Installation manual
7BHFQ23P907+1357
Outdoor unit multi connection piping kit
4PW38477-1
Cutting suction gas reducer (1) and HP/LP gas reducer (2)
Connection piping
■Connect the suction gas and HP/LP pipes as shown in the figure
below. Before connecting the pipes, first connect the suction gas
joint and the suction gas reducer (1), the HP/LP joint and the
HP/LP reducer (1) and (2).
■See "Dimensions for installation" on page 6 for the location
(height) of the joint.
■Refer to the installation manual delivered with the outdoor unit for
cautions on brazing pipes.
■Keep the joint in a horizontal position (see view A).
■Connect the HP/LP gas reducer (1) by tilting it ±40° and connect
the HP/LP gas reducer (2), see view Ain the figure below.
■Refer to "Pipe size selection and cutting position of the joint" on
page 3 for the cutting requirements.
4. INSTALLATION OF LIQUID PIPES AND
EQUALIZER PIPES
Cutting the field supplied equalizer pipes
Use the following tables for standard installation (refer to
"Dimensions for installation" on page 6).
If dimension differ from standard installation, adjust the L dimension
of the equalizer pipes 1 and 2 accordingly.
For L dimension of equalizer pipes 1 and 2, dimension B of the field
supplied angled joint as in table 12 on page 5 has been taken into
account. If dimension B of the angled joint you use is different from
that dimension B, adjust the L dimension of the equalizer pipes 1 and
2 accordingly.
Table 17
Cutting liquid reducer (1)
Connection piping
■Connect the liquid pipes and equalizer pipes as shown in the
figure below.
Before connecting the pipes, first connect the liquid joint and the
liquid reducer (1).
■Refer to "Dimensions for installation" on page 6.
■Keep the joint in a horizontal position as shown in view A in the
figure below
■Connect the liquid reducer (1) in an angle of ±90° and bend the
field supplied liquid pipe up to the stop valve as shown in the
figure.
■Refer to the installation manual delivered with the outdoor unit
for cautions on brazing pipes.
■Refer to "Pipe size selection and cutting position of the joint" on
page 3 for the cutting requirements.
Suction gas
reducer (1) HP/LP gas
reducer (2)
1Connection to suction gas
pipe 1 (field supply)
2Connection to suction gas joint
3Cutting position
4Connection to HP/LP gas pipe 1
(field supply)
5Connection to HP/LP gas
reducer (1)
6No cutting for 18~24 Hp
1HP/LP gas accessory pipe (1) supplied with the outdoor unit
2Suction gas accessory pipe (1) supplied with the outdoor unit
3HP/LP gas pipe (1) (field supply) refer to table 15 on page 6
4Suction gas pipe (1) (field supply) refer to table 13 on page 6
5Joint (1) (angle of 90°) (field supply) refer to table 14 on page 6
6Joint (3) (angle of 90°) (field supply) refer to table 16 on page 6
7HP/LP gas pipe (3) (field supply) refer to table 15 on page 6
8Suction gas joint
9Suction gas pipe (3) (field supply) refer to table 13 on page 6
10 HP/LP gas joint
11 Suction gas reducer (1)
12 HP/LP gas reducer (2)
13 HP/LP gas reducer (1)
14 Suction gas pipe (field supply) (select the pipe length on site)
15 HP/LP gas pipe (field supply) (select the pipe length on site)
16 Suction gas pipe (4) (field supply) refer to table 13 on page 6
17 Joint (2) (angle of 90°) (field supply) refer to table 14 on page 6
18 Joint (4) (angle of 90°) (field supply) refer to table 16 on page 6
19 HP/LP gas pipe (5) (field supply) refer to table 15 on page 6
20 HP/LP gas pipe (4) (field supply) refer to table 15 on page 6
21 Suction gas pipe (2) (field supply) refer to table 13 on page 6
22 HP/LP gas pipe (2) (field supply) refer to table 15 on page 6
23 Suction gas accessory pipe (2) supplied with the outdoor unit
24 HP/LP gas accessory pipe (2) supplied with the outdoor unit
18 Hp
20~32 Hp
14
2
33
6
26~32 Hp
5
40°
24
18 20
8
10
232221
19 181716 181514
11 128
17
12345
13
9 10
7
6
A
A
0°±15
view
0°±15
Equalizer pipe
Pipe 1 (L mm) Pipe 2 (L mm)
95 120
1Connection to liquid pipe (field supply)
2Connection to liquid joint
3Cutting position
4No cutting for 18 Hp
L
20~32 Hp
1
2
3
4