory
measured and under normal conditions should not require adjustment. Elements are designed
for operation in the center of each band. Should one wish to favor the low or high end of one or
more bands, limited “tuning”, is provided for at Note 2 at the end of the Instructions. It is
recommended that the assembly Instructions be read completely prior to starting Installation.
1. Begin antenna assembly by laying one of the “spider” castings on the ground with the
“trough” facing upward. Place the butt ends of four spreader arms in the spider troughs. BE
SURE the arms are all similar (Driven Element or Reflector). Fasten each spreader arm to its
respective casting arm using two “gear” driven clamps on each arm. One clamp is located
near the butt of the arm and is positioned between the two guides on the outer face of the
casting. The other clamp is positioned near the end of the casting arm in the depression
provided for it. The gear driven clamps are assembled and tightened by hand using a
screwdriver. With the screw head facing upward, loop the strap around the arm, positioning
the adjustment screw next to the arm and tighten slightly.
Final permanent tightening should be done at the very end of the wire element assembly after
everything has been positioned properly. The same procedure is followed for the remaining
assemblies.
2. Select the 10 METER DRIVEN ELEMENT, remove only the Twist Ties and carefully uncoil
and gently straighten the element (Use similar technique for all elements). This will permit the
element wire bundle to be laid out straight in preparation for stringing through the spreader
arms.
3. The stringing procedure is illustrated by Figure 3 and there will be less of a tendency to
tangle if this procedure is followed closely.
As the wire element is unfolded, carefully remove the tape and straighten the “bends” enough
to allow passage through the holes drilled in the spreader arms, but try and retain enough of
the kink so that it can later be centered in each respective arm for the purpose of maintaining a
uniformly square structure configuration.
The 10 meter elements are strung through the first set of holes nearest the butt end of the
arms; 12 meter next (optional) 15 meter elements near the center of the arms; then 17 meter
(optional) and finally the 20 meter elements near the tips of the arms. BE SURE that Driven
Element wires are used with Driven Element ARMS, Reflector wires with Reflector ARMS.
The wire ends of all DRIVEN ELEMENTS are terminated at a special DRIVEN ELEMENT
TERMINAL BLOCK as shown In Figure 1. (Separate terminal block for each band) or at the
CUBEX MATCHING TRANSFORMER (optional item).

Instructions:Cubex - MARK II Series
Cubex Co., Inc. 06-03 Rev 9
Pg. 3
If one wishes to assemble the antenna for operation with the Cubex Matching
Transformer, it is recommended that the 15 meter DRIVEN ELEMENT be strung
first and loosely linking the driven element ends together. The 1O and 20 meter
wires are then brought to the same point as they are installed. (Note, If used, the 12
and 17 meter wires can then be added). The transformer can then be installed at
the 15m point and the various driven elements positioned and tensioned
appropriately.
The wire element ends of the 20 meter and 10 meter DRIVEN ELEMENTS have extra long
“fold backs”. These provide the slight added length needed for attachment to the Cubex
Matching Transformer. When all DRIVEN ELEMENTS are terminated separately, this excess
fold back is simply trimmed off and discarded.
3. For REFLECTOR assembly, the procedure is the same as step 2 except that the wire
element ends are simply brought together at the “end kinks”, spliced (recommend “lineman’s
splice” and soldered.
After the 2 element assemblies (Driven and Reflector) have been completed, the boom should
be temporarily supported on a 9 to 10 foot step ladder or lashed to the side of a tower at a
height which will permit the bottom element wires to clear the ground.
WARNING - THE CUBEX SPIDERS HAVE BEEN PRE-SPREAD USING A
MICROMETER FOR PRECISE MEASUREMENT. TO FORCE THE UNITS OPEN PAST
THE ALREADY PRE-DEFINED LIMITS WILL RESULT IN BREAKAGE OF THE CAST
UNITS.
4. The REFLECTOR assembly, is placed at the end of the boom and the DRIVEN
ELEMENT is placed at the other end of the boom. (8 ft. on standard boom, and 12 ft.
separation on Long Boom option) After the assemblies are in place on the boom they should
be rotated and aligned so that all bottom element wires are parallel to the ground.
Place the BOOM/MAST COUPLER (cast or alum. plate) at the center of the boom. Fasten the
coupler to the boom using the supplied bolts. 2” OD booms require 2 - 2”x5/16” U-bolts with
the HD 3” O.D. boom option requiring 4 - 3”x3/8” U bolts. All U-bolts are secured using, nuts
and lock washers. The bolts should be tightened on the boom sufficiently to preventing rotation
of either with respect to the other.
5. As an aid to lifting the array, an 8 to 10 foot pole or pipe section (GIN POLE) may be
temporarily secured to the mast or tower. The Gin Pole is a pole or pipe that has a small pulley
at the top. Using a strong rope the antenna can be pulled up to the final mounting position by
an assistant with little danger to the tower climber. This will usually facilitate getting the array
up to the top of tower, mast, etc.
The antenna array is then lifted into place on the tower and the boom/mast coupler plate is
secured to the mast using the supplied hardware. The antenna & boom assembly is bolted to
the mast using the supplied U-bolts 2” or 3”. REMINDER: DON’T TAKE CHANCES. USE A
CLIMBING BELT OR SAFETY HARNESS WHILE ON A TOWER. THE LIFE YOU SAVE
COULD BE YOURS!

