
3
TABLE OF CONTENTS
Verify Contents Received...............................................2
Table Of Contents..........................................................3
Physical Data.................................................................4
1 - Important Information.............................................6
2 - Introduction.............................................................7
2.3 Requirements For Commonwealth Of Massachusetts:
................................................................................ 7
2.4 Use Of Carbon Monoxide Monitor.............................. 7
2.5 Designated Use ..................................................... 7
2.6 The Unit Must Not:................................................. 7
2.7 Operational Features.............................................. 7
3 - Component Listing .................................................11
4 - Locating Boiler.......................................................14
4.1 Boiler Location Considerations ..............................14
4.2 Clearances..........................................................15
4.3 Wall Mounting ......................................................16
5 - Combustion Air And Vent Piping.............................17
5.1 General...............................................................17
5.2 Removal Of Existing Boiler From Common Vent System
...............................................................................18
...........................................................18
5.4 Approved Venting Materials ...................................19
5.5 Vent Termination ..................................................19
5.6 Coaxial Venting Instructions...................................21
5.7 Coaxial Vent Screw Placement ...............................22
5.8 Twin Pipe Systems................................................23
5.9 Securing Twin Pipe Polypropylene Venting ............ 24
5.10 (3" / 80 Mm Only) Flexible Vent System .......... 27
5.11 Condensate Piping ..............................................29
6 - Hydronic Piping......................................................30
6.1 General...............................................................30
6.2 Special Conditions ................................................31
6.3 Safety Relief Valve And Air Vent..............................31
6.4 Trim Piping ..........................................................32
6.5 System Piping ......................................................32
.......................34
6.7 Manufacturer Recommendation - Strainer ............ 35
6.8 Central Heating System.........................................36
6.9 Domestic Hot Water Mode......................................36
6.10 Frost Protection Mode..........................................36
6.11 Pump Protection .................................................36
7 - Gas Supply Piping ..................................................37
7.1 General...............................................................37
7.2 Gas Pipe Recommendations ...................................38
7.3 Leak Check Gas Piping ..........................................40
...........................................................40
8 - Electrical Connections............................................41
8.1 General...............................................................41
8.2 Install Room Thermostat........................................41
8.3 Electrical Connections............................................41
8.4 Access To Connection Block....................................42
8.5 Main Supply Connection.........................................42
8.6 Install Room End Switch........................................43
8.7 Optional Electrical Connections...............................43
8.8 Indirect Storage Tank............................................45
8.9 Management Of 0-10v Input ..................................45
9 - Start Up Procedure.................................................47
9.1 Central Heating System Connections - Heat Only .. 47
9.2 Central Heating System Connections - Combi ....... 48
9.3 System Start Up...................................................49
9.4 Fill Condensate Trap With Water .............................49
9.5 Control Panel .......................................................50
9.6 Prior To Commissioning:........................................51
9.7 Commissioning For The First Time: .........................51
9.8 Automatic Calibration Function ...............................51
9.9 Manual Calibration Function:..................................52
9.10 De-Aeration Function...........................................52
9.11 Commission Set Up (Gas) - Changing The Type Of Gas
...............................................................................52
9.12 Chimney Sweep Function ....................................53
9.13 Combustion Adjustment Function (Co2%)........... 53
9.14 Check Firing Rate................................................53
9.15 Parameter Settings .............................................54
9.16 Description Of Parameters: Factory Settings ....... 55
9.17 Adjusting Maximum Heating Power........................56
10 - Operating Instructions.........................................57
10.1 Testing For Gas Leaks And Purging The Gas Supply
...............................................................................57
10.2 Boiler Operation..................................................57
10.3 Central Heating Mode..........................................57
10.4 Domestic Hot Water Mode....................................57
10.5 Frost Protection ..................................................58
10.6 Pump ................................................................58
10.7 Low Water Pressure Sensor (Internal) .............. 58
11 - General Maintenance And Cleaning ......................59
11.1 Beginning Of Each Heating Season........................59
11.2 Maintenance And Routine Servicing .......................60
11.3 Component Replacement And Cleaning .............. 60
11.4 Draining The Boiler..............................................61
11.5 Draining The Heating Circuit.................................61
11.6 Hydraulic Unit (Dhw)...........................................62
11.7 Cleaning The Cold Water Filter..............................62
11.8 Final Commissioning............................................62
11.9 Final Assembly ...................................................62
11.10 User Information...............................................63
11.11 Safety Flue Thermostat
.......................................63
11.12 Flue Pressure Switch (125-150 Only)
................. 63
11.13 Replacement Parts.............................................63
12 - Ratings And Capacities.........................................64
12.1 Ratings And Capacity...........................................64
........................64
12.3 High Altitude Ratings...........................................65
12.4 High Altitude Chart..............................................65
13 - Trouble Shooting..................................................67
13.1 Error Messages And Resetting The Boiler............ 67
13.2 Anomalies Table For The Installer - Use This Table To
Report The Anomaly Values. ........................................69
14 - Glossary...............................................................70
Appendix A - Wiring Diagrams............................... 72-77
240013360
REV A [07/01/2021]