
MARINA POWER DOCK INSTALLATION
10 Mountain View Drive | Shelton, CT 06484 | P: 800-521-3175 | www.electri-cable.com
9065-0269 REV B © ECA–January 2017—Product specifications subject to change without notice Page 1
Notes: * Ensure all screws will not pierce finished work surface.
** It is important that the Marina is centered in cutout and there is
a consistent air gap between the Marina and opening.
Surface Preparation:
1- Provide a cutout in surface for the Marina
Power Dock at desired location as shown in
Fig.1. (Note Fig. 1 represents underside of
work surface).
2- Mark or pilot drill the location for center
mounting screws as shown in Fig.1. *
Marina Power Dock Installation:
1- Install 1 - #10 pan head screw (not provided) into center mounting screw position on underside of work
surface, see Fig.1. Do not fully tighten screw at this point.
2- Insert middle flange slot of one end of the Marina onto mounting screw to support the Marina while
installing 2nd - #10 pan head screw (not provided) align with the other center mounting screw position. Do
not fully tighten screws at this point.
3- Center the Marina in the cutout and secure to underside of surface using remaining holes in side flanges.**
4- Tighten center screws from step 1 and 2 above.
Components & Hardware
Marina Grommet