Instructions:Cubex - MARK II Series
Cubex Co., Inc. 06-03 Rev 9
Pg. 4
CAUTION; While every effort has been made in designing and fabricating both the spreader
arms and the spiders for maximum strength, it is possible to suffer breakage if the assembly is
dropped or impacted against buildings, trees, etc., Use care in handling.
6. FEEDING THE, 2 ELEMENT QUAD. The feed-point impedance’s of this antenna will
vary with each band. Twenty meters is about 50 ohms, Fifteen meters = 75 ohms and Ten
meters is about 110 ohms. The CUBEX matching transformer is a combination unbalanced to
balanced and impedance transformation device. It will allow for single feed line with
acceptable SWR while using 3 or 5 bands of operation.
An alternative method of feeding the multi band quad utilizes a remote antenna switch such as
the AMERITRON RCS-8V. When using the remote antenna switch or separate feed lines for
each band it will be necessary to fabricate Co-Ax matching sections from 75 ohm RG11U
cable. These must be an “Odd” one-quarter wavelength to function properly (1,3,5, ,etc.).
For 10 meters use69 inches of RG/11U attached to 10 -meter DRVN. EL. FEED POINT and
any length of RG8/U from the other end of the RG/11U to the transmitter.
For 15 meters, use92 inches of RG/11U attached to the 15-meter DRVN. EL. FEED POINT
and any length of RG8/U from other end of RGII/U to the transmitter.
Any excess cable can be coiled (6” dia.) and taped together.
See Table I on the following page for dimensions of linear matching sections.
NOTE: In some situations it maybe be better to make a 3/4 wave (207 in) 75 ohm 10 m
stub. Any excess cable should be wrapped and taped into a 6” coil.
Where a REMOTE SWITCHING SYSTEM is used, one would position the remote unit at a
point on the boom where both 10 and 15 meter matching sections could terminate at the box.
This would eliminate splicing of cables, Baluns are generally not needed and have proven
effective in only a small percentage of unusual situations. Fortunately, the great majority of
quad installations perform very satisfactorily without the need to resort tocomplicated
matching systems, but in an occasional "rare" case of difficulty, the Gamma Match (either
individual or Tri-Gamma) has proven to be a good solution. For Gamma Match information
see “Old Notes” at end of instructions.
The CUBEX matching transformer is an excellent choice for matching the antenna system to
the transceiver. It is rated at 1.5kw PEP and allows for a single FEED LINE and matches the
CUBEX antenna without the hassle of complicated matching networks.
Good luck and DX –

