
866.463.2611 •www.ecosystemsdisplays.com
Setups
Order #XXXXX - ECO-30C Sustainable Pedestal
Infill Panel
Infill
Panel
4
7A
2
6A
5A 1
3
5
78
8A
Counter
Assembled
Door
Shelf/Bottom
6
When assembled
Item
1
2
3
4
5
5A
6
6A
7/7A
8/8A
Qty.
1
1
1
1
1
1
1
1
1/1
1/1
Description
40”h RSG540 Oval Vertical Extrusion w/ Door Hinge
40”h RSG540 Oval Vertical Extrusion w/ Door Stop
40”h RSG540 Oval Vertical Extrusion
40”h RSG540 Oval Vertical Extrusion
8”w Z46 Horizontal Extrusion w/ lip
8”w Z45 Horizontal Extrusion
8”w Z46 Horizontal Extrusion w/ lip
8”w Z45 Horizontal Extrusion
22”w Z45 Curved Horizontal Extrusion
16.138”w Z45 Curved Horizontal Extrusion
Steps:
1) Connect horizontals [5] between verticals [1] & [4];
Place Infill; secure with horizontal [5A].
2) Connect horizontal [6] between verticals [2] & [3];
Place Infill; secure with horizontal [6A].
3) Attach curved horizontal [7] between verticals [3] & [4];
Place Infill; secure with horizontal [7A].
4) Connect curved horizontal [8] between verticals [1] & [2].
5) Place Shelf/Bottom to rest on lips of horizontals [5] & [6].
6) Connect curved horizontal [8A] between verticals [1] & [2].
7) Place Counter on top of assembed pedestal body.
8) Hange assembled door on the hinges attached to vertical [1].
See Door Attachment detail.
*
*Door
Hinge
Hinge
Slide pin into
hinge attached
to vertical.
Slide door
hinge over pin.
Door Attachment
*
Pin
I
n
f
i
l
l
P
a
n
e
l