Instructions:Cubex - MARK II Series
Cubex Co., Inc. 06-03 Rev 9
Pg. 5
Note: These terminals are not supplied when Cubex Matching Transformer is ordered with Antenna.
Matching Stub dimensions: Table I
Electrical Quarter wave 75 ohm coax ; velocity factor = 0.67
BAND CABLE TYPE LENGTH (IN.) LENGTH (CM)
10 Meters RG11/U 75 ohm 69 in
(3/4 w-17’-3”) 175.25 cm
(5.2575m)
12 Meters RG11/U 79-9 ½” in
(3/4w=19’-11”) 202.74 cm
(6.082m)
15 Meters RG11/U 92 in.
(3/4w=23’-0”) 233.68 cm
(7.01m)
17 Meters Note 3
20 Meters RG 8/U 50 ohm Any length
40 Meters RG11/U 23.35 ft (420 in) 7.1171 m
Note 1- that any length 50 ohm coax maybe connected to the end of these matching stubs.
Note 2- Some experimentation may be required in adjusting each matching stub to optimize the
impedance transformation.
Note 3- 17 meters should not require any stub and match okay with 50 ohm cable.
Note - Cables supplied by Cubex may vary in length (longer) from above as we use a special
RG-11 coaxial cable with a VF of 0.72
L
Dimensions above
Figure I

Instructions:Cubex - MARK II Series
Cubex Co., Inc. 06-03 Rev 9
Pg. 6
QUAD LOOP DIMENSIONS:
BAND 10M 12M 15M 17M 20M
Reflector
Driven Ele.
Purposely left blank – Use to record specific data as assembled.
20m
17m
15m
12m
10m
Location of Cubex
Matching
Transformer when
used.
6" dia Coil
Excess
Cable
Boo
m
Mast
Antenn
a

Instructions:Cubex - MARK II Series
Cubex Co., Inc. 06-03 Rev 9
Pg. 7
Truss guying of the boom is advisable when using2 inch boom material in lengths greater than
8 feet. Heavy duty booms (2” x 0.125) do not require the bridge truss arrangement.
A good grade of non-metalic outdoor grade nylon or dacron line may be used. (Cubex Dacron
Antenna Rope is ideal and supplied with our larger antennas).
2” Boom to Mast
Mounting Plate

Instructions:Cubex - MARK II Series
Cubex Co., Inc. 06-03 Rev 9
Pg. 8
Stranded Wire Element Preparation
CAUTION: Working with stranded antenna wire certain precautions are required. First to
prevent wire strands from unraveling when cutting to proper lengths it is important to flow
solder about ½” either side of the cut point. Becareful as the wires may be very hot after
soldering.
The second caution comes when un-spooling the wire to the necessary lengths. It is
recommended that the wire be “unrolled” from the roll and not “stripped”, as this will accentuate
the spiral wrap tendency leading to wire kinks. Always be on the watch for wire kinks forming
and take appropriate action to prevent them. If one should occur, it may be recoverable by
carefully straightening it while smoothing.
Wire Element Support - "Wire Wrap"
After feeding the element wire through the spreader arm holes, and checking for arm
alignment, the "wire wrap" should be applied. This following procedure will assure minimum
flexing of the element wire at the arm attachment point and to maintain element/spreader arm
alignment we recommend securing all 20 meter and 17 meter element arm attachment points
in the following manner. Generally speaking 15, 12 or 10 meter elements will not need this
treatment. Sufficient "Wire Wrap" wire has been provided for this procedure - follow the
diagram below.
Wire
Element
NEXT
1 or 2 snug wraps
around the
spreader Arm
START
4 turns around element
wire - spread over
about 1-1/2" SPREADER
ARM
FINISH
4 turns around element wire -
spread over about 1-1/2"

Instructions:Cubex - MARK II Series
Cubex Co., Inc. 06-03 Rev 9
Pg. 9
Additional Notes on feeding:
Separate lines are to be preferred over the simplified “Single FEED LINE” method to a
common junction point of elements. This is not to say that the “SF” system is unacceptable,
but one must be prepared to accept some SWR compromise when using it If difficulty is
encountered in LOADING and/or SWR with either system.
FEED LINE PRUNING should be attempted as the NUMBER ONE approach when using
the “SF” approach.
Baluns are generally not needed and have proven effective in only a small percentage of
unusually rough situations. Fortunately, the great majority of quad installations perform very
satisfactorily without the need to resort tocomplicated matching systems, but in an
occasional "rare" case of difficulty, the Gamma Match (either individual or Tri-Gamma) has
proven to be a good solution. For Gamma Match information see historical notes at end of
instructions, or refer to Bill Orr’s book on Quads.
Fig. 3a
Alternate method-Line Splice
Reflector / Director
Connections - splice
or crimp sleeve
Locate the small bag of crimp sleeves (5 +1spare).
After completing the wiring of the Reflector and Director elements the ends must be connected to
complete the Quad loop. Slide both ends through the sleeve as shown in fig 3b. Pull wire through
to eliminate the slack in the wire. Temporarily fold each wire end as above to hold the wire
position. Check the tension in all of the sides of this element, making sure that the arms are
"square" and in line. Make an adjustment at the sleeve and if satisfied Crimp, or solder the element
wire into the sleeve. This technique allows you to get the element wire tension correct without
committing to a wire wrap or crimped connection.
Trim wire ends after
completing adjustment of
tension
Pull wires through sleeve and bend to
temporarily hold position
"Line men's" Splice
Connecting Element Wires -
Fig. 3b
Crimp Splice

Instructions:Cubex - MARK II Series
Cubex Co., Inc. 06-03 Rev 9
Pg. 10
Cubex Engineering
2 ELEMENT QUAD DIMENSIONS (PER SIDE)
10 M 12M 15M 17M 20MBAND Inches CM Inches CM Inches CM Inches CM Inches CM
Reflector 107.50 273.05 124.00 314.96 145.00 368.30 170.50 433.07 218.00 553.72
Driven El 105.00 266.70 120.75 306.71 142.00 360.68 166.50 422.91 212.00 538.48
ARM DRILLING DIMENSIONS
REFLECTOR:
|BUTT END
|-------------- 10M --------- 74-3/8” (188.91cm) ---------------------->
|-------------- 12M --------- 85-1/2” (217.17cm) ------------------------------>
|-------------- 15M --------- 101-0” (256.54 cm) -------------------------------------------->
|-------------- 17M ---------118 1/2” (301cm) ----------------------------------------------------->
|-------------- 20M --------- 152-5/8” (387.67cm) -------------------------------------------------------->
DRIVEN ELEMENT:
BUTT END
|-------------- 10M --------- 72-3/8” (183.83 cm) ------------------------->
|-------------- 12M --------- 83-3/8” (211.77 cm) ---------------------------------->
|-------------- 15M --------- 98-1/2” (250.19 cm) ------------------------------------------>
|-------------- 17M ---------115-1/2” (293.37 cm) ---------------------------------------------->
|-------------- 20M --------- 148-3/8” (376.87 cm) ----------------------------------------------------->
NOTE:
These dimensions are for reference only, actual dimensions may vary slightly from those above in actual
practice.
This manual suits for next models
2
Other CUBEX Antenna manuals
Popular Antenna manuals by other brands

Winegard
Winegard HD7698 instruction manual

Winegard
Winegard HD-8800 Specifications

NETGEAR
NETGEAR ProSafe ANT24D18 installation guide

SilentWind
SilentWind WEB-Catcher SW8WL User's manual & installation instructions

camping first
camping first Satmex 55 plus manual

Televes
Televes Omni-Nova Boss user manual

Diamond Antenna
Diamond Antenna KV5 Operation instructions

Ubiquiti
Ubiquiti Horn-5-30 quick start guide

KING Jack
KING Jack OA8300 manual

Sirio Antenne
Sirio Antenne Megawatt 3000 installation manual

Naval
Naval CAS 3500 quick start guide

Sirio Antenne
Sirio Antenne NEW TITANIUM 3001 Series installation manual